Law modifications for the current biennium
Citation CitationSort Type S.L. Bill Bill Section BillSectionSort Effective Date Status of Bill Reflected in Statute
1-18 2025‑25 H40 1(a) 1 06/26/2025 Yes
1-52 (21) 2026‑41 S257 39.5(c) 39.5B 07/01/2026 No
1-54 (9) 1 2026‑40 S1041 4.1 4.1 10/01/2026 No
1-54 (10) 2 2026‑41 S257 39.5(b) 39.5A 07/01/2026 No
1-75.4 2025‑25 H40 29(1) 29 06/26/2025 Yes
1-82 2025‑20 H91 2.1 2.1 06/26/2025 Yes
1-283 2025‑54 H620 12(a) 12 07/02/2025 Yes
1-339.1 (a)(5) 2026‑31 S595 10(a) 10 07/02/2026 No
1-507.24 (e1) 2026‑54 H133 3 3 04/01/2027 No
1-507.34 2025‑25 H40 29(1) 29 06/26/2025 Yes
1-538.2 2025‑71 S311 4(e) 4 12/01/2025 Yes
1-539.2A 2025‑25 H40 29(1) 29 06/26/2025 Yes
1-569.17 2025‑25 H40 2 2 06/26/2025 Yes
1A-1-4 2025‑25 H40 29(1) 29 06/26/2025 Yes
1A-1-5 2025‑25 H40 29(1) 29 06/26/2025 Yes
1A-1-63 2025‑54 H620 19(a) 19 07/02/2025 Yes
1C-1601 (a)(10) 2025‑46 H378 6(b) 6 09/01/2025 Yes
1C-1601.5 2025‑46 H378 6(a) 6 09/01/2025 Yes
1E-1 Chapter, title 1 2025‑57 S655 1 1 07/03/2025 Yes
1E-1 2 2025‑57 S655 1 1 07/03/2025 Yes
1E-10 2025‑57 S655 1 1 07/03/2025 Yes
1E-11 2025‑57 S655 1 1 07/03/2025 Yes
1E-12 2025‑57 S655 1 1 07/03/2025 Yes
1E-20 2025‑57 S655 1 1 07/03/2025 Yes
1E-20 (c), (f) 2026‑44 S355 5.3 5.3 07/07/2026 No
6-20 2026‑41 S257 16.15(a) 16.991 07/07/2026 No
6-21 (13), (14) 2025‑94 H926 2.5 2.5 10/06/2025 Yes
6-21.6 2025‑25 H40 43 43 06/26/2025 Yes
6-21.7 2026‑41 S257 39.5(h) 39.5G 07/01/2026 No
7A-27 2025‑93 H307 6.5(e) 6.5 10/03/2025 Yes
7A-27 (b) 2026‑41 S257 16.19(f) 16.999 07/01/2026 No
7A-29 (a) 2026‑40 S1041 4.2 4.2 10/01/2026 No
7A-38.1 (l) 2025‑54 H620 18(a) 18 07/02/2025 Yes
7A-38.2 2025‑25 H40 29(5) 29 06/26/2025 Yes
7A-38.3B 2025‑54 H620 18(c) 18 07/02/2025 Yes
7A-38.3D (k) 2025‑54 H620 18(d) 18 07/02/2025 Yes
7A-38.3F 2025‑25 H40 29(5) 29 06/26/2025 Yes
7A-38.3F 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
7A-38.4A (j) 2025‑54 H620 18(b) 18 07/02/2025 Yes
7A-40.1 2025‑54 H620 12.5(a) 12.5 07/02/2025 Yes
7A-45.1 2026‑41 S257 16.19(b) 16.997 07/01/2026 No
7A-45.1 2026‑41 S257 16.24(a) 16.9990 07/01/2026 No
7A-45.1 2026‑42 H56 5.1(a) 5.1 07/01/2026 No
7A-45.3 2025‑54 H620 14(a) 14 12/01/2025 Yes
7A-45.4 2025‑54 H620 14(b) 14 12/01/2025 Yes
7A-45.4 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
7A-47.4 2025‑54 H620 7 7 07/02/2025 Yes
7A-49.5 (b2) 2025‑54 H620 21 21 07/02/2025 Yes
7A-49.5 (f) 2026‑41 S257 16.9(b) 16.9 07/07/2026 No
7A-60 2026‑41 S257 16.20(g) 16.999f 07/01/2027 No
7A-60 (a1) 2025‑93 H307 9(a) 9 07/01/2025 Yes
7A-60 (a1) 2026‑41 S257 16.4(a) 16.4 07/01/2026 No
7A-60 (a1) 2026‑41 S257 16.4(b) 16.4 01/01/2027 No
7A-60 (a3) 2025‑97 S449 5.6(b) 5.6 07/01/2025 Yes
7A-60 (a3) 2026‑41 S257 16.18 16.995 07/01/2026 No
7A-64 2026‑41 S257 16.20(g) 16.999F 07/01/2027 No
7A-65 2026‑41 S257 16.20(g) 16.999F 07/01/2027 No
7A-68 2026‑41 S257 16.20(g) 16.999F 07/01/2027 No
7A-69 2026‑41 S257 16.20(g) 16.999F 07/01/2027 No
7A-69.2 2026‑41 S257 16.20(g) 16.999F 07/01/2027 No
7A-95 (c) 2025‑54 H620 12.3 12.3 07/02/2025 Yes
7A-101 (a) 2026‑41 S257 41.7 41.7 07/01/2026 No
7A-102 (c1) 2026‑41 S257 41.8 41.8 07/01/2026 No
7A-105 2025‑54 H620 13(a) 13 07/02/2025 Yes
7A-109 (d) 2025‑92 H358 5.2 5.2 07/01/2025 Yes
7A-133 (a) 2026‑41 S257 16.2 16.2 01/01/2027 No
7A-140.1 2025‑54 H620 12.5(b) 12.5 07/02/2025 Yes
7A-146 (13) 2026‑40 S1041 4.3 4.3 10/01/2026 No
7A-171 (a) 2025‑54 H620 16 16 07/02/2025 Yes
7A-171.1 (a)(1) 2026‑41 S257 41.9 41.9 07/01/2026 No
7A-171.3 (1) 2025‑93 H307 3(a) 3 10/03/2025 Yes
7A-173 2025‑93 H307 3(b) 3 10/03/2025 Yes
7A-232 2025‑54 H620 3(a) 3 07/02/2025 Yes
7A-300.1 2026‑41 S257 16.17(a) 16.994 07/07/2026 No
7A-300.1 2026‑41 S257 16.20(h) 16.999G 07/01/2027 No
7A-301 2025‑54 H620 17 17 07/02/2025 Yes
7A-304 (a) 2026‑37 H1173 1(a) 1 12/01/2026 No
7A-304 (a) 2026‑41 S257 16.21(a) 16.999W 12/01/2026 No
7A-304 (a)(2a) 2026‑41 S257 16.23(a) 16.999Y 12/01/2026 No
7A-304 (a)(3c) 2026‑41 S257 16.30(a) 16.9995B 12/01/2026 No
7A-305 2026‑41 S257 16.15(b) 16.992 07/07/2026 No
7A-305 2026‑41 S257 16.19(e) 16.998 07/01/2026 No
7A-305 2026‑41 S257 16.21(b) 16.999W 12/01/2026 No
7A-305 (a2) 2026‑41 S257 22.1(a) 22.1 12/01/2026 No
7A-306 (a)(1a) 2026‑41 S257 16.23(b) 16.999Z 12/01/2026 No
7A-307 (a)(1a) 2026‑41 S257 16.23(c) 16.999Z 12/01/2026 No
7A-308 (c), (c1) 2026‑41 S257 16.1 16.1 07/01/2026 No
7A-314 2026‑41 S257 16.20(i) 16.999H 07/01/2027 No
7A-315 2026‑41 S257 16.20(j) 16.999I 07/01/2027 No
7A-316 2026‑41 S257 16.20(k) 16.999J 07/01/2027 No
7A-339 Art. 28E, Part 1 2026‑40 S1041 3 3 10/01/2026 No
7A-339.05 2026‑40 S1041 3 3 10/01/2026 No
7A-339.10 2026‑40 S1041 3 3 10/01/2026 No
7A-339.15 Art. 28E, Part 2 2026‑40 S1041 3 3 10/01/2026 No
7A-339.20 Art. 28E, Part 3 2026‑40 S1041 3 3 10/01/2026 No
7A-339.25 2026‑40 S1041 3 3 10/01/2026 No
7A-339.30 2026‑40 S1041 3 3 10/01/2026 No
7A-339.35 2026‑40 S1041 3 3 10/01/2026 No
7A-339.40 2026‑40 S1041 3 3 10/01/2026 No
7A-339.45 2026‑40 S1041 3 3 10/01/2026 No
7A-339.50 2026‑40 S1041 3 3 10/01/2026 No
7A-343 2026‑41 S257 16.20(l) 16.999K 07/01/2027 No
7A-343 (13) 2025‑57 S655 2 2 07/03/2025 Yes
7A-343 (6c) 2025‑54 H620 15 15 07/02/2025 Yes
7A-343 (8a) 2026‑41 S257 16.11(a) 16.97 07/07/2026 No
7A-343.1 (a) 2025‑57 S655 3 3 07/03/2025 Yes
7A-343.1 (a) 2025‑54 H620 1 1 07/02/2025 Yes
7A-347 2026‑41 S257 16.20(m) 16.999L 07/01/2027 No
7A-348 2026‑41 S257 16.20(n) 16.999M 07/01/2027 No
7A-354.1 2026‑41 S257 16.6(a) 16.6 07/01/2026 No
7A-411 2026‑41 S257 16.20(d) 16.999D 07/01/2027 No
7A-411 Subchapter VIII title 2026‑41 S257 16.20(a) 16.999A 07/01/2027 No
7A-411.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-411.1 Art. 32, Part 1 2026‑41 S257 16.20(b) 16.999B 07/01/2027 No
7A-412 2026‑41 S257 16.20(d) 16.999D 07/01/2027 No
7A-413 2026‑41 S257 16.20(d) 16.999D 07/01/2027 No
7A-413.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-413.2 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-414 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-414.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-414.2 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-415 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-415.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-416 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-417 2026‑41 S257 16.20(d) 16.999D 07/01/2027 No
7A-417 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-417 Art. 32, Part 2 2026‑41 S257 16.20(c) 16.999C 07/01/2027 No
7A-418 2026‑41 S257 16.20(d) 16.999D 07/01/2027 No
7A-418 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-419 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-420 2026‑41 S257 16.20(d) 16.999D 07/01/2027 No
7A-420 2026‑41 S257 16.20(f) 16.999E 07/01/2027 No
7A-458 2026‑41 S257 16.29(a) 16.9995 07/07/2026 No
7A-498.5 (f) 2026‑41 S257 16.29(b) 16.9995A 07/07/2026 No
7A-498.5 (g1) 2026‑41 S257 16.26(a) 16.9993 07/07/2026 No
7A-498.7 (a) 2026‑41 S257 16.31 16.9995C 07/01/2026 No
7A-754 2026‑40 S1041 4.4 4.4 10/01/2026 No
7A-759 2026‑40 S1041 4.5 4.5 10/01/2026 No
7A-760 2026‑40 S1041 4.6 4.6 10/01/2026 No
7A-792 2025‑54 H620 2(b) 2 08/01/2025 Yes
7A-793 2025‑54 H620 2(c) 2 08/01/2025 Yes
7A-801 2025‑54 H620 2(a) 2 08/01/2025 Yes
7B-100 Art 1, Subchapter I, title 2025‑59 S442 1(a) 1 07/03/2025 Yes
7B-101 2025‑16 H612 1.1 1.1 10/01/2025 Yes
7B-101 (14a) 2025‑16 H612 1.10(a) 1.10 04/01/2026 Yes
7B-102 2025‑59 S442 1(b) 1 07/03/2025 Yes
7B-201 (a) 1 2025‑16 H612 1.2(a) 1.2 06/26/2025 Yes
7B-302 (a) 1.5 2025‑16 H612 1.3(a) 1.3 10/01/2025 Yes
7B-302 (c) 2 2025‑16 H612 1.10(c) 1.10 04/01/2026 Yes
7B-302 (d) 3 2025‑16 H612 1.10(d) 1.10 04/01/2026 Yes
7B-302 (f), (g) 4 2025‑16 H612 1.3(a) 1.3 10/01/2025 Yes
7B-302.1 2025‑16 H612 1.4(a) 1.4 10/01/2025 Yes
7B-303 (a) 1 2025‑16 H612 1.10(e) 1.10 04/01/2026 Yes
7B-303 (c) 2 2025‑16 H612 1.3(b) 1.3 10/01/2025 Yes
7B-305 2025‑16 H612 1.3(c) 1.3 10/01/2025 Yes
7B-306 2025‑16 H612 1.3(d) 1.3 10/01/2025 Yes
7B-308 (b) 2025‑16 H612 1.3(e) 1.3 10/01/2025 Yes
7B-323 (e) 2025‑16 H612 1.19(a) 1.19 10/01/2025 Yes
7B-325 2025‑16 H612 1.19(b) 1.19 10/01/2025 Yes
7B-400 (c) 2025‑16 H612 1.4(b) 1.4 10/01/2025 Yes
7B-401.1 (e1), (g), (h) 2025‑16 H612 1.5 1.5 10/01/2025 Yes
7B-403 (a) 2025‑16 H612 1.10(f) 1.10 04/01/2026 Yes
7B-403 (b) 2025‑16 H612 1.3(f) 1.3 10/01/2025 Yes
7B-404 (b) 2025‑16 H612 1.6(c) 1.6 10/01/2025 Yes
7B-502 (b) 2025‑16 H612 1.6(a) 1.6 10/01/2025 Yes
7B-505 (a) 2025‑16 H612 1.11(c) 1.11 06/26/2025 Yes
7B-506 (a) 2025‑16 H612 1.6(b) 1.6 10/01/2025 Yes
7B-508 2025‑16 H612 1.7 1.7 10/01/2025 Yes
7B-600 (b), (b2) 2025‑16 H612 1.8 1.8 10/01/2025 Yes
7B-602 (b) 2025‑16 H612 1.9 1.9 10/01/2025 Yes
7B-604 2025‑16 H612 1.10(b) 1.10 04/01/2026 Yes
7B-903 (a)(6) 2025‑16 H612 1.11(b) 1.11 06/26/2025 Yes
7B-903.1 (c) 2025‑16 H612 1.11(a) 1.11 06/26/2025 Yes
7B-903.2 2025‑16 H612 1.12(a) 1.12 06/26/2025 Yes
7B-904 (d), (d1), (e) 2025‑16 H612 1.14(a) 1.14 06/26/2025 Yes
7B-906.1 2025‑16 H612 1.13(a) 1.13 10/01/2025 Yes
7B-906.2 2025‑16 H612 1.13(b) 1.13 10/01/2025 Yes
7B-909.2 2025‑16 H612 1.18(a) 1.18 10/01/2025 Yes
7B-909.3 2025‑16 H612 1.18(b) 1.18 10/01/2025 Yes
7B-1109 (f) 2025‑16 H612 1.14(b) 1.14 10/01/2025 Yes
7B-1114 2025‑16 H612 1.14(d) 1.14 06/26/2025 Yes
7B-1407 (b), (c) 2025‑27 H576 4.1(a) 4.1 07/01/2025 Yes
7B-1903 2025‑54 H620 10(a) 10 12/01/2025 Yes
7B-1904 2025‑54 H620 10(b) 10 12/01/2025 Yes
7B-2204 (d) 2025‑25 H40 3 3 06/26/2025 Yes
7B-2401.1 (5a) 2026‑41 S257 19.11(a) 19.9A 12/01/2026 No
7B-2401.2 (b) 2026‑41 S257 19.11(a) 19.9B 12/01/2026 No
7B-2401.3 (h) 2026‑41 S257 19.11(a) 19.9C 12/01/2026 No
7B-2510 (c), (c1), (d) 2025‑93 H307 8(a) 8 12/01/2025 Yes
7B-2511 2025‑93 H307 8(b) 8 12/01/2025 Yes
7B-2514 (b), (b1), (g) 2025‑93 H307 8(c) 8 12/01/2025 Yes
7B-3101 (a) 2025‑70 S429 10 10 07/09/2025 Yes
7B-4001 2025‑25 H40 29(6) 29 06/26/2025 Yes
8-50.4 2025‑47 S391 13(c) 13 10/01/2025 Yes
8C-1 Rule 416 2026‑37 H1173 5(a) 5 12/01/2026 No
9-37 Art. 6 2025‑54 H620 12.2(a) 12.2 12/01/2025 Yes
10B-5 (b)(8), (d) 2025‑25 H40 44(b) 44 06/26/2025 Yes
10B-5 (b)(8), (e) 2025‑25 H40 44(a) 44 06/26/2025 Yes
10B-7 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
10B-25 (n) 2025‑33 H388 9(a) 9 07/01/2025 Yes
10B-25 (n) 2026‑52 H517 7A(a) 7A 07/07/2026 No
10B-36 2025‑25 H40 29(5) 29 06/26/2025 Yes
10B-50 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
10B-51 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
10B-54 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
10B-106 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
10B-126 2025‑25 H40 29(6) 29 06/26/2025 Yes
10B-200 (b) 2025‑33 H388 9(b) 9 07/01/2025 Yes
10B-200 (b) 2026‑52 H517 7A(b) 7A 07/07/2026 No
12-3.3 2025‑84 H805 1(a) 1 01/01/2026 Yes
14-16.6 Art. 5A, title 2025‑81 H193 4 4 12/01/2025 Yes
14-16.7 2025‑81 H193 4 4 12/01/2025 Yes
14-16.8 2025‑81 H193 4 4 12/01/2025 Yes
14-16.10 2025‑81 H193 4 4 12/01/2025 Yes
14-27.31 (b), (d) 2025‑70 S429 9 9 12/01/2025 Yes
14-32.6 2025‑70 S429 18(a) 18 12/01/2025 Yes
14-33 (b) 2025‑71 S311 1(a) 1 12/01/2025 Yes
14-33 (e) 2025‑70 S429 17(a) 17 12/01/2025 Yes
14-33.2 2025‑70 S429 17(b) 17 12/01/2025 Yes
14-34.5 2025‑ S50 9.1(a) 9.1 12/01/2025 Vetoed No
14-34.6 (c) 2025‑ S50 9.1(b) 9.2 12/01/2025 Vetoed No
14-35 2025‑73 S375 1(b) 1 12/01/2025 Yes
14-44.1 2025‑25 H40 29(5) 29 06/26/2025 Yes
14-49 2025‑71 S311 5(a) 5 12/01/2025 Yes
14-50.16A 2026‑37 H1173 2(a) 2 12/01/2026 No
14-50.17 2026‑37 H1173 3(a) 3 12/01/2026 No
14-50.18 2026‑37 H1173 3(b) 3 12/01/2026 No
14-50.32 2026‑37 H1173 4(a) 4 12/01/2026 No
14-50.33 2026‑37 H1173 4(b) 4 12/01/2026 No
14-50.34 2026‑37 H1173 4(c) 4 12/01/2026 No
14-50.35 2026‑37 H1173 4(d) 4 12/01/2026 No
14-51 2025‑71 S311 10(a) 10 12/01/2025 Yes
14-52 2025‑71 S311 10(b) 10 12/01/2025 Yes
14-53 2025‑71 S311 10(c) 10 12/01/2025 Yes
14-54 2025‑71 S311 10(d) 10 12/01/2025 Yes
14-54 (b1) 2025‑71 S311 4(a) 4 12/01/2025 Yes
14-72 (c1) 2025‑71 S311 9(a) 9 12/01/2025 Yes
14-72.12 2025‑71 S311 4(b) 4 12/01/2025 Yes
14-78 2026‑11 S401 16(a) 16 12/01/2026 No
14-86.5 2025‑71 S311 4(c) 4 12/01/2025 Yes
14-86.6 2025‑71 S311 4(d) 4 12/01/2025 Yes
14-107.2 2026‑41 S257 16.20(o) 16.999N 07/01/2027 No
14-113.7A 2025‑25 H40 4 4 06/26/2025 Yes
14-113.20 2025‑25 H40 29(3) 29 06/26/2025 Yes
14-113.20 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-113.30 2025‑25 H40 29(3) 29 06/26/2025 Yes
14-113.31 2025‑25 H40 29(3) 29 06/26/2025 Yes
14-118.7 2025‑25 H40 29(3) 29 06/26/2025 Yes
14-159.4 2026‑41 S257 19.5(a) 19.5 12/01/2026 No
14-159.5 2026‑41 S257 19.5(b) 19.5A 12/01/2026 No
14-159.12 (a)(4) 2025‑57 S655 4 4 12/01/2025 Yes
14-159.15 2025‑94 H926 2(b) 2 10/06/2025 Yes
14-159.50 Art. 22D 2025‑ H96 1 1 12/01/2025 Vetoed No
14-159.50 Art. 22D 2025‑88 S55 1 1 12/01/2025 Yes
14-159.51 2025‑ H96 1 1 12/01/2025 Vetoed No
14-159.51 2025‑88 S55 1 1 12/01/2025 Yes
14-159.52 2025‑ H96 1 1 12/01/2025 Vetoed No
14-159.52 2025‑88 S55 1 1 12/01/2025 Yes
14-159.53 2025‑ H96 1 1 12/01/2025 Vetoed No
14-159.53 2025‑88 S55 1 1 12/01/2025 Yes
14-159.54 2025‑ H96 1 1 12/01/2025 Vetoed No
14-159.54 2025‑88 S55 1 1 12/01/2025 Yes
14-159.55 2025‑ H96 1 1 12/01/2025 Vetoed No
14-159.55 2025‑88 S55 1 1 12/01/2025 Yes
14-159.56 2025‑ H96 1 1 12/01/2025 Vetoed No
14-159.56 2025‑88 S55 1 1 12/01/2025 Yes
14-190.7 2026‑34 H83 1(a) 1 12/01/2026 No
14-190.8 2026‑34 H83 1(b) 1 12/01/2026 No
14-190.15 2026‑34 H83 1(c) 1 12/01/2026 No
14-196.3 2025‑25 H40 29(3) 29 06/26/2025 Yes
14-196.3 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-202 2025‑70 S429 8(a) 8 12/01/2025 Yes
14-202.3 (c) 2025‑70 S429 3(a) 3 12/01/2025 Yes
14-202.5 2025‑25 H40 29(5) 29 06/26/2025 Yes
14-202.5 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-202.5A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
14-203 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-203 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
14-208.6 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-208.6 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-208.6 2026‑41 S257 20.2(n) 20.2I 07/07/2026 No
14-208.6 (4)g. 2026‑34 H83 1(d) 1 12/01/2026 No
14-208.7 2026‑41 S257 20.2(n) 20.2J 07/07/2026 No
14-208.8 2026‑41 S257 20.2(n) 20.2K 07/07/2026 No
14-208.8A (c) 2026‑41 S257 20.2(n) 20.2L 07/07/2026 No
14-208.9 2026‑41 S257 20.2(n) 20.2M 07/07/2026 No
14-208.9A (a)(1) 2026‑41 S257 20.2(n) 20.2N 07/07/2026 No
14-208.12A 2025‑70 S429 5(a) 5 12/01/2025 Yes
14-208.12A (a3) 2026‑41 S257 20.2(n) 20.2O 07/07/2026 No
14-208.12B (b), (j) 2025‑70 S429 5(b) 5 12/01/2025 Yes
14-208.12B (i) 2026‑41 S257 20.2(n) 20.2P 07/07/2026 No
14-208.13 2026‑41 S257 20.2(n) 20.2Q 07/07/2026 No
14-208.14 2026‑41 S257 20.2(n) 20.2R 07/07/2026 No
14-208.15 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-208.15 2026‑41 S257 20.2(n) 20.2S 07/07/2026 No
14-208.15A 2026‑41 S257 20.2(n) 20.2T 07/07/2026 No
14-208.18 (a) 2026‑41 S257 16.14(a) 16.990 12/01/2026 No
14-208.19 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-208.20 (b) 2026‑44 S355 2.1(a) 2.1 12/01/2026 No
14-208.22 2026‑41 S257 20.2(n) 20.2U 07/07/2026 No
14-208.27 2026‑41 S257 20.2(n) 20.2V 07/07/2026 No
14-208.31 2026‑41 S257 20.2(n) 20.2W 07/07/2026 No
14-269 2025‑ S50 4 4 12/01/2025 Vetoed No
14-269.1 2025‑ S50 5 5 12/01/2025 Vetoed No
14-269.2 (a)(1d), (1e) 2025‑81 H193 1 1 12/01/2025 Yes
14-269.2 (g)(8) 2025‑81 H193 2 2 12/01/2025 Yes
14-269.2 (k1) 2025‑81 H193 3 3 12/01/2025 Yes
14-269.3 2025‑ S50 6 6 12/01/2025 Vetoed No
14-269.4 (6) 2025‑ S50 7 7 12/01/2025 Vetoed No
14-277.2 (d) 2025‑ S50 8 8 12/01/2025 Vetoed No
14-277.3A 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-288.1 (3), (4b), (11) 2025‑18 H251 4(a) 4 12/01/2025 Yes
14-288.6 2025‑18 H251 4(b) 4 12/01/2025 Yes
14-288.9 2025‑25 H40 30 30 06/26/2025 Yes
14-292.2 (e)(3) 2026‑41 S257 39.6(a) 39.6 07/07/2026 No
14-313 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-313 2026‑41 S257 44.6(c) 44.6D 12/01/2027 No
14-313 (h) 2026‑31 S595 9(a) 9 07/02/2026 No
14-313 (h) 2026‑41 S257 44.6(b) 44.6C See Bill No
14-318.2 (c) 2025‑4 H74 5.4(a) 5.4 05/14/2025 Yes
14-318.2 (d) 2025‑59 S442 2(a) 2 07/01/2025 Yes
14-318.4 2025‑16 H612 3.2 3.2 12/01/2025 Yes
14-318.4 (c) 2025‑4 H74 5.4(b) 5.4 05/14/2025 Yes
14-318.4 (c1) 2025‑59 S442 2(b) 2 07/01/2025 Yes
14-318.4 (d)(2) 2025‑59 S442 2(b) 2 07/01/2025 Yes
14-318.7 2025‑70 S429 1(a) 1 12/01/2025 Yes
14-318.18 (3a) 2026‑41 S257 16.10(g) 16.96 07/01/2026 No
14-326.1 2025‑70 S429 16(a) 16 07/01/2025 Yes
14-344.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-344.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
14-344.2 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-344.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
14-395 2025‑20 H91 2.2 2.2 06/26/2025 Yes
14-401.24 (c)(5) 2025‑ S50 9 9 12/01/2025 Vetoed No
14-409.40 (f) 2025‑ S50 10 10 12/01/2025 Vetoed No
14-409.44 2025‑70 S429 23(a) 23 10/01/2025 Yes
14-409.45 2025‑81 H193 7 7 07/29/2025 Yes
14-409.46 2025‑81 H193 7 7 07/29/2025 Yes
14-409.46A 2025‑81 H193 7 7 07/29/2025 Yes
14-415.1 2025‑71 S311 8(a) 8 12/01/2025 Yes
14-415.1 1 2025‑ S50 15.6 15.6 12/01/2025 Vetoed No
14-415.1 (a2) 2 2025‑ S50 15.5 15.5 12/01/2025 Vetoed No
14-415.4 (e)(2) 2025‑ S50 11 11 12/01/2025 Vetoed No
14-415.10A 2025‑ S50 2 2 12/01/2025 Vetoed No
14-415.11 (a) 2025‑ S50 12 12 12/01/2025 Vetoed No
14-415.12 (a)(4)d. 2025‑51 S710 3(a) 3 10/01/2025 Yes
14-415.12 (b)(7), (11) 2025‑ S50 3 3 12/01/2025 Vetoed No
14-415.14 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-415.14 (a1) 2025‑72 S118 7(a) 7 10/01/2025 Yes
14-415.16 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-415.16 (a) 2025‑72 S118 7(b) 7.1 10/01/2025 Yes
14-415.19 (a2) 2025‑72 S118 1(a) 1 07/01/2025 Yes
14-415.22 2025‑ S50 13 13 12/01/2025 Vetoed No
14-415.27 2026‑41 S257 20.2(v) 20.3B 07/07/2026 No
14-415.35 Art. 54C 2025‑ S50 1 1 12/01/2025 Vetoed No
14-415.36 2025‑ S50 1 1 12/01/2025 Vetoed No
14-433 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-453 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-453 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-453 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
14-458 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-458.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-458.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-458.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
14-458.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
14-458.2 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
14-458.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
15-155.1 Art. 15A 2025‑25 H40 5 5 06/26/2025 Yes
15-155.2 2025‑25 H40 5 5 06/26/2025 Yes
15-155.3 2025‑25 H40 5 5 06/26/2025 Yes
15-187 2025‑93 H307 6.5(a) 6.5 10/03/2025 Yes
15-188 2025‑93 H307 6.5(b) 6.5 10/03/2025 Yes
15-188.1 2025‑93 H307 6.5(c) 6.5 10/03/2025 Yes
15-190 (a) 2025‑93 H307 6.5(d) 6.5 10/03/2025 Yes
15A-101.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
15A-101.1 2026‑44 S355 1.2(a) 1.2 07/07/2026 No
15A-145 2025‑25 H40 31(b) 31 06/26/2025 Yes
15A-145.1 2025‑25 H40 31(c) 31 06/26/2025 Yes
15A-145.2 (a)(2), (a1) 2025‑25 H40 31(d) 31 06/26/2025 Yes
15A-145.3 (a), (b1) 2025‑25 H40 31(e) 31 06/26/2025 Yes
15A-145.4 (c)(2), (f) 2025‑25 H40 31(f) 31 06/26/2025 Yes
15A-145.5 2025‑25 H40 31(a) 31 06/26/2025 Yes
15A-145.5 (c)(1)a. 2025‑71 S311 12(a) 12 07/09/2025 Yes
15A-145.6 (c)(2), (g) 2025‑25 H40 31(g) 31 06/26/2025 Yes
15A-145.7 (a)(2), (b) 2025‑25 H40 31(h) 31 06/26/2025 Yes
15A-145.8 (a) 2025‑25 H40 31(i) 31 06/26/2025 Yes
15A-145.8A (f) 2025‑25 H40 31(j) 31 06/26/2025 Yes
15A-145.9 (g) 2025‑25 H40 31(k) 31 06/26/2025 Yes
15A-146 (a3) 2025‑25 H40 31(l) 31 06/26/2025 Yes
15A-147 (b) 2025‑25 H40 31(m) 31 06/26/2025 Yes
15A-149 (c) 2025‑25 H40 31(n) 31 06/26/2025 Yes
15A-151 (a)(10) 2025‑51 S710 3(b) 3 10/01/2025 Yes
15A-153 (a), (b) 2025‑25 H40 31(o) 31 06/26/2025 Yes
15A-268 (b)(3)d.4. 2026‑41 S257 16.10(b) 16.91 07/01/2026 No
15A-290 2026‑41 S257 19.2(a) 19.2 12/01/2026 No
15A-401 (b) 2025‑70 S429 17(c) 17 12/01/2025 Yes
15A-501 (2a) 2025‑93 H307 1(a) 1 12/01/2025 Yes
15A-531 (9) 2025‑93 H307 1(b) 1 12/01/2025 Yes
15A-532 2026‑38 H1104 13(a) 13 12/01/2026 No
15A-533 2025‑97 S449 5.3(b) 5.3 10/22/2025 Yes
15A-533 (b), (b1) 2025‑93 H307 1(c) 1 12/01/2025 Yes
15A-533 (b1) 2026‑38 H1104 14(a) 14 07/06/2026 No
15A-534 1 2025‑93 H307 1(d) 1 12/01/2025 Yes
15A-534 (d4) 2 2025‑85 H318 2 2 10/01/2025 Yes
15A-534 (h) 3 2025‑54 H620 10(d) 10 12/01/2025 Yes
15A-534 (b) 4 2025‑97 S449 5.3(a) 5.3 10/22/2025 Yes
15A-534.1 (a) 2025‑70 S429 17(d) 17 12/01/2025 Yes
15A-534.2 (d) 2025‑27 H576 4.2(a) 4.2 06/27/2025 Yes
15A-534.9 2025‑81 H193 6 6 12/01/2025 Yes
15A-535 2025‑97 S449 5.3(b) 5.3 10/22/2025 Yes
15A-535 (b) 2025‑93 H307 1(e) 1 12/01/2025 Yes
15A-831 2026‑41 S257 16.20(p) 16.999O 07/01/2027 No
15A-960 (c) 2025‑54 H620 10(c) 10 12/01/2025 Yes
15A-1001 2026‑38 H1104 13(b) 13 12/01/2026 No
15A-1002 2026‑38 H1104 13(c) 13 12/01/2026 No
15A-1003 2026‑38 H1104 13(d) 13 12/01/2026 No
15A-1003 (a1) 2025‑93 H307 7(a) 7 12/01/2025 Yes
15A-1004 2026‑38 H1104 13(e) 13 12/01/2026 No
15A-1006 2026‑38 H1104 13(f) 13 12/01/2026 No
15A-1007 2026‑38 H1104 13(g) 13 12/01/2026 No
15A-1008 2026‑38 H1104 13(h) 13 12/01/2026 No
15A-1008 (c), (d) 2025‑93 H307 7(b) 7 12/01/2025 Yes
15A-1010 2026‑38 H1104 13(i) 13 12/01/2026 No
15A-1052 (b) 2025‑70 S429 4(a) 4 07/09/2025 Yes
15A-1053 (b) 2025‑70 S429 4(b) 4 07/09/2025 Yes
15A-1241 (b) 2025‑70 S429 11(a) 11 07/09/2025 Yes
15A-1340.16 (d)(19c) 2025‑93 H307 2(a) 2 12/01/2025 Yes
15A-1340.16E 2026‑37 H1173 6(a) 6 12/01/2026 No
15A-1340.50 Art. 81D 2025‑16 H612 3.1 3.1 12/01/2025 Yes
15A-1341 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
15A-1354 (a) 2025‑70 S429 19(a) 19 12/01/2025 Yes
15A-1368.2 (c1) 2026‑44 S355 5.1(a) 5.1 07/07/2026 No
15A-1411 (d) 2026‑41 S257 16.10(c) 16.92 07/01/2026 No
15A-1415 2025‑70 S429 15(a) 15 12/01/2025 Yes
15A-1415 (a) 2025‑93 H307 6(a) 6 12/01/2025 Yes
15A-1417 (a)(3a) 2026‑41 S257 16.10(d) 16.93 07/01/2026 No
15A-1418 (b) 2026‑41 S257 16.10(e) 16.94 07/01/2026 No
15A-1419 (a)(4) 2025‑70 S429 15(b) 15 12/01/2025 Yes
15A-1460 2026‑41 S257 16.10(a) 16.90 07/01/2026 No
15A-1462 2026‑41 S257 16.10(a) 16.90 07/01/2026 No
15A-1470 2026‑41 S257 16.10(a) 16.90 07/01/2026 No
15A-1475 2026‑41 S257 16.10(a) 16.90 07/01/2026 No
15A-1475 2026‑41 S257 16.20(q) 16.999P 07/01/2027 No
15A-2000 (d)(1) 1 2025‑93 H307 6(b) 6 12/01/2025 Yes
15A-2000 (e)(12) 2 2025‑93 H307 2(b) 2 12/01/2025 Yes
15A-2007 2025‑93 H307 6(c) 6 12/01/2025 Yes
15B-2 2026‑53 H206 5(a) 5 07/07/2026 No
15B-2 (1), (3) 2026‑48 S857 52 52 10/01/2026 No
15B-6 (b) 2026‑53 H206 5(b) 5 07/07/2026 No
15B-10 (a) 2026‑53 H206 5(c) 5 07/07/2026 No
15B-11 (a) 2025‑70 S429 7(a) 7 07/09/2025 Yes
15B-11 (a), (c1) 2026‑53 H206 5(d) 5 07/07/2026 No
15B-11 (g) 2026‑48 S857 53 53 10/01/2026 No
15B-15 2026‑53 H206 5(e) 5 07/07/2026 No
15B-26 (c) 2026‑53 H206 5(f) 5 07/07/2026 No
15C-12 2025‑25 H40 29(6) 29 06/26/2025 Yes
17C-6 (a)(13b) 2025‑47 S391 13(d) 13 10/01/2025 Yes
17C-10.1 (g) 2025‑20 H91 1.1 1.1 06/26/2025 Yes
17C-10.2 2025‑51 S710 6(a) 6 07/02/2025 Yes
17E-7.1 2025‑51 S710 6(b) 6 07/02/2025 Yes
18B-105 2025‑25 H40 29(6) 29 06/26/2025 Yes
18B-203 (a)(23) 2025‑51 S710 4(a) 4 10/01/2025 Yes
18B-500 (b) 2026‑41 S257 44.6(d7) 44.6K See Bill No
18B-500 (b)(2) 2026‑31 S595 9(d) 9 07/02/2026 No
18B-501 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
18B-502 (c) 2025‑51 S710 5 5 07/02/2025 Yes
18B-804 (b)(7) 2026‑31 S595 14(d) 14 07/02/2026 No
18B-804A 2026‑31 S595 14(b) 14 07/02/2026 No
18B-804A (b) 2026‑31 S595 14(c) 14 07/01/2027 No
18B-805 (a) 2026‑31 S595 14(e) 14 07/02/2026 No
18B-902 (b) 2026‑41 S257 20.2(a) 20.2 07/07/2026 No
18B-903 (c1) 2025‑65 S664 2(a) 2 07/07/2025 Yes
18B-907 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
18B-1001 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
18B-1001 (11) 2025‑94 H926 5 5 10/06/2025 Yes
18B-1001 (3), (5), (10) 2025‑65 S664 4(a) 4 10/01/2025 Yes
18B-1001.4 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
18B-1105 (a1) 2025‑65 S664 2(b) 2 07/07/2025 Yes
18C-111 2026‑41 S257 5.10(j) 5.91.97 07/07/2026 No
18C-113 (c) 2026‑40 S1041 4.7 4.7 10/01/2026 No
18C-120 (a), (b) 2026‑40 S1041 4.8 4.8 10/01/2026 No
18C-141 (a) 2026‑41 S257 22.5(u) 22.5R 07/01/2026 No
18C-151 (a)(4) 2026‑41 S257 22.5(v) 22.5S 07/01/2026 No
18C-901 (7) 2026‑31 S595 4.10 4.10 07/02/2026 No
18C-912 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
19A-27.5 2025‑ H96 3 3 * Vetoed No
20-4.01 1 2026‑41 S257 43.10(e) 43.9C 10/01/2026 No
20-4.01 (7a) 2 2026‑46 H1094 19(a) 19 12/01/2026 No
20-4.01 (28a) 3 2026‑46 H1094 20(a) 20 12/01/2026 No
20-4.03 2026‑46 H1094 11 11 07/07/2026 No
20-7 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-7 (f)(3a) 2026‑46 H1094 3(a) 3 10/01/2026 No
20-7 (f)(6) 1 2025‑91 S245 1 1 09/30/2025 Yes
20-7 (f)(6)a.4. 2 2025‑72 S118 5(a) 5 10/01/2025 Yes
20-7 (f)(6)a.4. 3 2025‑91 S245 3 3 09/30/2025 Yes
20-7.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
20-7.3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-9 (b1) 2026‑46 H1094 9(b) 9 10/01/2026 No
20-11 2026‑46 H1094 9(a) 9 10/01/2026 No
20-11 (f) 1 2025‑91 S245 2 2 09/30/2025 Yes
20-11 (n) 2 2025‑56 S125 2(a) 2 07/03/2025 Yes
20-13.2 (c1) 2025‑56 S125 2(b) 2 07/03/2025 Yes
20-13.2 (c1) 2026‑46 H1094 9(b) 9 10/01/2026 No
20-16 (a)(6a) 2025‑45 H737 8(a) 8 07/01/2026 Yes
20-16.5 (j) 2026‑41 S257 16.22(a) 16.999X 12/01/2026 No
20-17 (a)(4) 2025‑71 S311 7(a) 7 12/01/2025 Yes
20-26 (b1) 2026‑41 S257 43.10(f) 43.9D 10/01/2026 No
20-28.2 (a1) 2026‑41 S257 43.10(g) 43.9E 10/01/2026 No
20-37.7 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-37.17 2026‑46 H1094 10(a) 10 07/01/2026 No
20-37.19 2026‑46 H1094 10(b) 10 07/01/2026 No
20-37.20A 2026‑46 H1094 10(c) 10 07/01/2026 No
20-37.20B 2026‑46 H1094 10(d) 10 07/01/2026 No
20-37.22 2025‑25 H40 29(6) 29 06/26/2025 Yes
20-43.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
20-43.1 (e2) 2026‑46 H1094 4 4 07/07/2026 No
20-43.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-43.2 (c) 2025‑60 S600 2(d) 2 01/01/2027 Yes
20-45 2026‑41 S257 43.10(h) 43.9F 10/01/2026 No
20-48 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
20-49 2026‑41 S257 20.2(x) 20.3D 07/07/2026 No
20-49 2026‑41 S257 43.10(i) 43.9G 10/01/2026 No
20-52 2026‑41 S257 43.10(j) 43.9H 10/01/2026 No
20-53.1 2026‑41 S257 43.10(k) 43.9I 10/01/2026 No
20-53.4 (a) 2026‑41 S257 43.10(l) 43.9J 10/01/2026 No
20-54 (14) 2025‑47 S391 13(e) 13 10/01/2025 Yes
20-57 2026‑41 S257 43.10(c) 43.9A 10/01/2026 No
20-61 2026‑41 S257 43.10(m) 43.9K 10/01/2026 No
20-62.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
20-62.1 (a) 2025‑47 S391 19(a) 19 10/01/2025 Yes
20-63 2026‑46 H1094 7(d) 7 07/07/2026 No
20-63 2026‑41 S257 43.10(n) 43.9L 10/01/2026 No
20-63 (b1) 2026‑41 S257 43.13(a) 43.13 10/01/2026 No
20-63 (b1)(61) 2026‑43 H747 2(a) 2 10/01/2026 No
20-63.1 2026‑46 H1094 6.5 6.5 07/07/2026 No
20-66 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
20-66 2026‑41 S257 43.10(d) 43.9B 10/01/2026 No
20-67 2026‑41 S257 43.10(o) 43.9M 10/01/2026 No
20-68 (a) 2026‑41 S257 43.10(p) 43.9N 10/01/2026 No
20-70 2026‑41 S257 43.10(q) 43.9O 10/01/2026 No
20-71 (a) 2026‑41 S257 43.10(r) 43.9P 10/01/2026 No
20-71.3 2026‑41 S257 43.10(s) 43.9Q 10/01/2026 No
20-72 (a) 2026‑41 S257 43.10(t) 43.9R 10/01/2026 No
20-76 (a), (c) 2026‑41 S257 43.10(u) 43.9S 10/01/2026 No
20-77 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-77 (b) 2025‑54 H620 6(h) 6 12/01/2025 Yes
20-78 2026‑41 S257 43.10(v) 43.9T 10/01/2026 No
20-79 2026‑41 S257 43.10(w) 43.9U 10/01/2026 No
20-79 (c), (c1) 2025‑22 H421 2 2 10/01/2025 Yes
20-79 (c1) 2026‑46 H1094 6 6 07/07/2026 No
20-79.02 (b), (d) 2026‑41 S257 43.10(x) 43.9V 10/01/2026 No
20-79.4 (b) 2026‑43 H747 2(b) 2 10/01/2026 No
20-79.4 (b) 2026‑46 H1094 31(a) 31 07/07/2026 No
20-79.4 (b) 2026‑46 H1094 32(a) 32 07/07/2026 No
20-79.4 (b) 2026‑41 S257 43.13(b) 43.13A 10/01/2026 No
20-79.4 (b)(175) 2025‑97 S449 10.2 10.2 07/01/2025 Yes
20-79.4 (b)(52) 1 2026‑46 H1094 30(a) 30 07/07/2026 No
20-79.4 (b)(106) 2 2026‑46 H1094 8 8 07/07/2026 No
20-79.6 (b) 2025‑54 H620 19(b) 9 07/02/2025 Yes
20-79.7 2026‑46 H1094 32(b) 32 07/07/2026 No
20-79.7 (a1), (b) 2026‑43 H747 2(c) 2 10/01/2026 No
20-79.8 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-81.12 2026‑43 H747 2(d) 2 10/01/2026 No
20-81.12 2026‑46 H1094 32(c) 32 07/07/2026 No
20-81.12 (b30) 2026‑46 H1094 30(b) 30 07/07/2026 No
20-85 (a) 2026‑41 S257 43.10(y) 43.9W 10/01/2026 No
20-88 (c) 2026‑41 S257 43.10(z) 43.9X 10/01/2026 No
20-95 (a1) 2026‑41 S257 43.10(aa) 43.9Y 10/01/2026 No
20-110 (b) 2026‑41 S257 43.10(bb) 43.9z 10/01/2026 No
20-111 2026‑41 S257 43.10(cc) 43.90 10/01/2026 No
20-127 (f) 2025‑47 S391 21 21 07/01/2025 Yes
20-127 (g) 2025‑47 S391 22(d) 22 12/01/2025 Yes
20-137.3 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
20-137.3 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
20-137.4A 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
20-138.7 (a) 2025‑65 S664 4(b) 4 10/01/2025 Yes
20-138.7 (d) 2025‑27 H576 4.2(b) 4.2 06/27/2025 Yes
20-140 (g), (h) 2025‑71 S311 6(a) 6 12/01/2025 Yes
20-141 (b) 2026‑46 H1094 17(a) 17 12/01/2026 No
20-141 (e2) Local Modification 2026‑46 H1094 17.5(a) 17.5 07/07/2026 No
20-141.3 2025‑71 S311 7(b) 7 12/01/2025 Yes
20-146 (f) 2025‑47 S391 17(a) 17 12/01/2025 Yes
20-146 (f) 2026‑46 H1094 16(a) 16 12/01/2026 No
20-160.1 (a) 2025‑70 S429 12(a) 12 12/01/2025 Yes
20-166 2025‑71 S311 7(c) 7 12/01/2025 Yes
20-171.3 2026‑46 H1094 19(b) 19 12/01/2026 No
20-175.2 2025‑70 S429 13(a) 13 12/01/2025 Yes
20-175.16 2026‑46 H1094 20(b) 20 12/01/2026 No
20-176 (a1) 2026‑41 S257 43.10(dd) 43.91 10/01/2026 No
20-179 2025‑71 S311 11(a) 11 12/01/2025 Yes
20-179.3 (b)(2) 2025‑71 S311 7(d) 7 12/01/2025 Yes
20-179.5 2025‑71 S311 11(b) 11 12/01/2025 Yes
20-183.2 (c)(4) 2026‑41 S257 43.12(a) 43.12 07/01/2026 No
20-183.3 (a)(5) 2025‑47 S391 22(a) 22 12/01/2025 Yes
20-183.4C (a)(6) 2026‑41 S257 43.12(b) 43.12A 07/01/2026 No
20-183.4C (a)(7) 2026‑41 S257 43.10(ee) 43.92 10/01/2026 No
20-183.4D (e) 2026‑41 S257 43.10(ff) 43.93 10/01/2026 No
20-183.4D (e) 2026‑41 S257 43.12(c) 43.12B 07/01/2026 No
20-183.7 2026‑41 S257 43.12(d) 43.12C 07/01/2026 No
20-183.7 (a) 2025‑47 S391 22(b) 22 12/01/2025 Yes
20-183.7B (b)(9)o. 2025‑47 S391 22(c) 22 12/01/2025 Yes
20-183.7B (c)(7)o. 2025‑47 S391 22(c) 22 12/01/2025 Yes
20-183.34 2026‑41 S257 43.26(a) 43.26 07/07/2026 No
20-219.3A 2025‑71 S311 11.5(a) 11.5 12/01/2025 Yes
20-219.15 2025‑71 S311 11.5(b) 11.5 07/09/2025 Yes
20-279.21 2025‑4 H74 6.2 6,2 05/14/2025 Yes
20-280 2026‑46 H1094 23(a) 23 07/01/2027 No
20-280.15 2026‑31 S595 7.3 7.3 10/01/2026 No
20-286 (11)a.6., 7. 2025‑41 S295 4 4 07/01/2025 Yes
20-286 (15a), (15b) 2025‑41 S295 5 5 07/01/2025 Yes
20-288 (b2) 2025‑47 S391 2 2 07/01/2025 Yes
20-295 (b) 2025‑22 H421 1 1 10/01/2025 Yes
20-301.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
20-302 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-305 (4) 1 2025‑41 S295 1 1 07/01/2025 Yes
20-305 (4) 2 2025‑41 S295 3 3 07/01/2025 Yes
20-305 (6) 3 2025‑41 S295 1 1 07/01/2025 Yes
20-305 (7) 4 2025‑41 S295 6 6 07/01/2025 Yes
20-305 (33) 5 2025‑41 S295 9 9 07/01/2025 Yes
20-305 (57) 6 2025‑41 S295 2 2 07/01/2025 Yes
20-305 (58), (59) 7 2025‑41 S295 7 7 07/01/2025 Yes
20-305.1 2025‑41 S295 8 8 07/01/2025 Yes
20-305.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-309 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
20-309 (a3) 2025‑45 H737 8(b) 8 07/01/2026 Yes
20-309.2 (a)(4), (a1) 2025‑45 H737 8(c) 8 07/01/2026 Yes
20-311 2026‑41 S257 43.10(gg) 43.94 10/01/2026 No
20-311 (a) 2026‑46 H1094 5(a) 5 10/01/2026 No
20-322 2025‑47 S391 1 1 07/01/2025 Yes
20-329 (c) 2025‑47 S391 24 24 07/01/2025 Yes
20-401 2026‑41 S257 43.10(hh) 43.95 10/01/2026 No
24-10 (g) 2025‑43 H762 2 2 07/01/2025 Yes
25-1-201 2025‑25 H40 108 108 10/01/2025 Yes
25-1-204 2025‑25 H40 109 109 10/01/2025 Yes
25-1-301 2025‑25 H40 110 110 10/01/2025 Yes
25-1-306 2025‑25 H40 111 111 10/01/2025 Yes
25-2-102 2025‑25 H40 113 113 10/01/2025 Yes
25-2-103 2025‑25 H40 114 114 10/01/2025 Yes
25-2-104 2025‑25 H40 112 112 10/01/2025 Yes
25-2-105 2025‑25 H40 112 112 10/01/2025 Yes
25-2-106 2025‑25 H40 115 115 10/01/2025 Yes
25-2-107 2025‑25 H40 112 112 10/01/2025 Yes
25-2-201 2025‑25 H40 116 116 10/01/2025 Yes
25-2-202 2025‑25 H40 117 117 10/01/2025 Yes
25-2-203 2025‑25 H40 118 118 10/01/2025 Yes
25-2-204 2025‑25 H40 112 112 10/01/2025 Yes
25-2-205 2025‑25 H40 119 119 10/01/2025 Yes
25-2-206 2025‑25 H40 112 112 10/01/2025 Yes
25-2-207 2025‑25 H40 112 112 10/01/2025 Yes
25-2-209 2025‑25 H40 120 120 10/01/2025 Yes
25-2-210 2025‑25 H40 112 112 10/01/2025 Yes
25-2-302 2025‑25 H40 112 112 10/01/2025 Yes
25-2-304 2025‑25 H40 112 112 10/01/2025 Yes
25-2-305 2025‑25 H40 112 112 10/01/2025 Yes
25-2-306 2025‑25 H40 112 112 10/01/2025 Yes
25-2-308 2025‑25 H40 112 112 10/01/2025 Yes
25-2-309 2025‑25 H40 112 112 10/01/2025 Yes
25-2-310 2025‑25 H40 112 112 10/01/2025 Yes
25-2-311 2025‑25 H40 112 112 10/01/2025 Yes
25-2-312 2025‑25 H40 112 112 10/01/2025 Yes
25-2-313 2025‑25 H40 112 112 10/01/2025 Yes
25-2-314 2025‑25 H40 112 112 10/01/2025 Yes
25-2-316 2025‑25 H40 112 112 10/01/2025 Yes
25-2-317 2025‑25 H40 112 112 10/01/2025 Yes
25-2-319 2025‑25 H40 112 112 10/01/2025 Yes
25-2-320 2025‑25 H40 112 112 10/01/2025 Yes
25-2-321 2025‑25 H40 112 112 10/01/2025 Yes
25-2-322 2025‑25 H40 112 112 10/01/2025 Yes
25-2-323 2025‑25 H40 112 112 10/01/2025 Yes
25-2-324 2025‑25 H40 112 112 10/01/2025 Yes
25-2-325 2025‑25 H40 112 112 10/01/2025 Yes
25-2-325 2025‑25 H40 112 112 10/01/2025 Yes
25-2-326 2025‑25 H40 112 112 10/01/2025 Yes
25-2-327 2025‑25 H40 112 112 10/01/2025 Yes
25-2-328 2025‑25 H40 112 112 10/01/2025 Yes
25-2-401 2025‑25 H40 112 112 10/01/2025 Yes
25-2-402 2025‑25 H40 112 112 10/01/2025 Yes
25-2-403 2025‑25 H40 112 112 10/01/2025 Yes
25-2-501 2025‑25 H40 112 112 10/01/2025 Yes
25-2-502 2025‑25 H40 112 112 10/01/2025 Yes
25-2-503 2025‑25 H40 112 112 10/01/2025 Yes
25-2-504 2025‑25 H40 112 112 10/01/2025 Yes
25-2-505 2025‑25 H40 112 112 10/01/2025 Yes
25-2-506 2025‑25 H40 112 112 10/01/2025 Yes
25-2-507 2025‑25 H40 112 112 10/01/2025 Yes
25-2-508 2025‑25 H40 112 112 10/01/2025 Yes
25-2-509 2025‑25 H40 112 112 10/01/2025 Yes
25-2-510 2025‑25 H40 112 112 10/01/2025 Yes
25-2-511 2025‑25 H40 112 112 10/01/2025 Yes
25-2-512 2025‑25 H40 112 112 10/01/2025 Yes
25-2-513 2025‑25 H40 112 112 10/01/2025 Yes
25-2-515 2025‑25 H40 112 112 10/01/2025 Yes
25-2-601 2025‑25 H40 112 112 10/01/2025 Yes
25-2-602 2025‑25 H40 112 112 10/01/2025 Yes
25-2-603 2025‑25 H40 112 112 10/01/2025 Yes
25-2-605 2025‑25 H40 112 112 10/01/2025 Yes
25-2-606 2025‑25 H40 112 112 10/01/2025 Yes
25-2-607 2025‑25 H40 112 112 10/01/2025 Yes
25-2-608 2025‑25 H40 112 112 10/01/2025 Yes
25-2-608 2025‑25 H40 112 112 10/01/2025 Yes
25-2-609 2025‑25 H40 112 112 10/01/2025 Yes
25-2-610 2025‑25 H40 112 112 10/01/2025 Yes
25-2-611 2025‑25 H40 112 112 10/01/2025 Yes
25-2-612 2025‑25 H40 112 112 10/01/2025 Yes
25-2-613 2025‑25 H40 112 112 10/01/2025 Yes
25-2-614 2025‑25 H40 112 112 10/01/2025 Yes
25-2-615 2025‑25 H40 112 112 10/01/2025 Yes
25-2-616 2025‑25 H40 112 112 10/01/2025 Yes
25-2-702 2025‑25 H40 112 112 10/01/2025 Yes
25-2-703 2025‑25 H40 112 112 10/01/2025 Yes
25-2-704 2025‑25 H40 112 112 10/01/2025 Yes
25-2-705 2025‑25 H40 112 112 10/01/2025 Yes
25-2-706 2025‑25 H40 112 112 10/01/2025 Yes
25-2-707 2025‑25 H40 112 112 10/01/2025 Yes
25-2-708 2025‑25 H40 112 112 10/01/2025 Yes
25-2-709 2025‑25 H40 112 112 10/01/2025 Yes
25-2-711 2025‑25 H40 112 112 10/01/2025 Yes
25-2-712 2025‑25 H40 112 112 10/01/2025 Yes
25-2-713 2025‑25 H40 112 112 10/01/2025 Yes
25-2-714 2025‑25 H40 112 112 10/01/2025 Yes
25-2-715 2025‑25 H40 112 112 10/01/2025 Yes
25-2-716 2025‑25 H40 112 112 10/01/2025 Yes
25-2-718 2025‑25 H40 112 112 10/01/2025 Yes
25-2-719 2025‑25 H40 112 112 10/01/2025 Yes
25-2-722 2025‑25 H40 112 112 10/01/2025 Yes
25-2-723 2025‑25 H40 112 112 10/01/2025 Yes
25-2-725 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-102 2025‑25 H40 121 121 10/01/2025 Yes
25-2A-103 2025‑25 H40 122 122 10/01/2025 Yes
25-2A-104 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-105 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-106 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-107 2025‑25 H40 123 123 10/01/2025 Yes
25-2A-108 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-109 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-201 2025‑25 H40 124 124 10/01/2025 Yes
25-2A-202 2025‑25 H40 125 125 10/01/2025 Yes
25-2A-203 2025‑25 H40 126 126 10/01/2025 Yes
25-2A-204 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-205 2025‑25 H40 127 127 10/01/2025 Yes
25-2A-206 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-208 2025‑25 H40 128 128 10/01/2025 Yes
25-2A-209 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-210 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-211 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-212 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-214 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-215 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-217 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-218 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-219 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-220 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-221 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-303 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-304 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-305 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-307 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-308 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-309 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-310 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-401 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-402 2025‑25 H25 112 112 10/01/2025 Yes
25-2A-403 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-404 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-405 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-406 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-407 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-501 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-503 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-504 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-505 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-506 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-507 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-508 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-509 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-510 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-511 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-512 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-513 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-514 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-515 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-516 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-517 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-517 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-518 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-519 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-520 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-521 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-522 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-523 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-524 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-525 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-526 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-527 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-528 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-529 2025‑25 H40 112 112 10/01/2025 Yes
25-2A-531 2025‑25 H40 112 112 10/01/2025 Yes
25-3-104 2025‑25 H40 129 129 10/01/2025 Yes
25-3-105 2025‑25 H40 130 130 10/01/2025 Yes
25-3-401 2025‑25 H40 131 131 10/01/2025 Yes
25-3-604 2025‑25 H40 132 132 10/01/2025 Yes
25-4A-103 2025‑25 H40 133(b) 133 10/01/2025 Yes
25-4A-103 (a)(1), (a)(3a) 2025‑25 H40 133(a) 133 10/01/2025 Yes
25-4A-201 2025‑25 H40 134 134 10/01/2025 Yes
25-4A-202 2025‑25 H40 135 135 10/01/2025 Yes
25-4A-203 2025‑25 H40 136 136 10/01/2025 Yes
25-4A-207 2025‑25 H40 137 137 10/01/2025 Yes
25-4A-208 2025‑25 H40 138 138 10/01/2025 Yes
25-4A-210 (a) 2025‑25 H40 139 139 10/01/2025 Yes
25-4A-211 2025‑25 H40 140 140 10/01/2025 Yes
25-4A-305 2025‑25 H40 141 141 10/01/2025 Yes
25-5-104 2025‑25 H40 142 142 10/01/2025 Yes
25-5-116 2025‑25 H40 143 143 10/01/2025 Yes
25-7-102 2025‑25 H40 144 144 10/01/2025 Yes
25-7-106 2025‑25 H40 145 145 10/01/2025 Yes
25-8-102 2025‑25 H40 146 146 10/01/2025 Yes
25-8-103 2025‑25 H40 147 147 10/01/2025 Yes
25-8-106 2025‑25 H40 148 148 10/01/2025 Yes
25-8-110 2025‑25 H40 149 149 10/01/2025 Yes
25-8-303 2025‑25 H40 150 150 10/01/2025 Yes
25-9-102 2025‑25 H40 58 58 10/01/2025 Yes
25-9-104 2025‑25 H40 59 59 10/01/2025 Yes
25-9-105 2025‑25 H40 60 60 10/01/2025 Yes
25-9-105.1 2025‑25 H40 61 61 10/01/2025 Yes
25-9-107.1 2025‑25 H40 62 62 10/01/2025 Yes
25-9-107.2 2025‑25 H40 63 63 10/01/2025 Yes
25-9-109 2025‑25 H40 112 112 10/01/2025 Yes
25-9-110 2025‑25 H40 149 149 10/01/2025 Yes
25-9-201 2025‑25 H40 34(b) 34 10/01/2025 Yes
25-9-203 2025‑25 H40 64 64 10/01/2025 Yes
25-9-204 2025‑25 H40 65 64 10/01/2025 Yes
25-9-207 2025‑25 H40 66 66 10/01/2025 Yes
25-9-208 2025‑25 H40 67 67 10/01/2025 Yes
25-9-209 2025‑25 H40 68 68 10/01/2025 Yes
25-9-210 2025‑25 H40 69 69 10/01/2025 Yes
25-9-301 2025‑25 H40 70 70 10/01/2025 Yes
25-9-304 (a), (b) 2025‑25 H40 71 71 10/01/2025 Yes
25-9-305 2025‑25 H40 72 72 10/01/2025 Yes
25-9-306.1 2025‑25 H40 73 73 10/01/2025 Yes
25-9-306.2 2025‑25 H40 74 74 10/01/2025 Yes
25-9-309 2025‑25 H40 112 112 10/01/2025 Yes
25-9-310 2025‑25 H40 75 75 10/01/2025 Yes
25-9-312 2025‑25 H40 76 76 10/01/2025 Yes
25-9-313 2025‑25 H40 77 77 10/01/2025 Yes
25-9-314 2025‑25 H40 78 78 10/01/2025 Yes
25-9-314.1 2025‑25 H40 79 79 10/01/2025 Yes
25-9-315 2025‑25 H40 112 112 10/01/2025 Yes
25-9-316 2025‑25 H40 80 80 10/01/2025 Yes
25-9-317 2025‑25 H40 81 81 10/01/2025 Yes
25-9-323 2025‑25 H40 82 82 10/01/2025 Yes
25-9-324 2025‑25 H40 83 83 10/01/2025 Yes
25-9-325 2025‑25 H40 112 112 10/01/2025 Yes
25-9-326.1 2025‑25 H40 84 84 10/01/2025 Yes
25-9-330 2025‑25 H40 85 85 10/01/2025 Yes
25-9-331 2025‑25 H40 86 86 10/01/2025 Yes
25-9-332 2025‑25 H40 87 87 10/01/2025 Yes
25-9-334 2025‑25 H40 88 88 10/01/2025 Yes
25-9-341 2025‑25 H40 89 89 10/01/2025 Yes
25-9-404 2025‑25 H40 90 90 10/01/2025 Yes
25-9-406 2025‑25 H40 91 91 10/01/2025 Yes
25-9-407 2025‑25 H40 112 112 10/01/2025 Yes
25-9-408 2025‑25 H40 92 92 10/01/2025 Yes
25-9-509 2025‑25 H40 93 93 10/01/2025 Yes
25-9-513 2025‑25 H40 94 94 10/01/2025 Yes
25-9-601 2025‑25 H40 95 95 10/01/2025 Yes
25-9-605 2025‑25 H40 96 96 10/01/2025 Yes
25-9-608 2025‑25 H40 97 97 10/01/2025 Yes
25-9-611 2025‑25 H40 98 98 10/01/2025 Yes
25-9-613 2025‑25 H40 99 99 10/01/2025 Yes
25-9-614 2025‑25 H40 100 100 10/01/2025 Yes
25-9-615 2025‑25 H40 101 101 10/01/2025 Yes
25-9-616 2025‑25 H40 102 102 10/01/2025 Yes
25-9-619 2025‑25 H40 103 103 10/01/2025 Yes
25-9-620 2025‑25 H40 104 104 10/01/2025 Yes
25-9-620 2025‑25 H40 154 154 10/01/2025 Yes
25-9-621 2025‑25 H40 105 105 10/01/2025 Yes
25-9-624 2025‑25 H40 106 106 10/01/2025 Yes
25-9-628 2025‑25 H40 107 107 10/01/2025 Yes
25-12-101 Art. 12 2025‑25 H40 57 57 10/01/2025 Yes
25-12-102 2025‑25 H40 57 57 10/01/2025 Yes
25-12-103 2025‑25 H40 57 57 10/01/2025 Yes
25-12-104 2025‑25 H40 57 57 10/01/2025 Yes
25-12-105 2025‑25 H40 57 57 10/01/2025 Yes
25-12-106 2025‑25 H40 57 57 10/01/2025 Yes
25-12-107 2025‑25 H40 57 57 10/01/2025 Yes
28A-2-4 2025‑25 H40 52 52 01/01/2026 Yes
28A-2A-8 2025‑33 H388 8.2 8.2 01/01/2026 Yes
28A-2A-15 2025‑54 H620 6(b) 6 12/01/2025 Yes
28A-2A-17 (a) 2025‑54 H620 6(c) 6 12/01/2025 Yes
28A-2B-1 2025‑33 H388 8.3 8.3 01/01/2026 Yes
28A-2B-3 2025‑33 H388 8.4 8 01/01/2026 Yes
28A-5-1 (b) 2025‑54 H620 6(d) 6 12/01/2025 Yes
28A-5-2 (b)(1) 2025‑54 H620 6(e) 6 12/01/2025 Yes
28A-21-3 2025‑54 H620 6(f) 6 12/01/2025 Yes
28A-25-6 2025‑33 H388 12.5 12 06/30/2025 Yes
28A-28-2 (a) 2025‑54 H620 6(g) 6 12/01/2025 Yes
28C-1 2025‑44 H537 1 1 07/01/2025 Yes
28C-2 2025‑44 H537 2 2 07/01/2025 Yes
28C-10 2025‑54 H620 8 8 07/02/2025 Yes
29-19 (b)(1), (2) 2025‑75 H992 3 3 12/01/2025 Yes
29-30 2025‑25 H40 1(b) 1 06/26/2025 Yes
29-30 (a), (d), (e) 2025‑54 H620 6(a) 6 12/01/2025 Yes
29-30 (a)(2a) 2025‑25 H40 47(a) 47 06/26/2025 Yes
30-3.3A (e) 2025‑33 H388 10.1 10 01/01/2026 Yes
30-3.4 2025‑33 H388 10.2 10 01/01/2026 Yes
30-15 2025‑33 H388 12.1 12 01/01/2026 Yes
30-17 2025‑33 H388 12.2 12 01/01/2026 Yes
30-20 2025‑33 H388 12.3 12 01/01/2026 Yes
30-23.1 2025‑33 H388 12.4 12 01/01/2026 Yes
30-41 Art. 5 2025‑25 H40 51 51 01/01/2026 Yes
30-42 2025‑25 H40 51 51 01/01/2026 Yes
30-43 2025‑25 H40 51 51 01/01/2026 Yes
30-44 2025‑25 H40 51 51 01/01/2026 Yes
30-45 2025‑25 H40 51 51 01/01/2026 Yes
30-46 2025‑25 H40 51 51 01/01/2026 Yes
30-47 2025‑25 H40 51 51 01/01/2026 Yes
30-48 2025‑25 H40 51 51 01/01/2026 Yes
30-49 2025‑25 H40 51 51 01/01/2026 Yes
30-50 2025‑25 H40 51 51 01/01/2026 Yes
30-51 2025‑25 H40 51 51 01/01/2026 Yes
30-52 2025‑25 H40 51 51 01/01/2026 Yes
31-3.1 2025‑33 H388 8.5 8 01/01/2026 Yes
31-3.2 2025‑33 H388 8.6 8 01/01/2026 Yes
31-5.1 2025‑33 H388 8.7 8 01/01/2026 Yes
31-11 2025‑54 H620 6(i) 6 12/01/2025 Yes
31-71 Art. 11 2025‑33 H388 8.1 8.1 01/01/2026 Yes
31-72 2025‑33 H388 8.1 8.1 01/01/2026 Yes
31-73 2025‑33 H388 8.1 81 01/01/2026 Yes
31B-2.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
31C-1 Chapter 2025‑25 H40 50 50 01/01/2026 Yes
31C-2 2025‑25 H40 50 50 01/01/2026 Yes
31C-3 2025‑25 H40 50 50 01/01/2026 Yes
31C-4 2025‑25 H40 50 50 01/01/2026 Yes
31C-5 2025‑25 H40 50 50 01/01/2026 Yes
31C-6 2025‑25 H40 50 50 01/01/2026 Yes
31C-7 2025‑25 H40 50 50 01/01/2026 Yes
31C-8 2025‑25 H40 50 50 01/01/2026 Yes
31C-9 2025‑25 H40 50 50 01/01/2026 Yes
31C-10 2025‑25 H40 50 50 01/01/2026 Yes
31C-11 2025‑25 H40 50 50 01/01/2026 Yes
31C-12 2025‑25 H40 50 50 01/01/2026 Yes
32A-16 (1) 2026‑48 S857 54 54 10/01/2026 No
32A-25.1 (a) 2026‑48 S857 55 55 10/01/2026 No
35A-1216 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
35A-1230 2025‑54 H620 5(a) 5 12/01/2025 Yes
35A-1231 (a) 2025‑54 H620 5(b) 5 12/01/2025 Yes
35A-1261 2025‑54 H620 5(c) 5 12/01/2025 Yes
35A-1295 (a) 2025‑54 H620 5(d) 5 12/01/2025 Yes
36C-6-604 2025‑33 H388 11.1 11 01/01/2026 Yes
39-13.3 2025‑25 H40 48(a) 48 10/01/2025 Yes
40A-3 (c)(14) 2025‑39 H948 8.1 8.1 07/01/2025 Yes
41-63 2025‑25 H40 48(b) 48 10/01/2025 Yes
41-71 2025‑25 H40 31.1(a) 31.1 06/30/2020 Yes
42-46 (i) 2025‑54 H620 12.4 12.4 09/09/2024 Yes
42-46 (i)(3), (4) 2025‑52 S690 3(a) 3 09/09/2024 Yes
42-46 (l) 2025‑45 H737 10 10 07/01/2025 Yes
42A-39 (c1) 2026‑34 H83 3(b) 3 07/02/2026 No
44A-11.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
44A-11.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
44A-40 2025‑25 H40 151 151 06/26/2025 Yes
44A-40 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
44A-43 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
44A-43 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
45-21.12A (d)(1)a. 2025‑20 H91 2.3 2.3 06/26/2025 Yes
45-36.5 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
47-36.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
47-81.2 2025‑20 H91 2.4 2.4 06/26/2025 Yes
47C-3-108 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
47C-3-108 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
47E-4 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
47F-3-108 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
47F-3-108 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
48-1-101 (13a) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-1-106 (c) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-2-100 (a1) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-2-305 (2) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-3-203 (a1)(1), (2) 2025‑59 S442 1(c) 1 07/03/2025 Yes
48-3-205 2025‑25 H40 46(b) 46 06/26/2025 Yes
48-3-230 Art. 3, Part 2A 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-231 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-232 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-233 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-234 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-235 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-236 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-237 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-238 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-239 2025‑25 H40 46(a) 46 06/26/2025 Yes
48-3-309 2025‑25 H40 32 32 06/26/2025 Yes
48-3-309 (e) 2025‑27 H576 5.3(a) 5.3 06/27/2025 Yes
48-3-610 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-3-702 (b1)(3) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-3-703 (a)(8) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-3-705 (c)(1) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-3-706 (c1) 2025‑16 H612 1.18(d) 1.18 10/01/2025 Yes
48-9-107 2025‑9 S248 1 1 01/01/2026 Yes
48-10-101 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
48-10-101 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
48-10-101 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
50-11 2025‑25 H40 1(c) 1 06/26/2025 Yes
50-13.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
50-13.2 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
50-13.2B 2025‑16 H612 1.18(c) 1.18 10/01/2025 Yes
50-13.10 (d) 2025‑16 H612 1.21(a) 1.21 10/01/2025 Yes
50-18 2025‑20 H91 2.5 2.5 06/26/2025 Yes
50-20 2025‑25 H40 48(d) 48 10/01/2025 Yes
50-20 2025‑25 H40 48(c) 48 10/01/2025 Yes
50-110 Art. 6 2026‑41 S257 16.19(a) 16.996 07/01/2026 No
50-111 2026‑41 S257 16.19(a) 16.996 07/01/2026 No
50-112 2026‑41 S257 16.19(a) 16.996 07/01/2026 No
50-113 2026‑41 S257 16.19(a) 16.996 07/01/2026 No
50-114 2026‑41 S257 16.19(a) 16.996 07/01/2026 No
50-115 2026‑41 S257 16.19(a) 16.996 07/01/2026 No
50-116 2026‑41 S257 16.19(a) 16.996 07/01/2026 No
50A-1 Chapter title 2025‑25 H40 45(a) 45 10/01/2025 Yes
50A-351 (18) 2025‑20 H91 2.6 2.6 06/26/2025 Yes
50A-411 Art. 4 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-412 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-413 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-414 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-415 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-416 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-417 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-418 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-419 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-420 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-421 2025‑25 H40 45(b) 45 10/01/2025 Yes
50A-422 2025‑25 H40 45(b) 45 10/01/2025 Yes
50B-2 2025‑54 H620 9(a) 9 07/02/2025 Yes
50B-2 (a) 2025‑70 S429 6(a) 6 12/01/2025 Yes
50B-3.1 2025‑70 S429 20(a) 20 12/01/2025 Yes
50B-4 (a) 2025‑54 H620 9(b) 9 07/02/2025 Yes
52-10 2025‑25 H40 1(d) 1 06/26/2025 Yes
52C-3-305 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
52C-3-316 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
53-180.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
53-208.43 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
53-244.010 Art. 19B, Part 1 2025‑43 H762 1 1 10/01/2025 Yes
53-244.020 2025‑43 H762 1 1 10/01/2025 Yes
53-244.030 2025‑43 H762 1 1 10/01/2025 Yes
53-244.040 2025‑43 H762 1 1 10/01/2025 Yes
53-244.050 2025‑43 H762 1 1 10/01/2025 Yes
53-244.060 2025‑43 H762 1 1 10/01/2025 Yes
53-244.070 2025‑43 H762 1 1 10/01/2025 Yes
53-244.080 2025‑43 H762 1 1 10/01/2025 Yes
53-244.090 2025‑43 H762 1 1 10/01/2025 Yes
53-244.100 2025‑43 H762 1 1 10/01/2025 Yes
53-244.100A 2025‑43 H762 1 1 10/01/2025 Yes
53-244.101 2025‑43 H762 1 1 10/01/2025 Yes
53-244.102 2025‑43 H762 1 1 10/01/2025 Yes
53-244.103 2025‑43 H762 1 1 10/01/2025 Yes
53-244.104 2025‑43 H762 1 1 10/01/2025 Yes
53-244.105 2025‑43 H762 1 1 10/01/2025 Yes
53-244.106 2025‑43 H762 1 1 10/01/2025 Yes
53-244.107 2025‑43 H762 1 1 10/01/2025 Yes
53-244.107 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
53-244.108 2025‑43 H762 1 1 10/01/2025 Yes
53-244.109 2025‑43 H762 1 1 10/01/2025 Yes
53-244.110 2025‑43 H762 1 1 10/01/2025 Yes
53-244.111 2025‑43 H762 1 1 10/01/2025 Yes
53-244.112 2025‑43 H762 1 1 10/01/2025 Yes
53-244.113 2025‑43 H762 1 1 10/01/2025 Yes
53-244.114 2025‑43 H762 1 1 10/01/2025 Yes
53-244.115 2025‑43 H762 1 1 10/01/2025 Yes
53-244.116 2025‑43 H762 1 1 10/01/2025 Yes
53-244.118 2025‑43 H762 1 1 10/01/2025 Yes
53-244.119 2025‑43 H762 1 1 10/01/2025 Yes
53-244.120 2025‑43 H762 1 1 10/01/2025 Yes
53-244.121 2025‑43 H762 1 1 10/01/2025 Yes
53-244.122 2025‑43 H762 1 1 10/01/2025 Yes
53-244.141 Art. 19B, Part 2 2025‑43 H762 1 1 10/01/2025 Yes
53-244.142 2025‑43 H762 1 1 10/01/2025 Yes
53-244.143 2025‑43 H762 1 1 10/01/2025 Yes
53-244.144 2025‑43 H762 1 1 10/01/2025 Yes
53-420 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
53-442 2026‑45 H920 1 1 01/01/2027 No
53-443 2026‑45 H920 1 1 01/01/2027 No
53-444 2026‑45 H920 1 1 01/01/2027 No
53-445 2026‑45 H920 1 1 01/01/2027 No
53-446 2026‑45 H920 1 1 01/01/2027 No
53-447 2026‑45 H920 1 1 01/01/2027 No
53-448 2026‑45 H920 1 1 01/01/2027 No
53-449 2026‑45 H920 1 1 01/01/2027 No
53-450 2026‑45 H920 1 1 01/01/2027 No
53-451 2026‑45 H920 1 1 01/01/2027 No
53-452 2026‑45 H920 1 1 01/01/2027 No
53-453 2026‑45 H920 1 1 01/01/2027 No
53-454 2026‑45 H920 1 1 01/01/2027 No
53-455 2026‑45 H920 1 1 01/01/2027 No
53-456 2026‑45 H920 1 1 01/01/2027 No
53-457 2026‑45 H920 1 1 01/01/2027 No
53-458 2026‑45 H920 1 1 01/01/2027 No
53-459 2026‑45 H920 1 1 01/01/2027 No
53-460 2026‑45 H920 1 1 01/01/2027 No
53-461 2026‑45 H920 1 1 01/01/2027 No
53-462 2026‑45 H920 1 1 01/01/2027 No
53C-1-3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
53C-1-4 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
53C-2-1 2026‑41 S257 5.10(i) 5.91.96 See Bill No
53C-2-3 (c), (d) 2026‑40 S1041 4.9 4.9 10/01/2026 No
53C-2-5 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
53C-6-12 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
54-109.1 2026‑31 S595 11(a) 11 07/01/2026 No
54-109.2 (a) 2026‑31 S595 11(g) 11 07/01/2026 No
54-109.11 2026‑31 S595 11(h) 11 07/01/2026 No
54-109.14 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.15 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.16 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.17 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.18 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.18A 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.19 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.20 2026‑31 S595 11(b) 11 07/01/2026 No
54-109.21 2026‑31 S595 11(c) 11 07/01/2026 No
54-109.28 2026‑31 S595 11(d) 11 07/01/2026 No
54-109.60A 2026‑31 S595 11(i) 11 07/01/2026 No
54-109.82 2026‑31 S595 11(e) 11 07/01/2026 No
54-109.92 (k) 2026‑31 S595 11(f) 11 07/01/2026 No
54B-155 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
54C-4 (b) 2026‑31 S595 13.2(a) 13.2 07/02/2026 No
54C-23 2026‑31 S595 13.2(b) 13.2 07/02/2026 No
54C-24 2026‑31 S595 13.2(c) 13.2 07/02/2026 No
54C-60 2026‑31 S595 13.2(d) 13.2 07/02/2026 No
54C-101 2026‑31 S595 13.2(e) 13.2 07/02/2026 No
54C-102 2026‑31 S595 13.2(f) 13.2 07/02/2026 No
54D-1 Chapter 2025‑25 H40 158 158 10/01/2025 Yes
54D-2 2025‑25 H40 158 158 10/01/2025 Yes
54D-3 2025‑25 H40 158 158 10/01/2025 Yes
54D-4 2025‑25 H40 158 158 10/01/2025 Yes
54D-5 2025‑25 H40 158 158 10/01/2025 Yes
54D-6 2025‑25 H40 158 158 10/01/2025 Yes
54D-7 2025‑25 H40 158 158 10/01/2025 Yes
54D-8 2025‑25 H40 158 158 10/01/2025 Yes
54D-9 2025‑25 H40 158 158 10/01/2025 Yes
54D-10 2025‑25 H40 158 158 10/01/2025 Yes
54D-11 2025‑25 H40 158 158 10/01/2025 Yes
54D-12 2025‑25 H40 158 158 10/01/2025 Yes
54D-13 2025‑25 H40 158 158 10/01/2025 Yes
54D-14 2025‑25 H40 158 158 10/01/2025 Yes
54D-15 2025‑25 H40 158 158 10/01/2025 Yes
55-1-64 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
55-2-02 (b)(3), (e) 2025‑33 H388 1 1 10/01/2025 Yes
55-2-07 (a) 2025‑33 H388 2(a) 2 10/01/2025 Yes
55-2-08 2025‑33 H388 3(a) 3 10/01/2025 Yes
55-3-03 2025‑33 H388 2(b) 2 10/01/2025 Yes
55-6-04 2025‑33 H388 4(a) 4 10/01/2025 Yes
55-6-25 2025‑33 H388 4(b) 4 10/01/2025 Yes
55-7-40.1 2025‑33 H388 5(a) 5 10/01/2025 Yes
55-7-42 2025‑33 H388 5(b) 5 10/01/2025 Yes
55-7-44 2025‑33 H388 5(c) 5 10/01/2025 Yes
55-7-46 2025‑33 H388 5(d) 5 10/01/2025 Yes
55-7-50 2025‑33 H388 3(b) 3 10/01/2025 Yes
55-8-25 (e)(2), (4) 2025‑33 H388 6 6 07/01/2025 Yes
55-11-04 (f) 2025‑33 H388 7(a) 7 10/01/2025 Yes
55-11-12 2025‑33 H388 7(b) 7 10/01/2025 Yes
55A-1-22 (a) 2026‑52 H517 3.2(a) 3.2 10/01/2026 No
55A-1-22 (a)(29), (a)(29a) 2026‑52 H517 2(b) 2 01/01/2027 No
55A-1-50 2026‑52 H517 4(a) 4 10/01/2026 No
55A-1-60 (a), (d) 2026‑52 H517 3.2(b) 3.2 10/01/2026 No
55A-8-03 2026‑52 H517 4(b) 4 10/01/2026 No
55A-8-11 2026‑52 H517 4(c) 4 10/01/2026 No
55A-8-25 2026‑52 H517 5(a) 5 10/01/2026 No
55A-8-25 (d), (e) 2026‑52 H517 3.2(c) 3.2 10/01/2026 No
55A-11-02 (a) 2026‑52 H517 1(a) 1 10/01/2026 No
55A-11-09 2026‑52 H517 1(b) 1 10/01/2026 No
55A-11A-01 Art. 11A, Part 1 2026‑52 H517 6(a) 6 10/01/2026 No
55A-11A-02 2026‑52 H517 6(a) 6 10/01/2026 No
55A-11A-03 2026‑52 H517 6(a) 6 10/01/2026 No
55A-11A-04 2026‑52 H517 6(a) 6 10/01/2026 No
55A-11A-10 Part, title 2026‑52 H517 6(b) 6 10/01/2026 No
55A-11B-01 Art. 11B 2026‑52 H517 3.1 3.1 10/01/2026 No
55A-11B-02 2026‑52 H517 3.1 3.1 10/01/2026 No
55A-11B-04 2026‑52 H517 3.1 3.1 10/01/2026 No
55A-11B-05 2026‑52 H517 3.1 3.1 10/01/2026 No
55A-11B-06 2026‑52 H517 3.1 3.1 10/01/2026 No
55A-11B-07 2026‑52 H517 3.1 3.1 10/01/2026 No
55A-12-02 2026‑52 H517 1(c) 1 10/01/2026 No
55A-14-20 2026‑52 H517 2(c) 2 01/01/2027 No
55A-14-22 2026‑52 H517 2(d) 2 01/01/2027 No
55A-16-22.1 2026‑52 H517 2(a) 2 01/01/2027 No
55A-16-24 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
55A-18-01 Art. 18 2025‑79 S416 1 1 12/01/2025 Yes
55A-18-02 2025‑79 S416 1 1 12/01/2025 Yes
55A-18-03 2025‑79 S416 1 1 12/01/2025 Yes
55A-18-04 2025‑79 S416 1 1 12/01/2025 Yes
55A-18-05 2025‑79 S416 1 1 12/01/2025 Yes
55A-18-06 2025‑79 S416 1 1 12/01/2025 Yes
55A-18-07 2025‑79 S416 1 1 12/01/2025 Yes
55B-11B-03 2026‑52 H517 3.1 3.1 10/01/2026 No
55D-5 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
57D-1-03 2025‑55 S307 1 1 10/01/2025 Yes
57D-3-02 2025‑55 S307 2 2 10/01/2025 Yes
58-2-69 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-2-240 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-2-255 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-3-169 2025‑37 H67 6.1(h) 6.1 See Bill Yes
58-3-180 (b) 2026‑41 S257 32.3(a) 32.3 10/01/2026 No
58-3-182 2025‑69 S479 7.1 7.1 01/01/2027 Yes
58-3-221 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-3-230 (d) 2025‑37 H67 5.2(b) 5.2 10/01/2025 Yes
58-3-241 2025‑37 H67 5.2(a) 5.2 10/01/2025 Yes
58-3-241 2025‑37 H67 7.2(b) 7.2 10/01/2025 Yes
58-6-25 2026‑41 S257 44.5(c) 44.5C 01/01/2027 No
58-6-25 (b), (d)(9) 2025‑25 H40 6 5 06/26/2025 Yes
58-6-25 (d) 2026‑41 S257 44.5(a) 44.5 07/01/2026 No
58-7-15 2025‑76 H1003 2.2(a) 22 10/01/2025 Yes
58-7-21 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-10-735 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-10-780 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-16-5 2026‑48 S857 66(a) 66 07/07/2026 No
58-16-5 2026‑48 S857 66(b) 66 07/07/2026 No
58-19-5 2025‑45 H737 3(b) 3 01/01/2026 Yes
58-19-15 (b)(11a) 2025‑45 H737 3(c) 3 01/01/2026 Yes
58-19-25 2025‑45 H737 3(d) 3 01/01/2026 Yes
58-19-26 2025‑45 H737 3(a) 3 01/01/2026 Yes
58-19-27 2025‑45 H737 3(a) 3 01/01/2026 Yes
58-19-28 2025‑45 H737 3(a) 3 01/01/2026 Yes
58-19-40 2025‑45 H737 3(e) 3 01/01/2026 Yes
58-19-40 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-21-35 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-22-15 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-26-45 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-26-45 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-28-14 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-30-125 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-31-1 2026‑50 H1126 3.1(a) 3.1 07/07/2026 No
58-31A-1 (2) 2026‑41 S257 7.31(b) 7.99992 07/01/2026 No
58-31A-20 (a) 2026‑50 H1126 3.1(b) 3.1 07/07/2026 No
58-31A-25 2026‑41 S257 32A.4 32A.4 07/01/2026 No
58-33-10 (4a), (4b) 2025‑45 H737 7(a) 7 07/01/2025 Yes
58-33-30 (d), (e) 2025‑45 H737 1(a) 1 10/01/2025 Yes
58-33-32 (g) 2025‑45 H737 1(b) 1 10/01/2025 Yes
58-33-82 (e)(4), (5) 2025‑45 H737 7(b) 7 07/01/2025 Yes
58-33-82 (f) 2025‑45 H737 2(a) 2 10/01/2025 Yes
58-33-82.1 2025‑45 H737 7(c) 7 07/01/2025 Yes
58-33-85 2025‑97 S449 6.11 6.11 10/22/2025 Yes
58-33-85 (a) 2025‑45 H737 6(c) 6 07/01/2025 Yes
58-35-85 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-36-10 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-36-15 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-36-15 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-36-30 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-36-43 2025‑25 H40 33(a) 33 07/01/2025 Yes
58-36-75 2025‑45 H737 11 11.1 07/01/2025 Yes
58-36-120 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-39-75 (4a) 2025‑76 H1003 2.3(b) 2.3 08/08/2025 Yes
58-39-76 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-41-15 2025‑45 H737 13 13 07/01/2025 Yes
58-44A-1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-44A-10 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-44B-5 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-44B-20 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-44B-35 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-47-140 2026‑41 S257 44.5(d) 44.5D 01/01/2027 No
58-48-10 (5) 2025‑45 H737 5(a) 5 07/01/2025 Yes
58-48-20 (4), (4a) 2025‑45 H737 5(b) 5 07/01/2025 Yes
58-48-35 2025‑45 H737 5(c) 5 07/01/2025 Yes
58-48-50 (a1)(1) 2025‑45 H737 5(d) 5 07/01/2025 Yes
58-48-85 2025‑45 H737 5(e) 5 07/01/2025 Yes
58-50-110 2025‑25 H40 7(c) 7 01/01/2026 Yes
58-50-130 2025‑25 H40 7(b) 7 06/26/2025 Yes
58-50-130 2025‑97 S449 6.6(a) 6.6 10/22/2025 Yes
58-50-130 (a)(5)b. 2025‑25 H40 7(a) 7 06/26/2025 Yes
58-50-285 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-50-292 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-50-296 2025‑37 H67 7.2(a) 7.2 10/01/2025 Yes
58-50-400 2025‑69 S479 5.1(a) 5.1 07/09/2025 Yes
58-50-400 Art. 50, Part 8 2025‑69 S479 5.1(b)(1) 5.1 07/09/2025 Yes
58-50-405 2025‑69 S479 5.1(b) 5.1 07/09/2025 Yes
58-50-405 (a) 2025‑69 S479 5.1(a)(2) 5.1 07/09/2025 Yes
58-50-410 2025‑69 S479 5.1(a)(3) 5.1 07/09/2025 Yes
58-50-410 2025‑69 S479 5.1(b) 5.1 07/09/2025 Yes
58-50-410 (j) 2025‑69 S479 5.2(a) 5.2 01/01/2026 Yes
58-50-415 2025‑69 S479 5.1(b) 5.1 07/09/2025 Yes
58-50-415 2025‑69 S479 5.1(a) 5.1 07/09/2025 Yes
58-50-420 2025‑69 S479 5.1(a)(4) 5.1 07/09/2025 Yes
58-50-420 2025‑69 S479 5.1(b) 5.1 07/09/2025 Yes
58-50-425 2025‑69 S479 5.1(a)(5) 5.1 07/09/2025 Yes
58-50-425 2025‑69 S479 5.1(b) 5.1 07/09/2025 Yes
58-50-429 2025‑69 S479 5.2(b) 5.2 01/01/2026 Yes
58-50-430 2025‑69 S479 5.1(b) 5.1 07/09/2025 Yes
58-51-37 2025‑69 S479 1.1 1.1 10/01/2025 Yes
58-56-26 (e) 2025‑37 H67 5.2(c) 5.2 10/01/2025 Yes
58-56-26 (e) 2025‑37 H67 7.2(c) 7.2 10/01/2025 Yes
58-56A-1 2025‑69 S479 3.1(a) 3.1 10/01/2025 Yes
58-56A-3 (b1), (c3), (f) 2025‑69 S479 4.1 4.1 10/01/2025 Yes
58-56A-4 (g) 2025‑69 S479 3.2(a) 3.2 10/01/2025 Yes
58-56A-6 2025‑69 S479 3.5(a) 3.5 10/01/2025 Yes
58-56A-15 2025‑69 S479 4.2 4.2 10/01/2025 Yes
58-56A-20 2025‑69 S479 6.1 6.1 10/01/2025 Yes
58-56A-21 2025‑69 S479 3.4 3.4 07/09/2025 Yes
58-56A-22 2025‑69 S479 3.1(b) 3.1 10/01/2025 Yes
58-56A-55 2025‑37 H67 5.2(d) 5.2 10/01/2025 Yes
58-56A-55 2025‑37 H67 7.2(d) 7.2 10/01/2025 Yes
58-56A-55 2025‑69 S479 3.3 3.3 07/09/2025 Yes
58-56B-1 Art. 56B 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-5 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-10 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-15 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-20 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-30 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-35 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-40 2025‑69 S479 2.1 2.1 10/01/2026 Yes
58-56B-50 2025‑69 S479 2.2(a) 2.2 07/09/2025 Yes
58-58-1 2025‑76 H1003 2.2(b) 2.2 10/01/2025 Yes
58-58-97 2025‑76 H1003 2.3(a) 2.3 08/08/2025 Yes
58-58-97 (d) 2026‑48 S857 56 56 10/01/2026 No
58-58-125 2025‑76 H1003 2.2(c) 2.2 10/01/2025 Yes
58-58-205 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
58-58-260 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
58-58-260 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-58-330 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
58-58-330 (a) 2025‑76 H1003 2.2(d) 2.2 10/01/2025 Yes
58-58-335 (1a) 2025‑20 H91 1.2 1.2 06/26/2025 Yes
58-58-335 (8) 2025‑76 H1003 2.2(e) 2.2 10/01/2025 Yes
58-58-345 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
58-60-35 (a) 2025‑76 H1003 2.2(f) 2.2 10/01/2025 Yes
58-60-135 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
58-60-135 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
58-63-15 2025‑97 S449 6.11 6.11 10/22/2025 Yes
58-63-15 (8) 2025‑45 H737 6(b) 6 01/01/2027 Yes
58-63-15 (8)b.4. 2025‑45 H737 6(a) 6 07/01/2025 Yes
58-63-16 2025‑45 H737 6(a) 6 07/01/2025 Yes
58-63-16 2025‑97 S449 6.11 6.11 10/22/2025 Yes
58-63-65 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-64-1 Art. 64 2025‑58 H357 1 1 12/01/2025 Yes
58-64-5 2025‑58 H357 1 1 12/01/2025 Yes
58-64-7 2025‑58 H357 1 1 12/01/2025 Yes
58-64-10 2025‑58 H357 1 1 12/01/2025 Yes
58-64-15 2025‑58 H357 1 1 12/01/2025 Yes
58-64-20 2025‑58 H357 1 1 12/01/2025 Yes
58-64-25 2025‑58 H357 1 1 12/01/2025 Yes
58-64-30 2025‑58 H357 1 1 12/01/2025 Yes
58-64-33 2025‑58 H357 1 1 12/01/2025 Yes
58-64-35 2025‑58 H357 1 1 12/01/2025 Yes
58-64-40 2025‑58 H357 1 1 12/01/2025 Yes
58-64-45 2025‑58 H357 1 1 12/01/2025 Yes
58-64-46 2025‑58 H357 1 1 12/01/2025 Yes
58-64-50 2025‑58 H357 1 1 12/01/2025 Yes
58-64-55 2025‑58 H357 1 1 12/01/2025 Yes
58-64-60 2025‑58 H357 1 1 12/01/2025 Yes
58-64-65 2025‑58 H357 1 1 12/01/2025 Yes
58-64-70 2025‑58 H357 1 1 12/01/2025 Yes
58-64-75 2025‑58 H357 1 1 12/01/2025 Yes
58-64-80 2025‑58 H357 1 1 12/01/2025 Yes
58-64-85 2025‑58 H357 1 1 12/01/2025 Yes
58-64A-1 Art. 64A, Part 1 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-2 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-5 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-10 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-15 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-20 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-25 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-30 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-35 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-40 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-45 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-50 Art. 64A, Part 2 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-55 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-60 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-65 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-70 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-75 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-80 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-85 Art. 64A, Part 3 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-90 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-95 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-100 Art. 64A, Part 4 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-105 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-110 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-115 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-120 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-125 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-130 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-135 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-140 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-145 Art. 64A, Part 5 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-150 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-155 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-155 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
58-64A-160 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-165 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-170 Art. 64A, Part 6 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-175 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-180 Art. 64A, Part 7 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-185 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-190 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-195 Art. 64A, Part 8 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-200 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-205 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-210 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-215 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-220 Art. 64A, Part 9 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-225 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-230 Art. 64A, Part 10 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-235 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-240 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-245 Art. 64A, Part 11 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-250 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-255 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-260 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-265 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-270 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-275 Art. 64A, Part 12 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-280 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-285 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-290 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-295 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-300 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-305 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-310 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-315 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-320 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-325 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-330 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-335 Art. 64A, Part 13 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-340 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-345 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-350 Art. 64A, Part 14 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-355 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-360 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-365 Art. 64A, Part 15 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-370 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-375 2025‑58 H357 2 2 12/01/2025 Yes
58-64A-380 2025‑58 H357 2 2 12/01/2025 Yes
58-71-75 (a), (b) 2026‑48 S857 67 67 10/01/2026 No
58-78A-1 2026‑41 S257 13.4(a) 13.90 01/01/2027 No
58-82A-1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-82B-10 (2) 2025‑4 H74 2.3(a) 2.3 05/14/2025 Yes
58-86-2 2026‑41 S257 41.29(f) 41.999 01/01/2027 No
58-86-20 2026‑50 H1126 3.1(c) 3.1 07/07/2026 No
58-86-35 2026‑41 S257 41.29(c) 41.9M 01/01/2027 No
58-86-40 2026‑41 S257 41.29(d) 41.9N 01/01/2027 No
58-86-41 2026‑50 H1126 1.5 1.5 07/07/2026 No
58-86-41 2026‑41 S257 41.29(b) 41.9L 01/01/2027 No
58-86-45 2026‑41 S257 41.29(e) 41.9O 01/01/2027 No
58-86-55 2026‑41 S257 41.29(a) 41.9K 01/01/2027 No
58-87-1 2026‑41 S257 32A.3(b) 32A.3 07/01/2026 No
58-87-1 (a1)(1) 2026‑41 S257 32A.3(a) 32A.3 07/01/2026 No
58-87-5 (a) 2026‑50 H1126 3.1(d) 3.1 07/07/2026 No
58-87-10 (f) 2026‑41 S257 32A.2 32A.2 07/01/2026 No
58-89A-5 2026‑48 S857 68(a) 68 07/07/2026 No
58-89A-5 (3), (17) - (19) 2025‑45 H737 4(a) 4 07/01/2025 Yes
58-89A-15 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-89A-35 (b) 2025‑45 H737 4(b) 4 07/01/2025 Yes
58-89A-50 2025‑45 H737 4(c) 4 07/01/2025 Yes
58-89A-50 2026‑48 S857 68(b) 68 07/07/2026 No
58-89A-60 2025‑45 H737 4(e) 4 07/01/2025 Yes
58-89A-60 2026‑48 S857 68(c) 68 07/07/2026 No
58-89A-60 (g) 2025‑45 H737 4(d) 4 07/01/2025 Yes
58-89A-70 2025‑45 H737 4(f) 4 07/01/2025 Yes
58-89A-75 2025‑45 H737 4(g) 4 07/01/2025 Yes
58-91-20 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-91-35 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
58-441 Art. 26 2026‑45 H920 1 1 01/01/2027 No
62-3 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
62-10 (h1) 2026‑41 S257 11.12 11.90 07/01/2026 No
62-12 2026‑40 S1041 4.10 4.9 10/01/2026 No
62-14 2026‑40 S1041 4.11 4.9 10/01/2026 No
62-14 (b) 2026‑40 S1041 5.9(h) 5.9 10/01/2026 No
62-14 (b) 2026‑41 S257 11.13(b) 11.91 07/01/2026 No
62-14 (b) 2026‑42 H56 4.8(a) 4.8B 07/01/2026 No
62-14 (b) 2026‑42 H56 4.8(b) 4.8F 07/01/2026 No
62-15 (c) 2026‑40 S1041 4.12 4.9 10/01/2026 No
62-23 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
62-30.1 2025‑89 H125 4.5 4.5 07/01/2025 Yes
62-48 2026‑41 S257 11.15 11.93 07/01/2026 No
62-54 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
62-71 (c) 2026‑41 S257 11.14(a) 11.92 07/01/2026 No
62-73.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
62-78 (e) 2026‑41 S257 11.14(b) 11.92 07/01/2026 No
62-81 (a) 2026‑41 S257 11.14(c) 11.92 07/01/2026 No
62-82 (a) 2026‑41 S257 11.14(d) 11.92 07/01/2026 No
62-110 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
62-110.1 (e), (f) 2025‑78 S266 2(a) 2 07/29/2025 Yes
62-110.9 2025‑78 S266 1 1 07/29/2025 Yes
62-133 (b)(1)c., (c) 2025‑78 S266 2(b) 2 07/29/2025 Yes
62-133.1B (e) 2026‑32 H376 1 1 07/02/2026 No
62-133.2 2025‑78 S266 3 3 07/29/2025 Yes
62-133.8 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
62-133.15 2026‑41 S257 11.6 11.6 07/01/2026 No
62-133.16 (c), (d), (j) 2025‑78 S266 4 4 07/29/2025 Yes
62-172 2025‑78 S266 5 5 07/29/2025 Yes
62-280.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
63-111 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
63A-3 (b) 2026‑50 H1126 6.4 6.4 07/07/2026 No
63A-19 2026‑41 S257 22.5(x) 22.5T 07/01/2026 No
63A-19.1 2026‑41 S257 22.5(d) 22.5A 07/01/2026 No
63A-23 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
63A-24 (b) 2026‑40 S1041 4.13 4.9 10/01/2026 No
64-33.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
64-34 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
64-60 Art. 4 2026‑54 H133 1 1 04/01/2027 No
64-61 2026‑54 H133 1 1 04/01/2027 No
64-62 2026‑54 H133 1 1 04/01/2027 No
64-63 2026‑54 H133 1 1 04/01/2027 No
64-64 2026‑54 H133 1 1 04/01/2027 No
65-25 (4) 2026‑40 S1041 5.7(a) 5.7 10/01/2026 No
65-45 2026‑41 S257 35.1(a) 35.1 07/01/2026 No
65-45.1 2026‑41 S257 35.1(a) 35.1 07/01/2026 No
65-48 (2a) 2025‑68 H210 1 1 07/07/2025 Yes
65-48 (4), (7) 2026‑48 S857 57 57 10/01/2026 No
65-53 (7a) 2025‑68 H210 2 2 07/07/2025 Yes
65-62 2025‑68 H210 3 3 07/07/2025 Yes
65-111 (3) 2026‑41 S257 37.2(a) 37.2 07/01/2026 No
66-58 2025‑25 H40 29(5) 29.5 06/26/2026 Yes
66-58 (b)(8b) 2026‑41 S257 7.43(c) 7.9C2 07/01/2026 No
66-58 (c)(23) 2026‑41 S257 12.14(b) 12.93 07/01/2026 No
66-58.10 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
66-58.12 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
66-58.20 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
66-207 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
66-354 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
66-355 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
66-362 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
66-385 Art. 45, Part 1, title 2025‑25 H40 34(a) 34 06/26/2025 Yes
66-386 2025‑25 H40 34(a) 34 06/26/2025 Yes
66-391 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
66-392 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
66-392 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
66-458 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
66-500 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
66-505 Art. 51A 2025‑84 H805 2(a) 2 12/01/2025 Yes
66-506 2025‑84 H805 2(a) 2 12/01/2025 Yes
66-507 2025‑84 H805 2(a) 2 12/01/2025 Yes
66-508 2025‑84 H805 2(a) 2 12/01/2025 Yes
66-509 2025‑84 H805 2(a) 2 12/01/2025 Yes
66-510 2025‑84 H805 2(a) 2 12/01/2025 Yes
66-511 Art. 52 2026‑14 H315 1 1 06/22/2026 No
66-512 2026‑14 H315 1 1 06/22/2026 No
66-513 2026‑14 H315 1 1 06/22/2026 No
66-514 2026‑14 H315 1 1 06/22/2026 No
66-515 2026‑14 H315 1 1 06/22/2026 No
66-515 Art. 52 2026‑31 S595 14(a) 14 07/02/2026 No
68-20 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
70-14 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
70-38 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
70-52 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
72-1 2026‑41 S257 5A.17 5A.17 07/01/2026 No
74-24.19 (a) 2026‑40 S1041 4.14 4.9 10/01/2026 No
74C-2 (c) 2025‑51 S710 2(a) 2 10/01/2025 Yes
74C-3 (a)(6), (7) 2025‑51 S710 2(b) 2 10/01/2025 Yes
74C-3 (a)(6)e. 2025‑70 S429 22 22 07/09/2025 Yes
74C-8.1 (a) 2026‑41 S257 20.2(b) 20.2 07/07/2026 No
74C-9 (e)(17), (h), (i) 2025‑51 S710 2(c) 2 10/01/2025 Yes
74C-11 2025‑51 S710 2(d) 2 10/01/2025 Yes
74C-12 (a)(1), (9), (27) 2025‑51 S710 2(e) 2 10/01/2025 Yes
74C-13 2025‑51 S710 2(f) 2 10/01/2025 Yes
74C-13 (a1) 2025‑51 S710 9 9 07/02/2025 Yes
74C-30 (d) 2026‑50 H1126 3.1(e) 3.1 07/07/2026 No
74D-1 Chapter, title 1 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-1 Art. 1, title 2 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-1 3 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-2 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-2.1 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-3 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-4 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-5 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-5.1 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-5.2 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-6 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-7 (c), (d) 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-8 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-8.1 (a) 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-9 (d) 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-10 (a) 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-11 (b), (c), (e), (f) 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-13 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-14 2025‑51 S710 1(a) 1 10/01/2025 Yes
74D-30 (d) 2026‑50 H1126 3.1(f) 3.1 07/07/2026 No
74D-30 Art. 2 2025‑51 S710 1(b) 1 10/01/2025 Yes
74E-6 (c) 2025‑ S50 14 14 12/01/2025 Vetoed No
74G-6 (d) 2025‑ S50 15 15 12/01/2025 Vetoed No
75-40 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
75-41 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
75-42 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
75-44 (a) 2026‑41 S257 5.8(b) 5.8 10/01/2026 No
75-44 (b) 2026‑41 S257 5.8(b) 5.8 10/01/2026 No
75-44 (c) 2026‑41 S257 5.8(b) 5.8 10/01/2026 No
75-45 2026‑31 S595 14(h) 14 07/02/2026 No
75-62 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
75-62 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
75-63 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
75-63 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
75-63 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
75-63.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
75-63.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
75-65 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
75-65 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
75-65 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
75-66 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
75-102 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
75-142 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
75-151 Art. 9 1 2026‑41 S257 5.8(a) 5.8 10/01/2026 No
75-151 2 2026‑41 S257 5.8(b) 5.8 10/01/2026 No
75-151 3 2026‑41 S257 5.8(c) 5.8 10/01/2026 No
75-152 2026‑41 S257 5.8(b) 5.8 10/01/2026 No
75-152 2026‑41 S257 5.8(c) 5.8 10/01/2026 No
75-153 2026‑41 S257 5.8(c) 5.8 10/01/2026 No
75-154 2026‑41 S257 5.8(c) 5.8 10/01/2026 No
75-155 2026‑41 S257 5.8(c) 5.8 10/01/2026 No
75-156 2026‑41 S257 5.8(c) 5.8 10/01/2026 No
75-157 2026‑41 S257 5.8(b) 5.8 10/01/2026 No
75-157 2026‑41 S257 5.8(c) 5.8 10/01/2026 No
75A-3 (c) 2026‑41 S257 15.1(f) 15.1 10/01/2026 No
75A-5 2026‑41 S257 15.1(g) 15.1 10/01/2026 No
75A-5 (b) 2026‑43 H747 3(a) 3 10/01/2026 No
75A-6.1 (a) 2026‑43 H747 3(c) 3 10/01/2026 No
75A-7 (a)(1) 2026‑43 H747 3(b) 3 10/01/2026 No
75A-13.3 (d), (e) 2026‑43 H747 3(d) 3 10/01/2026 No
75D-3 2025‑25 H40 35(a) 35 06/26/2025 Yes
75D-3 2025‑25 H40 35(b) 35 06/26/2025 Yes
75D-5 2025‑25 H40 35(c) 35 06/26/2025 Yes
75D-8 2025‑25 H40 35(d) 35 06/26/2025 Yes
77-50 Art. 5 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-51 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-52 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-53 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-54 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-55 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-56 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-57 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-58 2025‑25 H40 35.1 35.1 06/26/2025 Yes
77-80 Art. 6B, title 2025‑67 H23 5.1(a) 5.1 07/07/2025 Yes
77-89.1 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.1 Art. 7B 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.2 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.2 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.3 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.3 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.4 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.4 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.5 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.5 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.6 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.6 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.7 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.7 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.8 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.8 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-89.9 2025‑67 H23 5.1(d) 5.1 07/07/2025 Yes
77-89.10 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
77-89.10 2025‑67 H23 5.1(c) 5.1 07/07/2025 Yes
77-113 (a)(10), (c), (f) 2025‑67 H23 5.3 5.3 07/07/2025 Yes
77-132 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
78-14 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
78A-14 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
78A-17.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
78A-36 (b) 2025‑45 H737 12(a) 12 10/01/2025 Yes
78A-36 (b) 2025‑52 S690 2(a) 2 10/01/2025 Yes
78A-36 (b) 2026‑41 S257 37.1(b) 37.1B 07/01/2026 No
78A-37 (b) 2026‑41 S257 37.1(a) 37.1 07/01/2026 No
78C-86 2025‑46 H378 7(a) 7 07/01/2025 Yes
78C-88 2025‑46 H378 7(a) 7 07/01/2025 Yes
78C-94 2025‑46 H378 7(a) 7 07/01/2025 Yes
78C-95 2025‑46 H378 7(a) 7 07/01/2025 Yes
78C-98 2025‑46 H378 7(a) 7 07/01/2025 Yes
81A-32 2026‑31 S595 14(i) 14 07/02/2026 No
81A-52 2026‑11 S401 13(a) 13 06/22/2026 No
81A-54 2026‑11 S401 13(b) 13 06/22/2026 No
83A-5 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
84-2.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
84-2.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
84-4.1 2025‑19 H476 3.1 3.1 06/26/2025 Yes
84-22.1 2026‑41 S257 16.25(b) 16.9992 07/01/2026 No
84-24 2026‑41 S257 20.2(c) 20.2 07/07/2026 No
84-28 2025‑54 H620 20 20 07/02/2025 Yes
85B-1 2025‑25 H40 36(a) 36 06/26/2025 Yes
85B-1 2025‑25 H40 36(b) 36 06/26/2025 Yes
87-10.2 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
87-22 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
87-96 2026‑32 H376 8(a) 8 07/02/2026 No
87-97 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
87-97 (a) 2026‑32 H376 8(b) 8 07/02/2026 No
87-117 (15), (20a), (22) 2025‑21 H247 1 1 10/01/2025 Yes
87-121 2025‑21 H247 2 2 10/01/2025 Yes
87-122 2025‑21 H247 3 3 10/01/2025 Yes
87-124 2025‑21 H247 4 4 10/01/2025 Yes
87-126 (c) 2025‑21 H247 5 5 10/01/2025 Yes
87-128 2025‑21 H247 6 6 10/01/2025 Yes
87-129 2025‑21 H247 7 7 10/01/2025 Yes
88B-25 2026‑48 S857 58 58 10/01/2026 No
88B-25 (4) 2025‑20 H91 2.7 2.7 06/26/2025 Yes
89C-3 2026‑41 S257 38A.1(a) 38A.1 07/01/2022 No
89C-3 2026‑41 S257 38A.1(c) 38A.1B 10/01/2026 No
89C-10 2026‑41 S257 38A.1(d) 38A.1C 10/01/2026 No
89C-12 2026‑41 S257 38A.1(e) 38A.1D 10/01/2026 No
89C-13 2026‑41 S257 38A.1(f) 38A.1E 10/01/2026 No
89C-13 (b)(1) 2026‑41 S257 38A.1(b) 38A.1A 07/01/2022 No
89C-14 2026‑41 S257 38A.1(g) 38A.1F 10/01/2026 No
89C-16 2026‑41 S257 38A.1(h) 38A.1G 10/01/2026 No
89C-17 2026‑41 S257 38A.1(i) 38A.1H 10/01/2026 No
89C-19.2 2025‑94 H926 2(a) 2 10/06/2025 Yes
89C-23 2026‑41 S257 38A.1(j) 38A.1I 10/01/2026 No
89C-25 (12) 2026‑41 S257 38A.1(k) 38A.1J 10/01/2026 No
89C-25.2 2026‑41 S257 38A.1(l) 38A.1K 10/01/2026 No
89E-3 2025‑25 H40 9(a) 9 06/26/2025 Yes
89E-4 (c) 2025‑25 H40 9(b) 9 06/26/2025 Yes
89E-6 (1), (4) 2025‑25 H40 9(c) 9 06/26/2025 Yes
89E-7 (b)(2), (3) 2025‑25 H40 9(d) 9 06/26/2025 Yes
89E-8 2025‑25 H40 9(e) 9 06/26/2025 Yes
89E-9 2025‑25 H40 9(f) 9 06/26/2025 Yes
89E-11 2025‑25 H40 9(g) 9 06/26/2025 Yes
89E-13 2025‑25 H40 9(h) 9 06/26/2025 Yes
89E-14 (b)(4) 2025‑25 H40 9(i) 9 06/26/2025 Yes
89E-18 2025‑25 H40 9(j) 9 06/26/2025 Yes
89E-19 (b) 2025‑25 H40 9(k) 9 06/26/2025 Yes
89E-22 2025‑25 H40 9(l) 9 06/26/2025 Yes
89E-24 2025‑25 H40 9(m) 9 06/26/2025 Yes
90-1.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
90-1.1 (4), (4a) 2025‑37 H67 4(e) 4 04/01/2026 Yes
90-1.1 (4d) 2025‑37 H67 6.1(a) 6.1 See Bill Yes
90-3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-5.1 1 2025‑37 H67 1(b) 1 01/01/2026 Yes
90-5.1 (11), (12) 2 2025‑37 H67 4(f) 4 04/01/2026 Yes
90-5.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
90-5.3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-9.3 2025‑37 H67 6.1(b) 6.1 See Bill Yes
90-9.3 (a1) 2025‑37 H67 4(b) 4 04/01/2026 Yes
90-9.3A 2025‑37 H67 6.1(c) 6.1 See Bill Yes
90-11 (b) 2025‑37 H67 4(g) 4 04/01/2026 Yes
90-11 (b) 2025‑37 H67 1(c) 1 01/01/2026 Yes
90-11 (b) 2026‑41 S257 20.2(e) 20.2A 07/07/2026 No
90-12.03 2025‑37 H67 2(a) 2 01/01/2026 Yes
90-12.4 (d) 2025‑37 H67 6.1(d) 6.1 See Bill Yes
90-12.4B catch line 2025‑37 H67 6.1(e) 6.1 See Bill Yes
90-13.1 2025‑37 H67 1(d) 1 01/01/2026 Yes
90-13.1 2026‑41 S257 9L.1(a) 9L.1 10/01/2026 No
90-13.1 (g) 2025‑37 H67 4(d) 4 04/01/2026 Yes
90-13.2 2025‑37 H67 1(e) 1 01/01/2026 Yes
90-13.2 2026‑41 S257 9L.1(b) 9L.1 10/01/2026 No
90-13.2 (a), (b1) 2025‑37 H67 4(c) 4 04/01/2026 Yes
90-14 (a)(18) 2025‑37 H67 4(h) 4 04/01/2026 Yes
90-14 (a)(18) 2025‑37 H67 1(f) 1 01/01/2026 Yes
90-14.2 (a) 2025‑37 H67 1(g) 1 01/01/2026 Yes
90-18 (c)(3a) 2025‑37 H67 7.1(a) 7.1 10/01/2025 Yes
90-18.1 2025‑37 H67 6.1(f) 6.1 See Bill Yes
90-18.4 2025‑37 H67 7.1(b) 7.1 10/01/2025 Yes
90-21.15A 2025‑60 S600 4.1 4.1 07/03/2025 Yes
90-21.81 (9) 2025‑37 H67 6.1(g) 6.1 See Bill Yes
90-21.84 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-21.93 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-21.104 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-21.132 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-21.160 Art. 1O 2025‑84 H805 3.1(a) 3.1 07/29/2025 Yes
90-21.170 Art. IP 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.171 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.172 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.173 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.174 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.175 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.176 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.177 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.178 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.179 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.180 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.181 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.182 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.183 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.184 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.185 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.186 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.187 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.188 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.189 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.190 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.191 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.192 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.193 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-21.194 2025‑37 H67 1(a) 1 01/01/2026 Yes
90-30 (b) 2026‑41 S257 20.2(f) 20.2B 07/07/2026 No
90-85.3 (b2) 2025‑37 H67 7.1(c) 7.1 10/01/2025 Yes
90-85.3 (b2), (b3) 2025‑37 H67 5.1(a) 5.1 10/01/2025 Yes
90-85.3A (b), (e) 2025‑37 H67 5.1(b) 5.1 10/01/2025 Yes
90-85.15A 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-85.28 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-85.42 2025‑69 S479 9 9 07/09/2025 Yes
90-85.50 (b) 2025‑69 S479 5.1(a)(2) 5.1 07/09/2025 Yes
90-85.51 2025‑69 S479 5.1(a)(4) 5.1 07/09/2025 Yes
90-85.52 2025‑69 S479 5.1(a)(3) 5.1 07/09/2025 Yes
90-85.53 2025‑69 S479 5.1(a)(5) 5.1 07/09/2025 Yes
90-85.60 Art. 4D 2025‑69 S479 8(a) 8.1 01/01/2026 Yes
90-85.61 2025‑69 S479 8(a) 8.1 01/01/2026 Yes
90-85.62 2025‑69 S479 8(a) 8.1 01/01/2026 Yes
90-85.63 2025‑69 S479 8(a) 8.1 01/01/2026 Yes
90-88 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-95 2025‑70 S429 14(a) 14 12/01/2025 Yes
90-95 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-95 (e) 2026‑ H437 1(b) 1 12/01/2026 Vetoed No
90-96.2 (c3)(3a) 2025‑71 S311 2(d) 2 12/01/2025 Yes
90-96.2 (c3)(3a) 2025‑91 S245 3.5(a) 3.5 12/01/2025 Yes
90-102.1 (d) 2026‑41 S257 20.2(g) 20.2C 07/07/2026 No
90-113.52A 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
90-113.151 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-113.158 Art. 5I 2025‑71 S311 2(c) 2 12/01/2025 Yes
90-116 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-121.6 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-171.95F 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-171.95F 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-171.95G 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-171.95G 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-187.10 (13) 2025‑42 H975 2(a) 2 See Bill Yes
90-210.18A 2025‑76 H1003 3.1 3.1 07/09/2025 Yes
90-210.18A 2026‑48 S857 3 3 10/012026 No
90-210.18A 2026‑48 S857 5 5 10/01/2026 No
90-210.19 2026‑48 S857 2 2 10/01/2026 No
90-210.20 2025‑71 S311 2(a) 2 12/01/2025 Yes
90-210.20 2025‑76 H1003 3.2(b) 3.2 07/09/2025 Yes
90-210.20 2026‑48 S857 6 6 10/01/2026 No
90-210.20 2026‑48 S857 7 7 10/01/2026 No
90-210.20 (a), (b), (c), (c1) 1 2025‑76 H1003 3.2(a) 3.2 07/09/2025 Yes
90-210.20 (c2), (d), (e), (e2) 2 2025‑76 H1003 3.2(a) 3.2 07/09/2025 Yes
90-210.20 (f), (g), (h), (i) 3 2025‑76 H1003 3.2(a) 3.2 07/09/2025 Yes
90-210.20 (j), (k), (l) 4 2025‑76 H1003 3.2(a) 3.2 07/09/2025 Yes
90-210.20 (1), (3), (5), (6) 5 2025‑76 H1003 3.2(a) 3.1 07/09/2025 Yes
90-210.20 (7), (8), (9), (11) 6 2025‑76 H1003 3.2(a) 3.2 07/09/2025 Yes
90-210.20 (12), (13), (14), (16) 7 2025‑76 H1003 3.2(a) 3.2 07/09/2025 Yes
90-210.20 (17), (18), (20) 8 2025‑76 H1003 3.2(a) 3.2 07/09/2025 Yes
90-210.22 catch line 1 2026‑48 S857 1 1 10/01/2026 No
90-210.22 2 2026‑48 S857 3 3 10/01/2026 No
90-210.22 3 2026‑48 S857 4 4 10/01/2026 No
90-210.22 4 2026‑48 S857 8 8 10/01/2026 No
90-210.22 (b) 5 2026‑48 S857 2 2 10/01/2026 No
90-210.23 2026‑48 S857 4 4 10/01/2026 No
90-210.23 2026‑48 S857 9 9 10/01/2026 No
90-210.23 2026‑48 S857 18 18 10/01/2026 No
90-210.23 (d), (d1), (e) 2025‑76 H1003 3.3 3.3 07/09/2025 Yes
90-210.23 (g) 2026‑48 S857 18 18 10/01/2026 No
90-210.24 2025‑76 H1003 3.4 3.4 07/09/2025 Yes
90-210.24 2026‑48 S857 10 10 10/01/2026 No
90-210.25 2025‑76 H1003 3.5 3.5 07/09/2025 Yes
90-210.25 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
90-210.25 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-210.25 (a2)(2) 2025‑76 H1003 5.1A(a) 5.1 07/01/2030 Yes
90-210.25 catch line 1 2026‑48 S857 11 11 10/01/2026 No
90-210.25 2 2026‑48 S857 6 6 10/01/2026 No
90-210.25 2 2026‑48 S857 20 20 10/01/2026 No
90-210.25 2 2026‑48 S857 23 23 10/01/2026 No
90-210.25 2 2026‑48 S857 32 32 10/01/2026 No
90-210.25 2 2026‑48 S857 45 45 10/01/2026 No
90-210.25 2 2026‑48 S857 12 12 10/01/2026 No
90-210.25 2 2026‑48 S857 39 39 10/01/2026 No
90-210.25 (a)(1), (a)(3a) 3 2026‑48 S857 14 14 10/01/2026 No
90-210.25 (a)(2), (d1) 3.5 2026‑48 S857 16 16 10/01/2026 No
90-210.25 (a)(3) 6 2026‑48 S857 13 13 10/01/2026 No
90-210.25 (a)(4) 7 2026‑48 S857 21 21 10/01/2026 No
90-210.25 (a)(5)b. 7.4 2026‑48 S857 37 37 10/01/2026 No
90-210.25 (a)(5)h. 7.45 2026‑41 S257 20.2(h) 20.2C 07/07/2026 No
90-210.25 (a)(5)h. 7.5 2026‑48 S857 43 43 10/01/2026 No
90-210.25 (a1) 7.55 2026‑48 S857 22 22 10/01/2026 No
90-210.25 (a2) 7.56 2026‑48 S857 15 15 10/01/2026 No
90-210.25 (b)(1), (b)(3) 7.7 2026‑48 S857 19 19 10/01/2026 No
90-210.25 (c)(5) 7.8 2026‑48 S857 34 34 10/01/2026 No
90-210.25 (c)(6), (c)(9) 7.9 2026‑48 S857 35 35 10/01/2026 No
90-210.25 (d)(1) 8 2026‑48 S857 24 24 10/01/2026 No
90-210.25 (d)(4) 8.1 2026‑48 S857 42 42 10/01/2026 No
90-210.25 (e) 8.2 2026‑48 S857 26 26 10/01/2026 No
90-210.25 (e) 8.2 2026‑48 S857 28 28 10/01/2026 No
90-210.25 (e) 8.2 2026‑48 S857 30 30 10/01/2026 No
90-210.25 (e)(1) 8.3 2026‑48 S857 40 40 10/01/2026 No
90-210.25 (e)(2) 8.4 2026‑48 S857 41 41 10/01/2026 No
90-210.25 (e1) 9 2026‑48 S857 31 31 10/01/2026 No
90-210.25B 2025‑76 H1003 3.6 3.6 07/09/2025 Yes
90-210.25B (d) 2026‑48 S857 59 59 10/01/2026 No
90-210.25C 2026‑48 S857 29 29 10/01/2026 No
90-210.25D 2026‑48 S857 13 13 10/01/2026 No
90-210.25E 2026‑48 S857 14 14 10/01/2026 No
90-210.25F 2026‑48 S857 15 15 10/01/2026 No
90-210.25G 2026‑48 S857 16 16 10/01/2026 No
90-210.25H 2026‑48 S857 17 17 10/01/2026 No
90-210.25I 2026‑48 S857 18 18 10/01/2026 No
90-210.25J (a), (b) 2026‑48 S857 19 19 10/01/2026 No
90-210.25K 2026‑48 S857 20 20 10/01/2026 No
90-210.25L 2026‑48 S857 21 21 10/01/2026 No
90-210.25M 2026‑48 S857 22 22 10/01/2026 No
90-210.25N 2026‑48 S857 23 23 10/01/2026 No
90-210.25O 2026‑48 S857 24 24 10/01/2026 No
90-210.26 2025‑76 H1003 3.7 3.7 07/09/2025 Yes
90-210.27A 2025‑76 H1003 3.8 3.8 07/09/2025 Yes
90-210.27A 2026‑48 S857 24 24 10/01/2026 No
90-210.27A 2026‑48 S857 25 25 10/01/2026 No
90-210.27A (a1) 2025‑2 H47 5.6(a) 5.6 03/19/2025 Yes
90-210.27B 2026‑48 S857 26 26 10/01/2026 No
90-210.27C 2026‑48 S857 27 27 10/01/2026 No
90-210.27D 2026‑48 S857 28 28 10/01/2026 No
90-210.27E 2026‑48 S857 29 29 10/01/2026 No
90-210.27F 2026‑48 S857 30 30 10/01/2026 No
90-210.27G 2026‑48 S857 31 31 10/01/2026 No
90-210.27H 2026‑48 S857 32 32 10/01/2026 No
90-210.27I 2026‑48 S857 33 33 10/01/2026 No
90-210.27J 2026‑48 S857 34 34 10/01/2026 No
90-210.27K (a), (b) 2026‑48 S857 35 35 10/01/2026 No
90-210.27L 2026‑48 S857 36 36 10/01/2026 No
90-210.27M 2026‑48 S857 37 37 10/01/2026 No
90-210.28 2025‑76 H1003 3.9 3.9 07/09/2025 Yes
90-210.28 2026‑48 S857 38 38 10/01/2026 No
90-210.28A 2026‑48 S857 39 39 10/01/2026 No
90-210.28B 2026‑48 S857 40 40 10/01/2026 No
90-210.28C 2026‑48 S857 41 41 10/01/2026 No
90-210.28D 2026‑48 S857 42 42 10/01/2026 No
90-210.28E 2026‑48 S857 43 43 10/01/2026 No
90-210.29 (a) 2026‑48 S857 18 18 10/01/2026 No
90-210.29A 2025‑76 H1003 3.10 3.10 07/09/2025 Yes
90-210.29A 2026‑48 S857 27 27 10/01/2026 No
90-210.29B 2025‑76 H1003 3.11 3.11 07/09/2025 Yes
90-210.29C 2025‑71 S311 2(b) 2 12/01/2025 Yes
90-210.29C 2026‑48 S857 44 44 10/01/2026 No
90-210.60 2025‑76 H1003 4.1 4.1 07/09/2025 Yes
90-210.60 2026‑48 S857 46 46 10/01/2026 No
90-210.60 (5), (10) 2025‑76 H1003 2.1(a) 2.1 10/01/2025 Yes
90-210.61 2026‑48 S857 46 46 10/01/2026 No
90-210.61 (d) 2025‑76 H1003 4.2 4.2 07/09/2025 Yes
90-210.62 (b) 2025‑76 H1003 4.3 4.3 07/09/2025 Yes
90-210.63 2025‑76 H1003 4.4 4.4 07/09/2025 Yes
90-210.64 2025‑76 H1003 4.5 4.5 07/09/2025 Yes
90-210.67 2026‑48 S857 46 46 10/01/2026 No
90-210.67 (b), (c) 2025‑76 H1003 4.6 4.6 07/09/2025 Yes
90-210.67 (b), (c) 2025‑76 H1003 4.6 4.6 07/09/2025 Yes
90-210.68 2025‑76 H1003 4.7 4.7 07/09/2025 Yes
90-210.68 2026‑48 S857 46 46 10/01/2026 No
90-210.69 2025‑76 H1003 4.8 4.8 07/09/2025 Yes
90-210.69 (c), (d) 2026‑48 S857 60 60 10/01/2026 No
90-210.70 (e) 2025‑76 H1003 4.9 4.9 07/09/2025 Yes
90-210.72 2025‑76 H1003 2.1(b) 2.1 10/01/2025 Yes
90-210.73 2025‑76 H1003 4.10 4.10 07/09/2025 Yes
90-210.80 2026‑48 S857 61 61 10/01/2026 No
90-210.81 2026‑48 S857 62 62 10/01/2026 No
90-210.85 2026‑48 S857 47 47 10/01/2026 No
90-210.107 (i) 2026‑48 S857 48 48 10/01/2026 No
90-210.120 2026‑48 S857 51 51 10/01/2026 No
90-210.120 Art. 13F, title 2025‑76 H1003 1.1(b) 1.1 10/01/2025 Yes
90-210.121 2026‑48 S857 49 49 10/01/2026 No
90-210.121 2026‑48 S857 51 51 10/01/2026 No
90-210.121 1 2025‑76 H1003 1.1(c) 1.1 10/01/2025 Yes
90-210.121 (1) 2 2025‑76 H1003 1.1(a) 1.1 10/01/2025 Yes
90-210.121 (1a) 3 2025‑76 H1003 1.1(a) 1.1 10/01/2025 Yes
90-210.121 (17a) 4 2025‑76 H1003 1.1(a) 1.1 10/01/2025 Yes
90-210.121 (17a), (17b), (17c), (17d) 5 2025‑76 H1003 1.1(a) 1.1 10/01/2025 Yes
90-210.122 2025‑76 H1003 1.2 1.2 10/01/2025 Yes
90-210.123 2025‑76 H1003 1.4 1.4 10/01/2025 Yes
90-210.123 2026‑48 S857 51 51 10/01/2026 No
90-210.124 2025‑76 H1003 1.5 1.5 10/01/2025 Yes
90-210.124A 2025‑76 H1003 1.6 1.6 10/01/2025 Yes
90-210.124A 2026‑48 S857 51 51 10/01/2026 No
90-210.125 2026‑48 S857 51 51 10/01/2026 No
90-210.125 (a)(6), (7), (13) 2025‑76 H1003 1.7 1.7 10/01/2025 Yes
90-210.126 2026‑48 S857 51 51 10/01/2026 No
90-210.126 (a) 2025‑76 H1003 1.8 1.8 10/01/2025 Yes
90-210.127 2026‑48 S857 51 51 10/01/2026 No
90-210.127 (b), (c), (d) 2025‑76 H1003 1.9 1.9 10/01/2025 Yes
90-210.128 2026‑48 S857 51 51 10/01/2026 No
90-210.128 (b) 2025‑76 H1003 1.10 1.10 10/01/2025 Yes
90-210.129 2025‑76 H1003 1.11 1.11 10/01/2025 Yes
90-210.129 2026‑48 S857 51 51 10/01/2026 No
90-210.129 (d1) 2026‑48 S857 50 50 10/01/2026 No
90-210.130 2025‑76 H1003 1.12 1.12 10/01/2025 Yes
90-210.130 2026‑48 S857 51 51 10/01/2026 No
90-210.131 2026‑48 S857 51 51 10/01/2026 No
90-210.131 (d), (e) 2025‑76 H1003 1.13 1.13 10/01/2025 Yes
90-210.132 2025‑76 H1003 1.14 1.14 10/01/2025 Yes
90-210.132 2026‑48 S857 51 51 10/01/2026 No
90-210.133 2026‑48 S857 51 51 10/01/2026 No
90-210.134 2026‑48 S857 51 51 10/01/2026 No
90-210.135 2026‑48 S857 51 51 10/01/2026 No
90-210.136 2025‑76 H1003 1.15 1.15 10/01/2025 Yes
90-210.136 2026‑48 S857 51 51 10/01/2026 No
90-210.136 (a)(1), (2), (3), (4) 2025‑76 H1003 1.1(a) 1.1 10/01/2025 Yes
90-210.136 (g) 2026‑48 S857 50 50 10/01/2026 No
90-224 (c) 2026‑41 S257 20.2(i) 20.2D 07/07/2026 No
90-270.51 (f) 2026‑40 S1041 4.15 4.9 10/01/2026 No
90-270.56 2025‑37 H67 10(a) 10 10/01/2025 Yes
90-270.63 2025‑37 H67 10(b) 10 10/01/2025 Yes
90-270.90 (4) 2026‑16 H536 1 1 10/01/2026 No
90-270.91 2026‑16 H536 2 2 10/01/2026 No
90-270.92 2026‑16 H536 3 3 10/01/2026 No
90-270.93 2026‑16 H536 4 4 10/01/2026 No
90-270.95 2026‑16 H536 5 5 10/01/2026 No
90-270.96 (a) 2026‑16 H536 6 6 10/01/2026 No
90-270.97 2026‑16 H536 7 7 10/01/2026 No
90-270.98 2026‑16 H536 8 8 10/01/2026 No
90-270.99 2026‑16 H536 9 9 10/01/2026 No
90-270.100 2026‑16 H536 10 10 10/01/2026 No
90-270.101 2026‑16 H536 11 11 10/01/2026 No
90-270.102 2026‑16 H536 12 12 10/01/2026 No
90-270.103 2026‑16 H536 13 13 10/01/2026 No
90-270.126 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-270.128 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-270.128 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-270.130 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-270.139 (e), (e1) 2025‑37 H67 3(a) 3 10/01/2025 Yes
90-270.140 2025‑37 H67 3(d) 3.4 10/01/2025 Yes
90-270.145 (b)(3) 2025‑37 H67 3(b) 3 10/01/2025 Yes
90-270.153 (a), (h), (i) 2025‑37 H67 3(c) 2 10/01/2025 Yes
90-270.169 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-270.170 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-270.170 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-270.172 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-270.200 Art 18J 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.201 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.202 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.203 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.204 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.205 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.206 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.207 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.208 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.209 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.210 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.211 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-270.212 2025‑37 H67 4(a) 4 04/01/2026 Yes
90-308 2025‑94 H926 9.1(a) 9.1 10/01/2025 Yes
90-312.8 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-312.10 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
90-312.10 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-312.12 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-333 (h) 2026‑40 S1041 4.16 4.9 10/01/2026 No
90-352 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
90-352 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
90-354 (a)(1) 2025‑92 H358 2.11(c) 2.11 09/30/2025 Yes
90-356 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
90-357.5 (a)(1), (c)(1) 2025‑92 H358 2.11(d) 2.11 09/30/2025 Yes
90-359 2025‑92 H358 2.11(e) 2.11 09/30/2025 Yes
90-414.4 2025‑25 H40 39.1(c) 39.1 06/26/2025 Yes
90-414.4 2026‑38 H1104 12(a) 12 07/06/2026 No
90-414.8 (a) 2026‑38 H1104 12(b) 12 07/06/2026 No
90-631 (b) 2025‑56 S125 2(c) 2 07/03/2025 Yes
90-631 (b) 2025‑92 H358 2.11(f) 2.11 09/30/2025 Yes
90-632.11 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
90-689 2026‑41 S257 9L.1(c) 9L.1 10/01/2026 No
90A-30 2025‑25 H40 24(c) 24 06/26/2025 Yes
90A-53 2025‑25 H40 10 10 06/26/2025 Yes
90A-72 (a) 2026‑32 H376 6(a) 6 01/01/2027 No
90A-77 (a)(3b)d. 2026‑32 H376 6(b) 6 01/01/2027 No
90A-78 (a)(4) 2026‑32 H376 6(c) 6 01/01/2027 No
90B-1 Chapter, title 1 2025‑7 H231 1(b) 1.1 10/01/2025 Yes
90B-1 Art. 1 2 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-1 3 2025‑7 H231 1(c) 1.2 10/01/2025 Yes
90B-2 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-3 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-4 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-5 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-5 (e) 2026‑40 S1041 4.17 4.9 10/01/2026 No
90B-6 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-6.1 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-6.2 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-7 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-8 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-9 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-9.1 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-10 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-11 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-12 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-13 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-14 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-15 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-16 2025‑7 H231 1(a) 1 10/01/2025 Yes
90B-20 Art. 2 2025‑7 H231 2 2 10/01/2025 Yes
90B-21 2025‑7 H231 2 2 10/01/2025 Yes
90B-22 2025‑7 H231 2 2 10/01/2025 Yes
90B-23 2025‑7 H231 2 2 10/01/2025 Yes
90B-24 2025‑7 H231 2 2 10/01/2025 Yes
90B-25 2025‑7 H231 2 2 10/01/2025 Yes
90B-26 2025‑7 H231 2 2 10/01/2025 Yes
90B-27 2025‑7 H231 2 2 10/01/2025 Yes
90B-28 2025‑7 H231 2 2 10/01/2025 Yes
90B-29 2025‑7 H231 2 2 10/01/2025 Yes
90B-30 2025‑7 H231 2 2 10/01/2025 Yes
90B-31 2025‑7 H231 2 2 10/01/2025 Yes
90B-32 2025‑7 H231 2 2 10/01/2025 Yes
90B-33 2025‑7 H231 2 2 10/01/2025 Yes
90B-34 2025‑7 H231 2 2 10/01/2025 Yes
90B-35 2025‑7 H231 2 2 10/01/2025 Yes
90D-7 (c) 2026‑41 S257 20.2(d) 20.2 07/07/2026 No
93-12 (5) 2025‑35 S321 1(a) 1 01/01/2026 Yes
93A-3 2026‑41 S257 5.10(n) 5.91.991 07/07/2026 No
93A-4 (a2) 2025‑56 S125 2(d) 2 07/03/2025 Yes
93A-4 (a2) 2025‑92 H358 2.11(g) 2.11 09/30/2025 Yes
93A-4 (b1) 2026‑41 S257 20.2(j) 20.2E 07/07/2026 No
93A-38.5 (e) 2025‑56 S125 2(e) 2 07/03/2025 Yes
93A-38.5 (e) 2025‑92 H358 2.11(h) 2.11 09/30/2025 Yes
93A-51 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
93A-61 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
93A-62 (d), (e) 2025‑75 H992 1 1 12/01/2025 Yes
93A-62.1 2025‑75 H992 2 2 12/01/2025 Yes
93A-67 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
93B-2 (f) 2025‑61 H763 1(b) 1 10/01/2025 Yes
93B-8.1 (d) 2025‑51 S710 3(c) 3 10/01/2025 Yes
93B-14 2025‑94 H926 27 27 10/06/2025 Yes
93B-15.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
93B-15.3 2025‑61 H763 1(a) 1.5 10/01/2025 Yes
93B-15.3 2026‑48 S857 69(a) 69 See Bill No
93D-7.1 2025‑94 H926 9(a) 9 10/01/2025 Yes
93D-14 (b), (c) 2025‑94 H926 8(a) 8 10/06/2025 Yes
93E-1-4 (5a), (5b), (9a) 2025‑52 S690 1(a) 1 01/01/2026 Yes
93E-1-6 (a1) 2025‑52 S690 1(b) 1 01/01/2026 Yes
93E-1-6 (a1) 2025‑52 S690 1(c) 1 12/31/2030 Yes
93E-1-7 (b2) 2025‑56 S125 2(f) 2 07/03/2025 Yes
93E-1-7 (b2) 2025‑92 H358 2.11(i) 2.11 09/30/2025 Yes
93E-1-8 (b), (d) 2025‑56 S125 2(g) 2 07/03/2025 Yes
93E-1-8 (b), (d) 2025‑92 H358 2.11(j) 2.11 09/30/2025 Yes
93E-1-10 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
93E-2-3 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
95-4 (7) 2025‑92 H358 4.1(g) 4.1 09/30/2025 Yes
95-9 2025‑28 H568 2.1 2.1 06/27/2025 Yes
95-13 2025‑92 H358 4.1(a) 4.1 09/30/2025 Yes
95-14.2 2026‑41 S257 13.2(a) 13.2 07/07/2026 No
95-25.1 2026‑41 S257 39.7(b) 39.7A 10/01/2026 No
95-25.5 (n) 2025‑56 S125 2(h) 2 07/03/2025 Yes
95-25.5 (o) 2026‑49 S648 1(b) 1 10/01/2026 No
95-25.15 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-25.18 2025‑92 H358 4.1(b) 4.1 09/30/2025 Yes
95-25.23A 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-36.3 (c) 2025‑28 H568 1.5 1.5 06/27/2025 Yes
95-47.2 (d)(2a) 2026‑41 S257 20.2(k) 20.2F 07/07/2026 No
95-47.9 (e) 2025‑92 H358 4.1(c) 4.1 09/30/2025 Yes
95-69.17 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-79 2026‑41 S257 39.7(a) 39.7 10/01/2026 No
95-107 2025‑63 H559 1(a) 1 07/07/2025 Yes
95-108 2025‑63 H559 1(b) 1 07/07/2025 Yes
95-110.2 2025‑28 H568 1.6(a) 1.6 06/27/2025 Yes
95-110.3 2025‑28 H568 1.6(b) 1.6 06/27/2025 Yes
95-110.4 2025‑28 H568 1.6(c) 1.6 06/27/2025 Yes
95-110.5 2025‑28 H568 1.6(d) 1.6 06/27/2025 Yes
95-110.5 (20) 2025‑63 H559 1(c) 1 07/07/2025 Yes
95-110.5A 2025‑63 H559 1(d) 1 07/07/2025 Yes
95-110.6 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-110.9 (b) 2025‑28 H568 1.6(e) 1.6 06/27/2025 Yes
95-110.10 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-110.12 2025‑92 H358 4.1(d) 4.1 09/30/2025 Yes
95-111.3 (6) 2025‑28 H568 1.7(a) 1.7 06/27/2025 Yes
95-111.4 2025‑28 H568 1.7(b) 1.7 06/27/2025 Yes
95-111.4 (19) 2025‑63 H559 1(e) 1 07/07/2025 Yes
95-111.4A 2025‑63 H559 1(f) 1 07/07/2025 Yes
95-111.6 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-111.10 (b) 2025‑28 H568 1.7(c) 1.7 06/27/2025 Yes
95-111.13 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-111.15 2025‑92 H358 4.1(e) 4.1 09/30/2025 Yes
95-120 (9) 2025‑63 H559 1(g) 1 07/07/2025 Yes
95-120.2 2025‑63 H559 1(h) 1 07/07/2025 Yes
95-123 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-125.2 (b) 2025‑28 H568 1.8 1.8 06/27/2025 Yes
95-125.3 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-127 (3) 2026‑40 S1041 4.18 4.9 10/01/2026 No
95-135 (d) 2025‑28 H568 1.3(a) 1.3 06/27/2025 Yes
95-136.2 2025‑28 H568 1 1 06/27/2025 Yes
95-137 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-142 2025‑92 H358 4.1(f) 4.1 09/30/2025 Yes
95-234 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
95-242 2026‑13 H258 1 1 06/22/2026 No
95-246 2026‑13 H258 2 2 06/22/2026 No
95-260 2025‑71 S311 3(a) 3 07/09/2025 Yes
95-261 2025‑71 S311 3(a) 3 07/09/2025 Yes
95-262 2025‑71 S311 3(a) 3 07/09/2025 Yes
95-264 2025‑71 S311 3(a) 3 07/09/2025 Yes
95-266 2025‑71 S311 3(a) 3 07/09/2025 Yes
95-271 2025‑71 S311 3(a) 3 07/09/2025 Yes
95-280 Art. 24 2026‑41 S257 13.3(a) 13.3 01/01/2027 No
95-281 2026‑41 S257 13.3(a) 13.4 01/01/2027 No
95-282 2026‑41 S257 13.3(a) 13.5 01/01/2027 No
95-283 2026‑41 S257 13.3(a) 13.6 01/01/2027 No
95-284 2026‑41 S257 13.3(a) 13.7 01/01/2027 No
95-285 2026‑41 S257 13.3(a) 13.8 01/01/2027 No
95-286 2026‑41 S257 13.3(a) 13.9 01/01/2027 No
96-4 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
97-25.6 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
97-29 (a) 2026‑14 H315 2(a) 2 07/01/2027 No
97-31 2026‑14 H315 2(b) 2 07/01/2027 No
97-77 2026‑41 S257 5.10(p) 5.91.993 07/07/2026 No
97-77 (b) 2026‑40 S1041 4.19 4.9 10/01/2026 No
97-86 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
99A-2 (e) 2026‑40 S1041 4.20 4.9 10/01/2026 No
99C-1 2026‑49 S648 1(a) 1 10/01/2026 No
99C-2 2026‑49 S648 1(a) 1 10/01/2026 No
99C-3 2026‑49 S648 1(a) 1 10/01/2026 No
99C-4 2026‑49 S648 1(a) 1 10/01/2026 No
99C-5 2026‑49 S648 1(a) 1 10/01/2026 No
99C-6 2026‑49 S648 1(a) 1 10/01/2026 No
99C-7 2026‑49 S648 1(a) 1 10/01/2026 No
99C-8 2026‑49 S648 1(a) 1 10/01/2026 No
99C-9 2026‑49 S648 1(a) 1 10/01/2026 No
99C-10 2026‑49 S648 1(a) 1 10/01/2026 No
99C-11 2026‑49 S648 1(a) 1 10/01/2026 No
99C-12 2026‑49 S648 1(a) 1 10/01/2026 No
99C-13 2026‑49 S648 1(a) 1 10/01/2026 No
99C-14 2026‑49 S648 1(a) 1 10/01/2026 No
99E-90 Art. 10 2025‑94 H926 26(a) 26 10/06/2025 Yes
101-2 2025‑54 H620 4(a) 4 12/01/2025 Yes
102-1.1 2025‑51 S710 7 7 07/02/2025 Yes
104E-24 2025‑25 H40 24(d) 24 06/26/2025 Yes
105-113.4 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-113.4 2026‑41 S257 44.6(a1) 44.6 07/01/2027 No
105-113.4 (10b) 2026‑31 S595 4.11(a) 4.11 07/01/2026 No
105-113.4B (a2) 2026‑41 S257 44.6(d5) 44.6I 07/07/2026 No
105-113.4F 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
105-113.4I 2026‑41 S257 44.6(a2) 44.6A 07/01/2027 No
105-113.36A (a)(2a) 2026‑31 S595 4.11(b) 4.11 07/01/2026 No
105-113.39A 2026‑31 S595 4.12 4.12 07/02/2026 No
105-113.39A 2026‑41 S257 44.6(a3) 44.6B 07/01/2027 No
105-113.39A (a2) 2026‑31 S595 4.1 4.1 07/02/2026 No
105-113.83 (a1) 2026‑31 S595 4.13 4.13 07/02/2026 No
105-113.83A (a) 2026‑31 S595 4.14 4.14 07/02/2026 No
105-113.83A (a)(12) 2026‑31 S595 4.2 4.2 07/02/2026 No
105-113.84 catch line, (a) 2026‑31 S595 4.15(a) 4.15 07/01/2026 No
105-113.126 (a) 2026‑41 S257 44.7(a) 44.7 07/07/2026 No
105-113.128 2026‑41 S257 44.7(b) 44.7B 07/01/2026 No
105-113.128 (5) 2026‑41 S257 44.7(c) 44.7C 07/01/2027 No
105-113.130 Art. 2F 2026‑41 S257 44.9(a) 44.9 01/01/2027 No
105-113.131 2026‑41 S257 44.9(a) 44.9A 01/01/2027 No
105-114.1 (d) 2026‑31 S595 8.1 8.1 07/02/2026 No
105-120.2 (b) 2026‑31 S595 8.2(b) 8.2 07/02/2026 No
105-122 (b) 2026‑31 S595 8.4(a) 8.4 01/01/2019 No
105-122 (b)(2a) 2026‑31 S595 8.7(a) 8.7 01/01/2021 No
105-122 (d2) 2026‑31 S595 8.2(a) 8.2 07/02/2026 No
105-129.71 (a2) 2026‑31 S595 8.5(a) 8.5 01/01/2026 No
105-130.4A 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-130.5 2026‑31 S595 2(d) 2 01/01/2026 No
105-130.5 2026‑31 S595 12(c) 12 07/02/2026 No
105-130.5 (b)(31a) 2026‑31 S595 8.6(a) 8.6 01/01/2026 No
105-130.5C 2026‑31 S595 12(b) 12 07/02/2026 No
105-130.9 (4) 2025‑4 H74 9.1(b) 9.1 01/01/2025 Yes
105-130.9 (4) 2026‑11 S401 24(b) 24 06/22/2026 No
105-130.34 2025‑4 H74 9.1(a) 9.1 01/01/2025 Yes
105-130.34A 2025‑4 H74 9.1(a) 9.1 01/01/2025 Yes
105-130.34A 2026‑11 S401 24(b) 24 06/22/2026 No
105-130.34A 2026‑31 S595 1.5(a) 1.5 07/02/2026 No
105-131.1 (b) 2026‑31 S595 8.3 8.3 07/02/2026 No
105-153.5 2026‑31 S595 1.8(a) 1.8 01/01/2026 No
105-153.5 2026‑31 S595 12(e) 12 07/02/2026 No
105-153.5 (a) 2026‑41 S257 44.2(a) 44.2 01/01/2025 No
105-153.5 (a)(2)a. 2025‑4 H74 9.1(d) 9.1 01/01/2025 Yes
105-153.5 (a)(2)a. 2026‑11 S401 24(b) 24 06/22/2026 No
105-153.5 (b)(17) 2026‑31 S595 1.6 1.6 07/02/2026 No
105-153.5 (c1) 2026‑31 S595 1.1(a) 1.1 01/01/2026 No
105-153.5 (c2) 2026‑31 S595 2(c) 2 01/01/2026 No
105-153.5A (a) 2026‑31 S595 1.2(b) 1.2 01/01/2026 No
105-153.5A (g) 2026‑31 S595 1.2(a) 1.2 07/02/2026 No
105-153.6A 2026‑31 S595 12(d) 12 07/02/2026 No
105-153.7 2026‑41 S257 44.1(a) 44.1 07/07/2026 No
105-153.8A 2025‑60 S600 2(a) 2 01/01/2027 Yes
105-153.11 2025‑4 H74 9.1(c) 9.1 01/01/2025 Yes
105-153.11 2026‑11 S401 24(a) 24 06/22/2026 No
105-153.11 2026‑11 S401 24(b) 24 06/22/2026 No
105-153.11 2026‑31 S595 1.5(b) 1.5 07/02/2026 No
105-154.1 (c) 2026‑31 S595 1.9(a) 1.9 01/01/2026 No
105-154.2 2026‑31 S595 2(a) 2 01/01/2026 No
105-157 (a) 2026‑31 S595 1.10 1.10 07/02/2026 No
105-160.2 2026‑31 S595 1.3(a) 1.3 01/01/2026 No
105-163.2C 2026‑31 S595 16(a) 16 01/01/2027 No
105-163.6 2026‑31 S595 1.4 1.4 07/02/2026 No
105-163.15 (f) 2026‑31 S595 1.11 1.11 07/02/2026 No
105-164.3 2025‑25 H40 29(4) 29 06/26/2025 Yes
105-164.3 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-164.3 (218) 2026‑31 S595 3.4(a) 3.4 07/02/2026 No
105-164.3 (259) 2026‑31 S595 3.2 3.2 07/02/2026 No
105-164.8 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-164.8 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
105-164.8 (b) 2026‑31 S595 3.1(a) 3.1 07/02/2026 No
105-164.10 2026‑31 S595 14(f) 14 07/02/2026 No
105-164.11 2026‑31 S595 14(g) 14 07/02/2026 No
105-164.13 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-164.13 2026‑41 S257 44.4(a) 44.4 07/07/2026 No
105-164.13 2026‑42 H56 11.3(c) 9.1H 07/07/2026 No
105-164.13 (5m) 2026‑31 S595 3.4(b) 3.4 07/02/2026 No
105-164.13 (74) 2025‑58 H357 3 3 12/01/2025 Yes
105-164.13B (a)(4)b. 2026‑31 S595 3.4(c) 3.4 07/02/2026 No
105-164.14 (b) 2026‑41 S257 44.3(a) 44.3 07/07/2026 No
105-164.14 (b) 2026‑42 H56 11.2(a) 9.1D 07/07/2026 No
105-164.14 (c)(15) 2025‑39 H948 8.2 8.2 07/01/2025 Yes
105-164.16 (b2) 2026‑31 S595 3.5 3.5 07/02/2026 No
105-164.28 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-164.44K (a) 2026‑42 H56 11.3(b) 9.1F 07/07/2026 No
105-187.1 (a) 2026‑31 S595 7.1(a) 7.1 10/01/2026 No
105-187.1 (a)(6) 2026‑46 H1094 32.5(a) 32.5 10/01/2026 No
105-187.3 (a) 2026‑31 S595 7.1(b) 7.1 10/01/2026 No
105-187.4 (a) 2026‑31 S595 7.1(c) 7.1 10/01/2026 No
105-187.5 2026‑31 S595 7.1(d) 7.1 10/01/2026 No
105-187.19 (a) 2026‑41 S257 36.2 36.2 07/01/2026 No
105-187.19 (b) 2025‑66 S706 1(a) 1 10/01/2025 Yes
105-187.19 (b) 2026‑41 S257 12.15(a) 12.94 07/01/2026 No
105-187.24 2026‑41 S257 36.1 36.1 07/01/2026 No
105-187.90 (9) 2026‑31 S595 3.3(a) 3.3 07/02/2026 No
105-187.95 2026‑31 S595 3.3(b) 3.3 07/02/2026 No
105-228.4A (a), (b) 2026‑41 S257 44.5(e) 44.5E 01/01/2027 No
105-228.5 2026‑41 S257 44.5(b) 44.5B 01/01/2027 No
105-228.5C 2025‑89 H125 2B.12(a) 2 07/01/2025 Yes
105-228.8 (e) 2026‑41 S257 44.5(f) 44.5F 01/01/2027 No
105-228.90 2026‑31 S595 5.1 5.1 07/02/2026 No
105-228.90 (b) 2026‑31 S595 2(b) 2 01/01/2026 No
105-228.90 (b)(7) 2026‑31 S595 12(a) 12 07/02/2026 No
105-236 (a) 2026‑31 S595 5.2 5.2 07/02/2026 No
105-241.01 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
105-241.6 (b)(7) 2026‑31 S595 2(e) 2 01/01/2026 No
105-241.8 (b)(6) 2026‑31 S595 2(f) 2 01/01/2026 No
105-249.2 catch line, (b) 2026‑31 S595 5.3 5.3 07/02/2026 No
105-251.2 (c1) 2026‑31 S595 5.4 5.4 07/02/2026 No
105-251.2 (c1) 2026‑42 H56 11.3(a) 9.1E 07/07/2026 No
105-259 2026‑31 S595 5.5 5.5 07/02/2026 No
105-259 (b)(39a) 2026‑50 H1126 4.1(h) 4.1 01/01/2027 No
105-259 (b)(56), (57) 2025‑60 S600 2(b) 2 01/01/2027 Yes
105-262.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-262.1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
105-264.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
105-269.8 2025‑27 H576 4.6 4.6 06/27/2025 Yes
105-269.14 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
105-274.1 2026‑31 S595 6.3 6.3 07/02/2026 No
105-277.02 (e) 2026‑12 S695 2 2 07/01/2027 No
105-277.03 2026‑12 S695 1 1 07/01/2027 No
105-277.2 (4)c. 2026‑41 S257 44.10(a) 44.9B 01/01/2026 No
105-277.4 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
105-277.13 2025‑53 S387 1 1 07/01/2025 Yes
105-278.2 2026‑31 S595 6.1 6.1 07/02/2026 No
105-282.1 (a)(2)c. 2026‑12 S695 3 3 07/01/2027 No
105-291 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
105-294 2026‑8 S889 2 2 10/01/2026 No
105-317.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
105-330.4 (a) 2026‑41 S257 43.10(ii) 43.96 10/01/2026 No
105-330.5 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
105-357 2026‑31 S595 14(j) 14 07/02/2026 No
105-361 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
105-449.37 (a)(1) 2026‑31 S595 4.16 4.16 07/02/2026 No
105-449.42 2026‑31 S595 4.3(a) 4.3 07/02/2026 No
105-449.60 (12) 1 2026‑31 S595 4.4(b) 4.4 07/02/2026 No
105-449.60 (43a) 2 2026‑31 S595 4.4(a) 4.4 07/02/2026 No
105-449.60 (46)e. 3 2026‑31 S595 4.5(a) 4.5 07/02/2026 No
105-449.69 (e) 2026‑31 S595 4.6(a) 4.6 07/02/2026 No
105-449.72 (a)(1)f. 2026‑31 S595 4.5(c) 4.5 07/02/2026 No
105-449.76 (a) 2026‑31 S595 4.6(b) 4.6 07/02/2026 No
105-449.87 (a)(3) 2026‑31 S595 4.7 4.7 07/02/2026 No
105-449.97 (e) 2026‑31 S595 4.5(b) 4.5 07/02/2026 No
105-449.139 (d) 2026‑31 S595 4.8 4.8 07/02/2026 No
105-506.1 (3), (4) 2025‑39 H948 2.1 2.1 07/01/2025 Yes
105-506.3 Local Modification 2026‑41 S257 44.11(c) 44.9G 07/07/2026 No
105-507.2 2025‑39 H948 2.2 2.2 07/01/2025 Yes
105-507.3 1 2025‑39 H948 2.4 2.4 See Bill Yes
105-507.3 (b) 2 2025‑39 H948 2.3 2.3 07/01/2025 Yes
105-513.1 Art. 43A Local Modification 2026‑41 S257 44.11(b) 44.9C 07/07/2026 No
105-513.2 Local Modification 2026‑41 S257 44.11(b) 44.9D 07/07/2026 No
105-513.3 Local Modification 2026‑41 S257 44.11(b) 44.9E 07/07/2026 No
105-513.4 Local Modification 2026‑41 S257 44.11(b) 44.9F 07/07/2026 No
105-537 Local Modification 2025‑87 H305 2(b) 2 07/31/2025 Yes
105-537 Local Modification 2026‑26 S1074 3(b) 3 07/02/2026 No
105-538 Local Modification 2025‑87 H305 2(c) 2 07/31/2025 Yes
105-538 Local Modification 2026‑26 S1074 3(c) 3 07/02/2026 No
105-550 2026‑31 S595 7.2(c) 7.2 10/01/2026 No
105-551 (a) 2026‑31 S595 7.2(d) 7.2 10/01/2026 No
105-552 2026‑31 S595 7.2(e) 7.2 10/01/2026 No
105A-1 Art. 1 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-1 Chapter title 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-2 (5) 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-2 (6) 2025‑94 H926 28 28 10/06/2025 Yes
105A-2 (7) 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-3 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-4 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-5 (a), (e) 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-6.1 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-6.2 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-6.3 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-6.4 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-8 catch line 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-8.1 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-9 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-13 (a), (a1), (c) 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-14 2025‑83 H549 11(a) 11 12/01/2025 Yes
105A-14.1 2025‑83 H549 11(a) 11 12/01/2025 Yes
106-2 2026‑41 S257 5.10(m) 5.91.99 07/07/2026 No
106-202.16 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
106-568.43 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
106-568.45 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
106-581.1 (8) 2026‑11 S401 17 17 06/22/2026 No
106-740 2025‑12 H126 1 1 10/01/2025 Yes
106-758 2026‑11 S401 20(a) 20 06/22/2026 No
106-761 (b) 2026‑11 S401 20(b) 20 06/22/2026 No
106-803 (a2) 2026‑11 S401 5(a) 5 06/22/2026 No
106-942 2026‑11 S401 10 10 06/22/2026 No
106-1055 Art. 86 2026‑11 S401 22 22 06/22/2026 No
106-1056 2026‑11 S401 22 22 06/22/2026 No
106-1057 2026‑11 S401 22 22 06/22/2026 No
106-1058 2026‑11 S401 22 22 06/22/2026 No
106-1059 2026‑11 S401 22 22 06/22/2026 No
108A-15.25 Art. 1, Part 2C 2026‑41 S257 9J.15(b) 9J.15 10/01/2026 No
108A-15.26 2026‑41 S257 9J.15(b) 9J.15 10/01/2026 No
108A-15.27 2026‑41 S257 9J.15(b) 9J.15 10/01/2026 No
108A-15.28 2026‑41 S257 9J.15(b) 9J.15 10/01/2026 No
108A-24 2025‑16 H612 2.2(a) 2.2 10/01/2025 Yes
108A-27.8 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
108A-40 2025‑25 H40 28(b) 28 01/01/2023 Yes
108A-41 2025‑25 H40 28(b) 28 01/01/2023 Yes
108A-42.1 2025‑25 H40 27(b) 27 01/01/2023 Yes
108A-42.1 2025‑25 H40 28(c) 28 01/01/2023 Yes
108A-42.1 2025‑25 H40 28(b) 28 01/01/2023 Yes
108A-42.1 2025‑25 H40 27(a) 27 01/01/2023 Yes
108A-47.1 2025‑25 H40 28(b) 28 01/01/2023 Yes
108A-50.3 2025‑16 H612 2.1 2.1 10/01/2025 Yes
108A-50.4 2025‑16 H612 2.1 2.1 10/01/2025 Yes
108A-50.5 2025‑16 H612 2.1 2.1 10/01/2025 Yes
108A-50.6 2025‑16 H612 2.1 2.1 10/01/2025 Yes
108A-50.7 2025‑16 H612 2.1 2.1 10/01/2025 Yes
108A-50.8 2025‑16 H612 2.1 2.1 10/01/2025 Yes
108A-50.9 2025‑16 H612 2.1 2.1 10/01/2025 Yes
108A-50.10 Art. 2, Part 4A 2025‑16 H612 2.3 2.3 06/26/2025 Yes
108A-50.11 2025‑16 H612 2.3 2.3 06/26/2025 Yes
108A-50.12 2025‑16 H612 2.3 2.3 06/26/2025 Yes
108A-50.13 2025‑16 H612 2.4 2.4 06/26/2025 Yes
108A-52.1 2026‑1 H696 3F.1 3 4/30/2026 Yes
108A-52.2 2026‑41 S257 9J.14(a) 9J.14 10/01/2027 No
108A-54 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
108A-54.1A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
108A-54.1B 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
108A-54.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
108A-54.3A 2025‑64 H546 5.1(a) 5.1 07/07/2025 Yes
108A-54.3A (a)(25) 2026‑41 S257 9E.18(a) 9E.95 10/01/2026 No
108A-54.3A (c) 2026‑41 S257 9E.18(b) 9E.95 10/01/2026 No
108A-54.3A (a) 1 2026‑1 H696 3C.4(b) 3 10/01/2026 Yes
108A-54.3A (a)(24) 2 2026‑1 H696 3C.4(a) 3 4/30/2026 Yes
108A-55 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
108A-55.5 2026‑1 H696 3C.6(a) 3 10/01/2026 Yes
108A-55.5 2026‑41 S257 9E.20(a) 9E.97 10/01/2026 No
108A-55.6 2026‑1 H696 3C.7(a) 3 10/01/2026 Yes
108A-55.7 2026‑1 H696 3C.5(a) 3 01/01/2027 Yes
108A-55.8 2026‑1 H696 3C.8(a) 3 10/01/2026 Yes
108A-57 2025‑27 H576 2.4(a) 2.4 06/27/2025 Yes
108A-58.3 2026‑1 H696 3C.16(a) 3 07/01/2027 Yes
108A-58.3 2026‑41 S257 9E.19(a) 9E.96 07/01/2027 No
108A-58.3 2026‑42 H56 3.1(a) 3.1 07/07/2026 No
108A-58.3 2026‑42 H56 3.1(b) 3.1B 07/01/2027 No
108A-64.2 2026‑1 H696 3C.11 3 4/30/2026 Yes
108A-68.1A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
108A-70.9A (f) 2025‑25 H40 24(e) 24 06/26/2025 Yes
108A-70.9B (g) 2025‑25 H40 24(f) 24 06/26/2025 Yes
108A-74 (a5) 2025‑16 H612 1.17(b) 1.17 06/26/2025 Yes
108A-77.1 (7), (10) 2026‑41 S257 9J.10(a) 9J.10 07/07/2026 No
108A-77.4 (c) 2026‑41 S257 9J.10(b) 9J.10 07/07/2026 No
108A-80 2026‑1 H696 3C.9(a) 3 10/01/2026 Yes
108A-106.1 2025‑27 H576 5.1(a) 5.1 11/01/2025 Yes
108A-106.2 2025‑27 H576 5.1(a) 5.1 11/01/2025 Yes
108A-112 2026‑31 S595 13.1(a) 13.1 07/02/2026 No
108A-113 2026‑31 S595 13.1(b) 13.1 07/02/2026 No
108A-115 2026‑31 S595 13.1(c) 13.1 07/02/2026 No
108A-117.1 2026‑31 S595 13.1(d) 13.1 07/02/2026 No
108A-117.1 (k) 2026‑42 H56 3.3 3.3 07/01/2026 No
108A-117.2 2026‑31 S595 13.1(d) 13.1 07/02/2026 No
108A-118 Art. 6B 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.1 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.2 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.3 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.4 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.5 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.6 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.7 2025‑23 S400 1 1 10/01/2025 Yes
108A-118.8 2025‑23 S400 1 1 10/01/2025 Yes
108A-145.3 (6c), (6d), (6e) 2025‑64 H546 6.1(c) 6.1 10/01/2025 Yes
108A-145.3 (6d) 1 2026‑41 S257 44.5(g) 44.5G 01/01/2027 No
108A-145.3 (19) 2 2026‑41 S257 9E.8(a) 9E.8 07/01/2026 No
108A-145.3 (21) 3 2026‑41 S257 9E.8(b) 9E.8 07/01/2026 No
108A-146.1 2025‑64 H546 6.1(d) 6.1 10/01/2025 Yes
108A-146.1 2026‑1 H696 3D.2(a) 3 07/01/2026 Yes
108A-146.1A 2026‑1 H696 3D.2(b) 3 07/01/2026 Yes
108A-146.3 2025‑64 H546 6.1(e) 6.1 10/01/2025 Yes
108A-146.4 2025‑64 H546 6.1(f) 6.1 10/01/2025 Yes
108A-146.5 2025‑64 H546 5.1(b) 5.1 07/07/2025 Yes
108A-146.5 2026‑1 H696 3D.2(c) 3 07/01/2026 Yes
108A-146.5 2025‑64 H546 6.1(g) 6.1 10/01/2025 Yes
108A-146.10 2025‑64 H546 6.1(h) 6.1 10/01/2025 Yes
108A-146.10A 2025‑64 H546 6.1(i) 6.1 07/07/2025 Yes
108A-146.13 (c) 2025‑64 H546 6.1(j) 6.1 10/01/2025 Yes
108A-146.14 2026‑1 H696 3D.2(d) 3 07/01/2026 Yes
108A-146.14 2026‑1 H696 3D.2(e) 3 10/01/2026 Yes
108A-147.1 2025‑64 H546 6.1(k) 6.1 10/01/2025 Yes
108A-147.1 2026‑1 H696 3D.2(g) 3 07/01/2026 Yes
108A-147.1A 2026‑1 H696 3D.2(h) 3 07/01/2026 Yes
108A-147.2 2025‑64 H546 6.1(l) 6.1 10/01/2025 Yes
108A-147.2A 2025‑64 H546 6.1(m) 6.1 10/01/2025 Yes
108A-147.3 2025‑64 H546 6.1(n) 6.1 10/01/2025 Yes
108A-147.3 2026‑1 H696 3D.4(c) 3 07/01/2026 Yes
108A-147.3 (a) 2026‑1 H696 3D.2(i) 3 07/01/2026 Yes
108A-147.5 2025‑64 H546 6.1(o) 6.1 07/07/2025 Yes
108A-147.6 2025‑64 H546 6.1(p) 6.1 07/07/2025 Yes
108A-147.6A 2025‑64 H546 6.1(q) 6.1 07/07/2025 Yes
108A-147.7 2026‑1 H696 3D.4(a) 3 07/01/2026 Yes
108A-147.7A 2026‑1 H696 3D.4(b) 3 07/01/2026 Yes
108A-147.7A 2026‑1 H696 3D.7(e) 3 See Bill Yes
108A-147.7A 2026‑41 S257 9E.9(d) 9E.90 See Bill No
108A-147.7A (b) 2026‑41 S257 9E.9(a) 9E.9 01/01/2027 No
108A-147.7A (b), (c) 2026‑41 S257 9E.9(c) 9E.90 See Bill No
108A-147.9 2026‑1 H696 3D.4(d) 3 07/01/2026 Yes
108A-147.10 2026‑1 H696 3D.2(j) 3 07/01/2026 Yes
108A-147.10 2026‑1 H696 3D.2(k) 3 10/01/2026 Yes
108A-147.11 2025‑64 H546 6.1(r) 6.1 07/07/2025 Yes
108A-147.11 2026‑1 H696 3D.2(l) 3 07/01/2026 Yes
108A-147.11 (a)(2) 2025‑89 H125 2B.12(b) 2 07/01/2025 Yes
108A-147.13 2026‑1 H696 3D.4(e) 3 07/01/2026 Yes
108A-148.1 (a) 2025‑64 H546 6.1(a) 6.1 07/07/2025 Yes
108A-150 (g) 2025‑27 H576 5.2 5.2 06/27/2025 Yes
108C-2 2026‑1 H696 3C.13(a) 3 4/30/2026 Yes
108C-3 2025‑27 H576 2.3(a) 2.3 01/01/2023 Yes
108C-3 (c)(1a), (16), (e), (g) 2025‑27 H576 2.3(b) 2.3 01/01/2024 Yes
108C-5 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
108C-7 2026‑1 H696 3C.13(b) 3 4/30/2026 Yes
108C-9 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
108C-9 2026‑1 H696 3C.18(c) 3 4/30/2026 Yes
108D-1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
108D-16 2025‑25 H40 24(g) 24 06/26/2025 Yes
108D-22 2026‑1 H696 3C.12(a) 3 4/30/2026 Yes
108D-22 2026‑41 S257 9E.22(b) 9E.99 07/07/2026 No
108D-23 2026‑1 H696 3C.12(b) 3 4/30/2026 Yes
108D-24 2026‑1 H696 3C.12(c) 3 4/30/2026 Yes
108D-24 2026‑41 S257 9E.22(c) 9E.990 07/07/2026 No
108D-40 2026‑1 H696 3C.4(c) 3 10/1/2026 Yes
108D-40 (a)(9), (9a) 1 2025‑27 H576 2.2(a) 2.2 06/27/2025 Yes
108D-40 (a)(14) 2 2025‑64 H546 4.1(b) 4.1 07/07/2025 Yes
108D-65 2026‑1 H696 3C.15(a) 3 4/30/2026 Yes
108D-65 2026‑41 S257 9E.24(a) 9E.992 07/07/2026 No
108D-65 (a) 2026‑41 S257 9E.17(a) 9E.94 07/07/2026 No
110-45 Art. 3 2025‑25 H40 11 11 06/26/2025 Yes
110-46 2025‑25 H40 11 11 06/26/2025 Yes
110-47 2025‑25 H40 11 11 06/26/2025 Yes
110-48 2025‑25 H40 11 11 06/26/2025 Yes
110-86 (3) 1 2025‑36 H412 18(a) 18 07/01/2025 Yes
110-86 (5a) 2 2025‑36 H412 2 2 07/01/2025 Yes
110-90.2 (c) 2026‑41 S257 20.2(l) 20.2G 07/07/2026 No
110-91 (8) 2026‑41 S257 9D.10(a) 9D.50 07/01/2026 No
110-91 1 2025‑36 H412 5(a) 5 07/01/2025 Yes
110-91 (1) 1.5 2025‑37 H67 6.1(i) 6.1 See Bill Yes
110-91 (4), (5) 2 2025‑36 H412 18(b) 18 07/01/2025 Yes
110-91 (7)a. 3 2025‑36 H412 6 6 07/01/2025 Yes
110-91 (8) 4 2025‑36 H412 7(a) 7 07/01/2025 Yes
110-98.5 (3) 2025‑36 H412 14.2 14 07/01/2025 Yes
110-105.3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
110-106.3 2025‑36 H412 14 14 07/01/2025 Yes
110-130 2025‑25 H40 12 12 06/26/2025 Yes
110-139 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
113-129 (7c) 2026‑43 H747 5 5 10/01/2026 No
113-136 2025‑ S50 16 16 12/01/2025 Vetoed No
113-173.1 (a) 2026‑50 H1126 3.1(g) 3.1 07/07/2026 No
113-175.1 (b) 2026‑50 H1126 3.1(h) 3.1 07/07/2026 No
113-175.5 (b) 2026‑50 H1126 3.1(i) 3.1 07/07/2026 No
113-187 (f) 2026‑11 S401 15(a) 15 12/01/2026 No
113-202 (g) 2026‑11 S401 21(b) 21 06/22/2026 No
113-217 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
113-218 2026‑11 S401 16(b) 16 12/01/2026 No
113-221 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
113-229 (n)(3) 2025‑48 S472 3(c) 3 07/02/2025 Yes
113-269 2026‑11 S401 16(c) 16 12/01/2026 No
113-281 Art. 21A 2025‑97 S449 4.5(a) 4.5 10/22/2025 Yes
113-282 2025‑97 S449 4.5(a) 4.51 10/22/2025 Yes
113-283 2025‑97 S449 4.5(a) 4.52 10/22/2025 Yes
113-284 2025‑97 S449 4.5(a) 4.53 10/22/2025 Yes
113-285 2025‑97 S449 4.5(a) 4.54 10/22/2025 Yes
113-286 2025‑97 S449 4.5(a) 4.55 10/22/2025 Yes
113-287 2025‑97 S449 4.5(a) 4.56 10/22/2025 Yes
113-291.8 2026‑43 H747 6 6 10/01/2026 No
113-315.36 2026‑41 S257 22.5(c) 22.5 07/01/2026 No
113-333 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
113-391 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
113-391.1 (e) 2025‑54 H620 14(c) 14 12/01/2025 Yes
113-423 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
113-425 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
113A-103 (8a) 2025‑48 S472 3(a) 3 07/02/2025 Yes
113A-113 (b)(2), (5), (b1) 2025‑48 S472 3(b) 3 07/02/2025 Yes
113A-129.2 2026‑41 S257 12.21 12.21 07/01/2026 No
113A-129.10 Art. 7, Part 5A 2025‑48 S472 2 2 07/02/2025 Yes
113A-129.11 2025‑48 S472 2 2 07/02/2025 Yes
113A-129.12 2025‑48 S472 2 2 07/02/2025 Yes
114-2.2 2026‑41 S257 16.20(r) 16.999Q 07/01/2027 No
114-2.4 2026‑41 S257 16.20(s) 16.999R 07/01/2027 No
114-4 2026‑40 S1041 4.21 4.9 10/01/2026 No
114-4.2B 2026‑40 S1041 4.22 4.9 10/01/2026 No
114-4.2C 2026‑40 S1041 4.23 4.9 10/01/2026 No
114-8.7 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
114-8.7 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
114-9.4 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
114-9.7 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115-218.110 (b) 2026‑41 S257 7.7(n) 7.795 07/01/2026 No
115B-1 2026‑44 S355 1.1(a) 1.1 07/07/2026 No
115B-2 (a) 2026‑44 S355 1.1(b) 1.1 07/07/2026 No
115B-2 (a)(6) 2026‑41 S257 7.31(c) 7.99993 07/01/2026 No
115B-5 (b) 2026‑44 S355 1.1(c) 1.1 07/07/2026 No
115C-5 (3a), (7a) 2026‑41 S257 7.31(d) 7.99994 07/01/2026 No
115C-10.1 2026‑41 S257 7.61(a) 7.9N 07/07/2026 No
115C-11 (d) 2026‑41 S257 7.4(c) 7.42 07/01/2026 No
115C-11 (e) 2026‑41 S257 7.4(d) 7.43 07/01/2026 No
115C-12 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-12 (9)b. 1 2026‑41 S257 7.4(e) 7.44 07/01/2026 No
115C-12 (18)f. 2 2025‑20 H91 2.8 2.8 06/26/2025 Yes
115C-12 (9c)c. 2 2026‑41 S257 7.4(f) 7.45 07/01/2026 No
115C-12 (50) 3 2025‑46 H378 1.1(c) 1.1 07/01/2025 Yes
115C-12 (9c)d. 3 2026‑20 S227 1 1 06/24/2026 No
115C-12 (18)d. 4 2026‑41 S257 7.4(g) 7.46 07/01/2026 No
115C-12 (22) 5 2026‑41 S257 7.7(i) 7.79 07/01/2026 No
115C-12 (25) 6 2026‑41 S257 7.7(a) 7.7 07/01/2026 No
115C-12 (28) 7 2026‑46 H1094 9(b) 9 10/01/2026 No
115C-12 (48) 8 2026‑41 S257 7.7(e) 7.75 07/01/2026 No
115C-21 (a) 2026‑41 S257 7.7(a1) 7.71 07/01/2026 No
115C-21 (a)(1) 2026‑40 S1041 4.24 4.9 10/01/2026 No
115C-31 (f) 2026‑41 S257 6.2(e) 6.23 07/01/2026 No
115C-37.1 (d) 2025‑3 H58 2.2(e) 2.4 12/07/2026 Yes
115C-37.1 (d) 2025‑13 H3 2(c) 2 12/04/2028 Yes
115C-37.1 (d) 2025‑13 H3 2.1(e) 2.1 12/07/2026 Yes
115C-37.1 (d) 2025‑32 H309 4.5 4.5 6/30/2025 Yes
115C-37.1 (d) Local Modification 2026‑25 S876 6(d) 6 12/04/2028 No
115C-47 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-47 2026‑41 S257 7.4(h) 7.47 07/01/2026 No
115C-47 (18) 2026‑20 S227 2.5(a) 2.5 06/24/2026 No
115C-47 (33b), (33c) 2025‑84 H805 3.2(a) 3.2 07/29/2025 Yes
115C-47 (33d) 2026‑41 S257 7.54(c) 7.9I2 07/07/2026 No
115C-47 (70), (71) 2025‑46 H378 1.1(d) 1.1 07/01/2025 Yes
115C-47 (72) 2025‑38 H959 1(b) 1 07/01/2025 Yes
115C-47 (73) 2026‑41 S257 7.33(a) 7.999998 07/07/2026 No
115C-47 (73) 2026‑41 S257 7.38(b) 7.9999999 07/07/2026 No
115C-47 (73) 2026‑41 S257 7.39(f) 7.99999996 07/01/2026 No
115C-64.25 Art. 6D 2026‑41 S257 7.55(a) 7.9J 07/07/2026 No
115C-64.26 2026‑41 S257 7.55(a) 7.9J 07/07/2026 No
115C-64.27 2026‑41 S257 7.55(a) 7.9J 07/07/2025 No
115C-64.28 2026‑41 S257 7.55(a) 7.9J 07/07/2025 No
115C-64.28 (b) 2026‑40 S1041 4.25 4.9 10/01/2026 No
115C-76.25 (a) 2026‑41 S257 7.4(i) 7.48 07/01/2026 No
115C-76.30 (a) 2026‑41 S257 7.4(j) 7.49 07/01/2026 No
115C-76.35 (b) 2026‑41 S257 7.4(k) 7.491 07/01/2026 No
115C-76.55 2026‑41 S257 7.4(l) 7.492 07/01/2026 No
115C-76.100 Art. 7B, Part 8 2025‑38 H959 3(a) 3 07/01/2025 Yes
115C-76.110 2025‑84 H805 3.4(a) 3.4 07/29/2025 Yes
115C-76.200 2026‑20 S227 2 2 06/24/2026 No
115C-76.205 2026‑20 S227 2 2 06/24/2026 No
115C-76.210 2026‑20 S227 2 2 06/24/2026 No
115C-81.5 (b)(3) 2026‑41 S257 7.4(m) 7.493 07/01/2026 No
115C-81.20 (g) 2026‑41 S257 7.52(b) 7.9G1 07/01/2026 No
115C-81.25 (b)(3) 2026‑41 S257 7.4(n) 7.494 07/01/2026 No
115C-81.25 (c) 2026‑41 S257 7.52(a) 7.9G 07/01/2026 No
115C-81.25 (d) 2026‑41 S257 7.4(o) 7.495 07/01/2026 No
115C-81.26 2025‑38 H959 2(a) 2 07/01/2025 Yes
115C-81.36 2026‑41 S257 7.9(a) 7.9 07/07/2026 No
115C-81.45 (d)(4) 2026‑41 S257 7.7(b) 7.72 07/01/2026 No
115C-81.90 (a1) 2026‑41 S257 7.39(a) 7.99999994 07/01/2026 No
115C-83.4B (b) 2026‑41 S257 7.27(a) 7.9998 07/01/2026 No
115C-83.6 2026‑41 S257 7.8(a) 7.8 07/01/2026 No
115C-83.6B (a) 2026‑41 S257 7.8(b) 7.81 07/01/2026 No
115C-83.9 (a) 2026‑41 S257 7.8(c) 7.82 07/01/2026 No
115C-83.10 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-83.10 (b) 2026‑41 S257 7.8(d) 7.83 07/01/2026 No
115C-83.15 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-83.15 2026‑41 S257 7.31(e) 7.99995 07/01/2026 No
115C-84.3 (a)(3) 2025‑56 S125 2(i) 2 07/03/2025 Yes
115C-85 Art. 8, Part 3, title 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-85.1 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-86 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-87 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-88 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-89 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-90 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-91 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-92 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-93 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-94 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-95 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-96 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-97 2026‑41 S257 7.4(a) 7.4 07/01/2026 No
115C-98 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-98.1 2025‑84 H805 3.3(a) 3.3 07/29/2025 Yes
115C-98.1 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-98.5 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-99 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-100 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-101 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-102 2026‑41 S257 7.4(b) 7.41 07/01/2026 No
115C-102.6D (b) 2026‑41 S257 5.5(f) 5.5 07/01/2026 No
115C-102.10 2025‑46 H378 1.1(a) 1.1 07/01/2025 Yes
115C-102.11 2025‑46 H378 1.1(a) 1.1 07/01/2025 Yes
115C-102.12 2025‑38 H959 1(a) 1 07/01/2025 Yes
115C-102.13 2026‑41 S257 7.39(e) 7.99999995 07/01/2026 No
115C-102.14 2026‑41 S257 7.39(l) 7.9A 07/01/2026 No
115C-105.25 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-105.25 (b)(12) 2026‑41 S257 7.4(p) 7.496 07/01/2026 No
115C-105.27 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-105.37 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-105.39A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-105.42A Art. 8B, Part 4 2026‑41 S257 7.36(a) 7.9999995 07/01/2026 No
115C-105.42D 2026‑41 S257 7.36(a) 7.9999995 07/01/2026 No
115C-105.42F 2026‑41 S257 7.36(a) 7.9999995 07/01/2026 No
115C-105-42H 2026‑41 S257 7.36(a) 7.9999995 07/01/2026 No
115C-105.53 (a) 2026‑41 S257 20.10.(a) 20.8C 07/01/2026 No
115C-105.54 (a) 2026‑41 S257 20.10(b) 20.8D 07/01/2026 No
115C-107.3 (a) 2026‑41 S257 7.7(p) 7.797 07/01/2026 No
115C-107.5 2026‑41 S257 7.7(o) 7.796 07/01/2026 No
115C-109.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-111.05 2026‑41 S257 7.57(a) 7.9K 07/01/2026 No
115C-111.2 2025‑40 S77 1 1 07/01/2025 Yes
115C-150.11 2026‑41 S257 7.62(a) 7.9O 07/01/2026 No
115C-150.12A (f) 2026‑41 S257 7.62(e) 7.9O 07/01/2026 No
115C-150.12B (a) 2026‑41 S257 7.62(f) 7.9O 07/01/2026 No
115C-150.12C (37), (38) 2025‑46 H378 1.1(e) 1.1 07/01/2025 Yes
115C-150.12C 1 2026‑46 H1094 9(c) 9 10/01/2026 No
115C-150.12C (3b) 2 2026‑41 S257 7.36(e) 7.9999996 07/01/2026 No
115C-150.12C (10), (20) 3 2026‑41 S257 7.4(q) 7.495 07/01/2026 No
115C-150.12C (15) 4 2026‑41 S257 7.32(b) 7.999995 07/01/2026 No
115C-150.12C (39) 5 2026‑41 S257 7.33(b) 7.999999 07/07/2026 No
115C-150.12C (39) 7 2026‑41 S257 7.38(c) 7.99999990 07/07/2026 No
115C-150.12C (39) 8 2026‑41 S257 7.39(g) 7.99999997 07/01/2026 No
115C-150.18 2026‑41 S257 7.63(a) 7.9P 07/01/2026 No
115C-173.20 Art. 10, Part 6 2026‑41 S257 7.28(a) 7.9999 07/01/2026 No
115C-173.21 2026‑41 S257 7.28(a) 7.9999 07/01/2026 No
115C-173.24 2026‑41 S257 7.28(a) 7.9999 07/01/2026 No
115C-174.11 (a) 2026‑41 S257 7.8(e) 7.84 07/01/2026 No
115C-174.12 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-218 (a1), (b)(10), (c)(2) 2025‑80 S254 1 1 07/29/2025 Yes
115C-218.8 (4) 2025‑80 S254 2 2 07/29/2025 Yes
115C-218.15 (c) 2025‑80 S254 3 3 07/29/2025 Yes
115C-218.30 (a), (a1) 2026‑41 S257 7.58 7.9L 07/01/2026 No
115C-218.33 2025‑46 H378 1.1(f) 1.1 07/01/2025 Yes
115C-218.33 (c) 2026‑41 S257 7.39(h) 7.99999998 07/01/2026 No
115C-218.42 (e) 2026‑41 S257 7.7(m) 7.794 07/01/2026 No
115C-218.65 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-218.70 2026‑46 H1094 9(b) 9 10/01/2026 No
115C-218.75 (a) 2025‑60 S600 4(c) 4 07/03/2025 Yes
115C-218.75 (l), (n)(3) 2026‑41 S257 7.20(c) 7.992 07/01/2026 No
115C-218.75 (n) 2026‑41 S257 7.20(b) 7.991 07/01/2026 No
115C-218.75 (p) 2026‑41 S257 7.33(c) 7.9999990 07/07/2026 No
115C-218.75 (p) 2026‑41 S257 7.38(d) 7.99999991 07/07/2026 No
115C-218.75 (p) 2026‑41 S257 7.54(d) 7.9I3 07/07/2026 No
115C-218.85 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-218.85 (b1) 2026‑41 S257 7.36(c) 7.9999996 07/01/2026 No
115C-218.85 (d) 2025‑80 S254 4 4 07/29/2025 Yes
115C-218.90 (a)(6) 2026‑40 S1041 4.26 4.9 10/01/2026 No
115C-218.90 (a)(7) 2025‑80 S254 5 5 07/29/2025 Yes
115C-218.94 (c) 2025‑80 S254 6 6 07/29/2025 Yes
115C-218.105 (a) 2026‑41 S257 7.59(a) 7.9M 07/07/2026 No
115C-218.105 (a)(3) 2026‑41 S257 7.57(b) 7.9K 07/01/2026 No
115C-218.105 (a2), (c2), (c3) 2025‑80 S254 7 7 07/29/2025 Yes
115C-218.106 2025‑80 S254 8 8 07/29/2025 Yes
115C-218.123 (c) 2025‑80 S254 9 9 07/29/2025 Yes
115C-218.125 2025‑80 S254 10 10 07/29/2025 Yes
115C-229.5 Art. 15A 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.10 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.15 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.20 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.25 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.30 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.35 1 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.35 (1)h. 2 2026‑41 S257 7.36(d) 7.9999996 07/01/2026 No
115C-229.35 (6) 3 2026‑41 S257 7.32(c) 7.999996 07/01/2026 No
115C-229.35 (25) 4 2026‑41 S257 7.33(d) 7.9999991 07/07/2026 No
115C-229.35 (25) 5 2026‑41 S257 7.38(e) 7.99999992 07/07/2026 No
115C-229.35 (25) 6 2026‑41 S257 7.39(i) 7.99999999 07/01/2026 No
115C-229.35 (25) 7 2026‑41 S257 7.54(e) 7.9I4 07/07/2026 No
115C-229.40 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.45 2026‑40 S1041 5.9(d) 5.9 10/01/2026 No
115C-229.45 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.45 (7) 2026‑40 S1041 5.9(b) 5.9 10/01/2026 No
115C-229.45 (7) 2026‑40 S1041 5.9(c) 5.9 10/01/2026 No
115C-229.50 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.55 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.55 (b)(2) 2026‑41 S257 7.57(c) 7.9K 07/01/2026 No
115C-229.60 2026‑41 S257 7.31(a) 7.99991 07/01/2026 No
115C-229.60 (e) 2026‑41 S257 7.20(d) 7.993 07/01/2026 No
115C-238.35 Art. 16, Part 7A 2026‑41 S257 7.23(a) 7.996 07/01/2027 No
115C-238.36 2026‑41 S257 7.23(a) 7.996 07/01/2027 No
115C-238.37 2026‑41 S257 7.23(a) 7.996 07/01/2027 No
115C-238.50A (1a), (3a) 2026‑41 S257 7.31(f) 7.99996 07/01/2026 No
115C-238.54A 2025‑92 H358 2.9(d) 2.9 09/30/2025 Yes
115C-238.54A 2025‑97 S449 2.1(a) 2.1 10/22/2025 Yes
115C-238.55 2025‑56 S125 2(j) 2 07/03/2025 Yes
115C-238.60 Art. 16, Part 10 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.61 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.62 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.63 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.64 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.65 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.66 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-238.66 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.66 (8) 2026‑46 H1094 9(b) 9 10/01/2026 No
115C-238.66 (7) 1 2025‑60 S600 4(d) 4 07/03/2025 Yes
115C-238.66 (18a), (18b) 2 2025‑46 H378 1.1(g) 1.1 07/01/2025 Yes
115C-238.67 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.68 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.68 (7), (8) 2026‑40 S1041 4.27 4.9 10/01/2026 No
115C-238.69 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-238.85 2025‑92 H358 2.11(k) 2.11 09/30/2025 Yes
115C-238.90 Art. 16, Part 12 2026‑41 S257 7.15 7.94 07/01/2026 No
115C-238.90 Art. 16, Part 12 2026‑41 S257 7.22 7.996 07/01/2026 No
115C-238.95 2026‑41 S257 7.16 7.95 07/01/2026 No
115C-239.70 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-239.71 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-239.72 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-239.73 2026‑41 S257 7.31(j) 7.999990 07/01/2026 No
115C-242 (3) 2026‑41 S257 7.4(r) 7.497 07/01/2026 No
115C-264 (a1) 2025‑89 H125 2A.8(a) 2 07/01/2025 Yes
115C-264 (e) 2026‑41 S257 7.20(a) 7.99 07/01/2026 No
115C-264.6 2026‑41 S257 7.21 7.995 07/01/2026 No
115C-268.1 (g) 2026‑40 S1041 4.28 4.9 10/01/2026 No
115C-269.1 Art. 17D title 2026‑41 S257 7.24(a) 7.997 07/01/2026 No
115C-269.1 Art. 17D, Part 1 2026‑41 S257 7.24(b) 7.998 07/01/2026 No
115C-269.5 2026‑41 S257 7.24(c) 7.999 07/01/2026 No
115C-269.15 (a) 2026‑41 S257 7.10(a) 7.91 07/01/2026 No
115C-269.31 Art. 17D, Part 2 2026‑41 S257 7.24(b) 7.998 07/01/2026 No
115C-269.32 2026‑41 S257 7.24(i) 7.9996 07/01/2026 No
115C-269.35 (b) 2026‑41 S257 7.24(h) 7.9995 07/01/2026 No
115C-269.45 (a)(3) 2026‑41 S257 7.24(e) 7.9992 07/01/2026 No
115C-269.50 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-269.50 2026‑41 S257 7.7(k) 7.792 07/01/2026 No
115C-269.55 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-269.55 (a) 2026‑41 S257 7.24(f) 7.9993 07/01/2026 No
115C-269.65 2026‑41 S257 7.24(g) 7.9994 07/01/2026 No
115C-269.67 2026‑41 S257 7.24(g) 7.9994 07/01/2026 No
115C-269.69 2026‑41 S257 7.24(g) 7.9994 07/01/2026 No
115C-269.75 2026‑41 S257 7.24(b) 7.998 07/01/2026 No
115C-270.1 2026‑41 S257 7.6(b) 7.61 07/07/2026 No
115C-270.1 (1b), (3a), (3b) 2025‑56 S125 3(a) 3 07/03/2025 Yes
115C-270.1 (1b), (3a), (3b) 2025‑38 H959 4(a) 4 07/01/2025 Yes
115C-270.1 (1b), (3a), (3b) 2025‑92 H358 2.6 2.6 09/30/2025 Yes
115C-270.15 2026‑41 S257 7.10(b) 7.92 07/01/2026 No
115C-270.20 (a)(5) 2025‑56 S125 3(b) 3 07/03/2025 Yes
115C-270.20 (a)(5) 2025‑38 H959 4(b) 4 07/01/2025 Yes
115C-270.20 (a)(5) 2025‑92 H358 2.6 2.6 09/30/2025 Yes
115C-270.20 (b) 2026‑41 S257 7.6(a) 7.6 07/07/2026 No
115C-270.25 2026‑41 S257 7.10(c) 7.93 07/07/2026 No
115C-270.30 (b2) 2026‑20 S227 3 3 06/24/2026 No
115C-271 (d)(2) 2026‑41 S257 7.4(s) 7.498 07/01/2026 No
115C-284 2025‑25 H40 13(a) 13 06/26/2025 Yes
115C-284 (e), (e1) 2026‑41 S257 7.6(c) 7.62 07/07/2026 No
115C-284.1 2026‑41 S257 7.6(d) 7.63 07/07/2026 No
115C-284.2 2026‑41 S257 7.25 7.9997 07/01/2026 No
115C-285.1 2026‑41 S257 7A.9(a) 7A.9 07/01/2026 No
115C-285.5 2026‑41 S257 7A.8 7A.8 07/01/2026 No
115C-288 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
115C-288 (k) 2026‑46 H1094 9(b) 9 10/01/2026 No
115C-289.2 (d) 2026‑41 S257 7.7(j) 7.791 07/01/2026 No
115C-296.2 2026‑41 S257 7A.3 7A.3 07/01/2026 No
115C-296.5 2026‑41 S257 7.43(a) 7.9C 07/01/2026 No
115C-296.6 2026‑41 S257 7.43(b) 7.9C1 07/01/2026 No
115C-296.10 (b) 2026‑41 S257 7.24(d) 7.9991 07/01/2026 No
115C-299 2025‑25 H40 13(b) 13 06/26/2025 Yes
115C-299.5 catch line, (b) 2026‑41 S257 7.7(h) 7.78 07/01/2026 No
115C-302.1 (j) 2026‑40 S1041 4.29 4.9 10/01/2026 No
115C-302.6 2026‑41 S257 7A.6(a) 7A.6 07/01/2026 No
115C-302.9 2026‑41 S257 7A.4(a) 7A.4 07/01/2026 No
115C-310.3 2026‑41 S257 7.19(a) 7.98 07/07/2026 No
115C-310.5 2026‑41 S257 7.19(a) 7.98 07/07/2026 No
115C-310.9 2026‑41 S257 7.19(a) 7.98 07/07/2026 No
115C-310.11 2026‑41 S257 7.19(a) 7.98 07/07/2026 No
115C-310.13 2026‑41 S257 7.19(a) 7.98 07/07/2026 No
115C-310.15 2026‑41 S257 7.19(a) 7.98 07/07/2026 No
115C-310.15 (d) 2025‑94 H926 7(b) 7 10/06/2025 Yes
115C-315 (a) 2025‑25 H40 13(c) 13 06/26/2025 Yes
115C-315 (b) 2025‑25 H40 3(d) 3 06/26/2025 Yes
115C-315 (d2) 2025‑60 S600 5(a) 5 07/03/2025 Yes
115C-316.2 2026‑41 S257 7.7(f) 7.76 07/01/2026 No
115C-316.5 (a) 2026‑41 S257 7.7(g) 7.77 07/01/2026 No
115C-319 Art. 21A, title 2025‑73 S375 2(b) 2 07/09/2025 Yes
115C-320 2025‑73 S375 2(a) 2 07/09/2025 Yes
115C-332 (b), (j), (k) 2025‑47 S391 12(a) 12 10/01/2025 Yes
115C-336.1 2026‑40 S1041 4.30 4.9 10/01/2026 No
115C-366 (a9) 2025‑72 S118 2(a) 2 07/09/2025 Yes
115C-366 (a9)(4) 2025‑92 H358 2.2 2.2 09/30/2025 Yes
115C-369 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
115C-375.2 (a) 2025‑60 S600 4(a) 4 07/03/2025 Yes
115C-375.2A 2025‑60 S600 4(b) 4 07/03/2025 Yes
115C-375.3 2026‑41 S257 7.32(a) 7.999994 07/01/2026 No
115C-375.6 2026‑41 S257 7.38(a) 7.9999998 07/07/2026 No
115C-375.20 (c) 2026‑41 S257 7.31(g) 7.99997 07/01/2026 No
115C-377 2026‑41 S257 7.18 7.97 07/01/2026 No
115C-379 2026‑11 S401 9 9 06/22/2026 No
115C-379 2026‑41 S257 7.54(a) 7.9I 07/07/2026 No
115C-384 (c) 2026‑41 S257 7.4(t) 7.499 07/01/2026 No
115C-390.2 2025‑25 H40 36.1(a) 36.1 06/26/2025 Yes
115C-390.2 (b) 2026‑20 S227 2.5(b) 2.5 06/24/2026 No
115C-390.2 (l)(1) 2026‑41 S257 7.4(u) 7.4991 07/01/2026 No
115C-390.5 2025‑25 H40 36.1(b) 36.1 06/26/2025 Yes
115C-390.5 (c)(1) 2026‑41 S257 7.4(v) 7.4992 07/01/2026 No
115C-390.6 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
115C-390.8 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
115C-398 2026‑41 S257 7.4(w) 7.4993 07/01/2026 No
115C-401.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
115C-401.2 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
115C-401.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-401.2 (a)(5) 2026‑41 S257 7.31(h) 7.99998 07/01/2026 No
115C-407.45 2026‑41 S257 7.54(b) 7.9I1 07/07/2026 No
115C-407.57 (b)(2)f. 2025‑49 H928 1 1 07/02/2025 Yes
115C-407.61 (a)(6) 2026‑40 S1041 4.31 4.9 10/01/2026 No
115C-431 (b1)(1) 2026‑41 S257 7.31(i) 7.99999 07/01/2026 No
115C-438.1 2026‑41 S257 7.49 7.9D 07/01/2026 No
115C-450 (d) 2026‑41 S257 7.7(l) 7.793 07/01/2026 No
115C-472.22 Art. 32F title 1 2026‑41 S257 7.3(a) 7.3 07/01/2026 No
115C-472.22 2 2026‑41 S257 7.5(a) 7.5 07/07/2026 No
115C-472.22 (a) 3 2026‑41 S257 7.4(x) 7.4994 07/01/2026 No
115C-472.30 2026‑41 S257 7.3(b) 7.3 07/01/2026 No
115C-546.10 2026‑41 S257 4.3(a) 4.3 07/01/2026 No
115C-546.10 2026‑41 S257 5.5(b) 5.5 07/01/2026 No
115C-546.10 2026‑50 H1126 3.1(j) 3.1 07/07/2026 No
115C-550.2 2026‑41 S257 7.33(f) 7.9999993 07/07/2026 No
115C-555 (2) 2025‑92 H358 2.11(l) 2.11 09/30/2025 Yes
115C-558.2 2026‑41 S257 7.33(g) 7.9999994 07/07/2026 No
115C-562.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
115C-562.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
115C-562.2 (a) 2026‑41 S257 8A.3(a) 8A.3 07/01/2026 No
115C-562.2 (b5) 2026‑41 S257 8A.4 8A.4 07/01/2026 No
115C-562.2A 2026‑41 S257 8A.5(a) 8A.5 07/07/2026 No
115C-562.3 2026‑41 S257 8A.2(a) 8A.2 07/01/2026 No
115C-562.5 2026‑41 S257 8A.12(a) 8A.92 07/01/2026 No
115C-562.5 2026‑42 H56 2.8(a) 2.8 07/01/2026 No
115C-562.5 (b2) 2026‑41 S257 8A.7(b) 8A.7 07/01/2026 No
115C-566 2026‑46 H1094 9(b) 9 10/01/2026 No
115C-591 2026‑41 S257 8A.16(a) 8A.95 07/07/2026 No
115C-592 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
115C-592 (a) 2026‑41 S257 8A.3(b) 8A.3 07/01/2026 No
115C-592 (c1) 2026‑41 S257 8A.7(a) 8A.7 07/01/2026 No
115C-594 (b) 2026‑41 S257 8A.2(b) 8A.2 07/01/2026 No
115C-595 2026‑41 S257 8A.16(b) 8A.95 07/07/2026 No
115C-600 (a) 2026‑41 S257 8A.15 8A.94 07/01/2026 No
115C-600 (b) 2026‑41 S257 8A.11(a) 8A.91 07/01/2026 No
115D-1 Art. 1, Part 1 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-1.3 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-2 (2) 2025‑56 S125 2(k) 2 07/03/2025 Yes
115D-2.2 (b) 2026‑41 S257 5.10(o) 5.91.992 07/01/2027 No
115D-3 (a3) 2026‑40 S1041 4.32 4.9 10/01/2026 No
115D-4.1 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-5 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-5 2026‑21 S558 1(b) 1 06/24/2026 No
115D-5 (aa) 2026‑41 S257 5.9(d2) 5.9 07/07/2026 No
115D-5 (b)(2)i. 2025‑57 S655 5 5 07/03/2025 Yes
115D-5 (bb) 2026‑41 S257 5.9(d2) 5.9 07/07/2026 No
115D-5.1 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-5.1A 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-5.2 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-5.5 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-6 Art. 1, Part 2 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-6.1 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-6.2 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-6.3 2026‑41 S257 5.9(d2) 5.9 07/07/2026 No
115D-6.5 (c) 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9 2026‑41 S257 42.7(b) 42.7 07/01/2026 No
115D-9 (g) 2026‑41 S257 22.5(e) 22.5B 07/01/2026 No
115D-9.5 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9.10 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9.15 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9.20 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9.25 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9.30 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9.35 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-9.40 2025‑46 H378 1.2(a) 1.2 07/01/2025 Yes
115D-9.45 2026‑41 S257 6.10(a) 6.8 07/07/2026 No
115D-10.5 Art. 1, Part 3 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.10 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.15 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.17 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.17 (e) 2025‑56 S125 2.5.(a) 2.5 07/03/2025 Yes
115D-10.19 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.21 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.21 (a) 2026‑41 S257 6.3(a) 6.3 07/01/2026 No
115D-10.25 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.30 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.35 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.40 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.45 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.50 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.55 2026‑41 S257 6.2(c) 6.22 07/01/2026 No
115D-10.65 Art. 1, Part 4 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.70 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.70 2026‑46 H1094 9(b) 9 10/01/2026 No
115D-10.75 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.76 2025‑56 S125 1(a) 1 07/03/2025 Yes
115D-10.80 2025‑46 H378 2(b) 2 07/01/2025 Yes
115D-10.85 2026‑41 S257 6.7(a) 6.7 12/01/2026 No
115D-20 (4) 2025‑56 S125 1(b) 1 07/03/2025 Yes
115D-20 (4)a. 2025‑46 H378 3(a) 3 07/01/2025 Yes
115D-21.2 2025‑56 S125 1(c) 1 07/03/2025 Yes
115D-21.2 2025‑92 H358 2.11(b) 2.11 09/30/2025 Yes
115D-21.5 2025‑56 S125 1(d) 1 07/03/2025 Yes
115D-21.10 2025‑56 S125 1(e) 1 07/03/2025 Yes
115D-30.1 (b)(1), (3) 2025‑56 S125 2.5(b) 2.5 07/03/2025 Yes
115D-30.5 Art. 2B 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-30.10 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-30.15 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-30.20 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-30.25 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-30.25 (e) 2025‑56 S125 2.5(c) 2.5 07/03/2025 Yes
115D-30.30 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-31 (e) 2026‑41 S257 6.2(d) 6.22 07/01/2026 No
115D-31.1 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-31.2 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-31.3 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-31.3 (e) 2025‑56 S125 2.5(d) 2.5 07/03/2025 Yes
115D-31.4 2026‑41 S257 6.2(f) 6.24 07/01/2026 No
115D-32 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-33 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-34 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-35 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-36 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-37 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-38 2025‑56 S125 1(g) 1 07/03/2025 Yes
115D-38.5 2025‑56 S125 1(i) 1 07/03/2025 Yes
115D-38.10 2025‑56 S125 1(j) 1 07/03/2025 Yes
115D-39 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-39 (a1) 2025‑56 S125 2(l) 2 07/03/2025 Yes
115D-39.1 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-39.2 2025‑56 S125 1(h) 1 07/03/2025 Yes
115D-39.5 2025‑56 S125 1(h) 1 07/03/2025 Yes
115D-39.5 (a)(2)j. 2025‑92 H358 2.3(a) 2.3 09/30/2025 Yes
115D-40.1 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-40.5 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-41 1 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-41 2 2025‑56 S125 1(i) 1 07/03/2025 Yes
115D-41 (a) 3 2025‑56 S125 2(m) 2 07/02/2025 Yes
115D-43 1 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-43 2 2025‑56 S125 1(j) 1 07/03/2025 Yes
115D-44 1 2025‑56 S125 1(f) 1 07/03/2025 Yes
115D-44 2 2025‑56 S125 1(k) 1 07/03/2025 Yes
115D-58.17 (a) 2026‑41 S257 6.1 6.1 07/01/2026 No
115D-72 Art. 6A 2025‑56 S125 2(n) 2 07/03/2025 Yes
115D-78 2026‑41 S257 8.14(c) 8.95 07/07/2026 No
115D-264 (d) 2026‑41 S257 7.20(e) 7.994 07/01/2026 No
115E-31.3 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
116-11 2025‑97 S449 2.4 2.4 07/01/2025 Yes
116-11 (9b) 2025‑4 H74 2.1 2.1 05/14/2025 Yes
116-11 (9c) 2025‑46 H378 1.3(a) 1.3 07/01/2025 Yes
116-11 (3d) 1 2026‑41 S257 8.19(a) 8.99 07/07/2026 No
116-11 (7b) 2 2026‑41 S257 8.17(a) 8.96 12/01/2026 No
116-11 (9c) 3 2026‑21 S558 1(a) 1 06/24/2026 No
116-11 (15) 4 2026‑41 S257 7.38(f) 7.99999993 07/07/2026 No
116-11.4 2025‑92 H358 2.11(a) 2.11 09/30/2025 Yes
116-14 (b) 2026‑40 S1041 4.33 4.9 10/01/2026 No
116-15 2026‑41 S257 8.18 8.98 07/01/2026 No
116-17.4 2026‑41 S257 8.11 8.91 07/01/2026 No
116-30.2 2025‑25 H40 14(a) 14 06/26/2025 Yes
116-30.4 2026‑40 S1041 4.34 4.9 10/01/2026 No
116-31.11 2026‑9 H1123 4.1(a) 4.1 06/19/2026 No
116-31.11 (f) 2026‑41 S257 22.5(f) 22.5C 07/01/2026 No
116-33.2 2026‑40 S1041 4.35 4.9 10/01/2026 No
116-36.10 2026‑41 S257 8.20(a) 8.990 06/30/2026 No
116-37.3 (b) 2026‑40 S1041 4.36 4.9 10/01/2026 No
116-40.14 2026‑19 S153 6 6 06/24/2026 No
116-41.30 Art. 1, Part 4B 2026‑41 S257 8.3 8.3 07/01/2026 No
116-41.31 2026‑41 S257 8.3 8.3 07/01/2026 No
116-43.17 2026‑41 S257 8.14(b) 8.94 07/07/2026 No
116-44.9A Art. 1, Part 8A 2025‑46 H378 4(a) 4 07/01/2025 Yes
116-44.9A Art. 1, Part 8A 2025‑92 H358 2.5 2.5 09/30/2025 Yes
116-44.9A Art. 1, Part 8A 2025‑72 S118 3(a) 3 06/30/2025 Yes
116-44.9B 2025‑46 H378 4(a) 4 07/01/2025 Yes
116-44.9B 2025‑92 H358 2.5 2.5 09/30/2025 Yes
116-44.9B 2025‑72 S118 2.5 2.5 06/30/2025 Yes
116-44.9C 2025‑46 H378 4(a) 4 07/01/2025 Yes
116-44.9C 2025‑92 H358 2.5 2.5 09/30/2025 Yes
116-44.9C 2025‑72 S118 2.5 2.5 06/30/2025 Yes
116-74.44 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
116-143 (d), (d1), (d2) 2025‑17 H373 1 1 06/26/2025 Yes
116-143 (d1)(1)a., b. 2025‑92 H358 2.4(a) 2.4 06/26/2025 Yes
116-143.2A 2026‑41 S257 8.17(b) 8.96 12/01/2026 No
116-143.3 (a)(2) 2025‑20 H91 1.3 1.3 06/26/2025 Yes
116-143.3B 2025‑72 S118 3(b) 3.1 07/09/2025 Yes
116-143.11 (a) 2025‑97 S449 2.2(a) 2.2 07/01/2025 Yes
116-143.11 (a) 2026‑41 S257 8.12(a) 8.92 07/01/2026 No
116-143.11 (d) 2026‑41 S257 8.25(b) 8.992 07/01/2026 No
116-143.13 2026‑41 S257 8.25(a) 8.991 07/01/2026 No
116-201 (b) 2025‑92 H358 2.11(m) 2.11 09/30/2025 Yes
116-201 (b)(8) 2025‑56 S125 2(o) 2 07/03/2025 Yes
116-203 (b) 2026‑41 S257 5.10(h) 5.91.95 07/07/2026 No
116-204 (14) 2026‑6 H87 1 1 06/03/2026 Yes
116-209 2026‑50 H1126 3.1(k) 3.1 07/07/2026 No
116-209.16A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
116-209.18 2026‑41 S257 8.1(b) 8.1 07/01/2026 No
116-209.19B 2026‑41 S257 8.17(c) 8.97 12/01/2026 No
116-209.25 2026‑50 H1126 3.1(l) 3.1 07/07/2026 No
116-209.25 (b) 2026‑1 H696 2.2 2.2 4/30/2026 Yes
116-209.28 2025‑25 H40 15 15 06/26/2025 Yes
116-209.32 2026‑41 S257 8A.14(a) 8A.93 07/01/2026 No
116-209.45 (c1) 2026‑41 S257 8A.17(a) 8A.95 07/01/2026 No
116-209.62 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
116-209.62 2026‑41 S257 8.5(a) 8.5 07/01/2026 No
116-209.89 2026‑9 H1123 3.1(a) 3.1 06/19/2026 No
116-209.90 2026‑9 H1123 3.1(a) 3.1 06/19/2026 No
116-209.91 2026‑9 H1123 3.1(a) 3.1 06/19/2026 No
116-209.100 (1)c. 2026‑41 S257 8A.9(c) 8A.90 07/07/2026 No
116-209.110 Art. 23, Part 8 2026‑6 H87 2 2 06/03/2026 Yes
116-209.111 2026‑6 H87 2 2 06/03/2026 Yes
116-209.120 Art. 23, Part 9 2026‑41 S257 8A.8(a) 8A.8 07/07/2026 No
116-209.122 2026‑41 S257 8A.8(a) 8A.8 07/07/2026 No
116-209.124 2026‑41 S257 8A.8(a) 8A.8 07/07/2026 No
116-209.126 2026‑41 S257 8A.8(a) 8A.8 07/07/2026 No
116-209.128 2026‑41 S257 8A.8(a) 8A.8 07/07/2026 No
116-235 (b)(1) 2025‑20 H91 1.4 1.4 06/26/2025 Yes
116-235 (b)(1) 2026‑9 H1123 2.1(a) 2.1 06/19/2026 No
116-235 (b)(1) 2026‑42 H56 2.6 2.6 07/01/2026 No
116-239.8 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
116-239.8 (b)(21a), (21b) 2025‑46 H378 1.1(h) 1.1 07/01/2025 Yes
116-239.8 (b)(9) 2025‑60 S600 4(e) 4 07/03/2025 Yes
116-239.8 (b) 1 2026‑41 S257 7.33(e) 7.9999992 07/07/2026 No
116-239.8 (b) 2 2026‑41 S257 7.39(j) 7.39 07/01/2026 No
116-239.8 (b) 3 2026‑41 S257 8.4 8.4 07/01/2026 No
116-239.8 (b)(2) 4 2026‑41 S257 7.36(f) 7.9999996 07/01/2026 No
116-239.8 (b)(9) 5 2026‑41 S257 7.32(d) 7.999997 07/01/2026 No
116-239.8 (b)(21c) 6 2026‑41 S257 7.39(j) 7.9A 07/01/2026 No
116-239.8 (b)(26) 7 2026‑41 S257 7.54(f) 7.9I5 07/07/2026 No
116-239.10 (8), (9) 2026‑40 S1041 4.37 4.9 10/01/2026 No
116-239.11 (a)(2) 2026‑41 S257 7.57(d) 7.9K 07/01/2026 No
116-255 2026‑41 S257 8.9(a) 8.9 07/07/2026 No
116-255 (b)(6) 2025‑4 H74 2.3(b) 2.3 05/14/2025 Yes
116-257 2026‑41 S257 8.10(a) 8.90 07/07/2026 No
116-258.1 Art. 31B 2026‑41 S257 8.2(a) 8.2 07/01/2026 No
116-258.2 2026‑41 S257 8.2(a) 8.2 07/01/2026 No
116-258.3 2026‑41 S257 8.2(a) 8.2 07/01/2026 No
116-280 2026‑41 S257 8A.9(a) 8A.9 07/07/2026 No
116-280 (3) 2025‑56 S125 2(p) 2 07/03/2025 Yes
116-280 (3) 2025‑92 H358 2.11(n) 2.11 09/30/2025 Yes
116-284 2026‑41 S257 8A.9(b) 8A.9 07/07/2026 No
116-290 2026‑41 S257 8.8(a) 8.8 07/07/2026 No
116-292 2026‑41 S257 8.8(a) 8.8 07/07/2026 No
116-294 2026‑41 S257 8.8(a) 8.8 07/07/2026 No
116-300 (9) 2026‑21 S558 4 4 06/24/2026 No
116-301 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
116-350 (3a) 2026‑41 S257 5.7(a) 5.7 07/01/2026 No
116-350.30 (a) 2026‑40 S1041 4.38 4.9 10/01/2026 No
116-350.70 2026‑41 S257 5.7(b) 5.7 07/01/2026 No
116-360.5 (2) 2026‑40 S1041 4.39 4.9 10/01/2026 No
116-360.15 (b) 2026‑40 S1041 4.40 4.9 10/01/2026 No
116-415 Art. 39 2026‑21 S558 2 2 06/24/2026 No
116-416 2026‑21 S558 2 2 06/24/2026 No
116-417 2026‑21 S558 2 2 06/24/2026 No
116A-44.9A Art. 1, Part 8A 2025‑72 S118 3(a) 3 07/09/2025 Yes
116A-44.9B 2025‑72 S118 3(a) 3 07/09/2025 Yes
116A-44.9C 2025‑72 S118 3(a) 3 07/09/2025 Yes
116B-7 2026‑41 S257 8.1(a) 8.1 07/01/2026 No
116B-8 2026‑50 H1126 5.1 5.1 07/07/2026 No
116B-52 (11a) 2026‑50 H1126 5.2 5.2 07/07/2026 No
116B-59 (a1) 2026‑50 H1126 5.3(a) 5.3 12/01/2026 No
116B-60 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
116B-60 2026‑50 H1126 5.4(a) 5.4 12/01/2026 No
116B-67 (b) 2026‑50 H1126 5.4(b) 5.4 12/01/2026 No
116B-77 (b) 2026‑50 H1126 5.4(c) 5.4 07/07/2026 No
116B-78 (b) 2026‑50 H1126 4.6 4.6 07/07/2026 No
116D-4 2026‑41 S257 22.5(x) 22.5U 07/01/2026 No
116E-1 Chapter, title 2025‑62 S133 3(a) 3 07/01/2025 Yes
116E-2 2025‑62 S133 3(a) 3 07/01/2025 Yes
116E-4 2025‑62 S133 3(a) 3 07/01/2025 Yes
116E-5 2025‑62 S133 3(a) 3 07/01/2025 Yes
116E-6 2025‑62 S133 3(a) 3 07/01/2025 Yes
119-57 2026‑11 S401 12 12 06/22/2026 No
119-63.4 2026‑11 S401 18(a) 18 01/01/2027 No
119-63.6 (a) 2026‑11 S401 18(b) 18 06/22/2026 No
120-4.8 (4d) 2025‑11 H477 8(a) 8 06/13/2025 Yes
120-4.10 2025‑11 H477 8(b) 8 06/13/2025 Yes
120-4.10 (c) 2026‑50 H1126 1.8(d) 1.8 07/07/2026 No
120-4.11 2026‑50 H1126 4.4(a) 4.4 07/07/2026 No
120-4.11 (2) 2026‑50 H1126 4.1(n) 4.1 01/01/2027 No
120-4.12 (c)(2) 2026‑50 H1126 4.1(n) 4.1 01/01/2027 No
120-4.13 (a) 2026‑50 H1126 4.1(n) 4.1 01/01/2027 No
120-4.15 (a), (b) 2026‑50 H1126 4.1(n) 4.1 01/01/2027 No
120-4.18 2026‑50 H1126 3.1(m) 3.1 07/07/2026 No
120-4.21 (b2)(3) 2025‑19 H476 7.1 7.1 06/26/2025 Yes
120-4.21 (b2)(3) 2026‑50 H1126 4.9(e) 4.9 07/07/2026 No
120-4.21 (c) 2026‑50 H1126 1.4(d) 1.4 07/01/2026 No
120-4.21 (d) 2026‑50 H1126 1.4(c) 1.4 07/01/2026 No
120-4.22A (ff) 2026‑41 S257 41.26(c) 41.9G 07/01/2026 No
120-4.23 2026‑50 H1126 4.1(p) 4.1 01/01/2027 No
120-4.23 (b) 2026‑50 H1126 4.1(o) 4.1 01/01/2027 No
120-4.25 2026‑50 H1126 4.9(d) 4.9 07/07/2026 No
120-4.26A 2025‑11 H477 8(c) 8 06/13/2025 Yes
120-4.27 2025‑11 H477 8(d) 8 06/13/2025 Yes
120-4.28 2025‑19 H476 7.2 7.2 06/26/2025 Yes
120-4.29 2026‑50 H1126 1.2(c) 1.2 07/07/2026 No
120-4.33A (c) 2025‑19 H476 2.1(d) 2.1 06/26/2025 Yes
120-12.1 2026‑41 S257 20.4 20.4 07/01/2026 No
120-29.5 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
120-32 2026‑40 S1041 2(a) 2 10/01/2026 No
120-32 (1) 2025‑19 H476 5.1(a) 5.1 06/26/2025 Yes
120-32 (11) 2026‑41 S257 29.1(a) 29.1 07/01/2026 No
120-32.2 2025‑97 S449 6.7(b) 6.7 07/01/2025 Yes
120-32.5 2026‑40 S1041 2(b) 2 10/01/2026 No
120-36.30 Art. 7E, Part 1 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.31 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.32 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.40 Art. 7E, Part 2 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.41 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.42 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.43 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.44 2026‑40 S1041 2(c) 2 10/01/2026 No
120-36.45 2026‑40 S1041 2(c) 2 10/01/2026 No
120-37 (b) 2026‑41 S257 41.12 41.9B 07/01/2026 No
120-37 (c) 2026‑41 S257 41.11 41.9A 07/01/2026 No
120-70.101 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
120-76.1 (1), (4) 2026‑41 S257 5.6(a) 5.6 07/01/2026 No
120-86.1 2026‑40 S1041 4.41 4.9 10/01/2026 No
120-114 2026‑50 H1126 6.6 6.6 07/07/2026 No
120-129 2026‑41 S257 8.9(b) 8.9 07/07/2026 No
120-167 2026‑50 H1126 4.8(a) 4.8 07/07/2026 No
120-170 2026‑50 H1126 4.8(b) 4.8 07/07/2026 No
120-171 2026‑50 H1126 4.8(c) 4.8 07/07/2026 No
120-172 2026‑50 H1126 4.8(d) 4.8 07/07/2026 No
120-173 2026‑50 H1126 4.8(e) 4.8 07/07/2026 No
120-174 2026‑50 H1126 4.8(f) 4.8 07/07/2026 No
120-208.4 (b) 2026‑41 S257 9B.5(a) 9B.5 07/01/2026 No
120C-100 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
120C-100 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
121-6 (b), (c) 2025‑10 S477 4 4 06/13/2025 Yes
121-9 (h) 2026‑41 S257 42.8(b) 42.8A 07/01/2026 No
121-12.1 2025‑10 S477 7(a) 7.0 06/13/2025 Yes
121-42 2025‑25 H40 16 16 06/26/2025 Yes
121-52 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
122A-5.14 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
122C-3 2026‑41 S257 9G.3(b) 9G.3 07/01/2026 No
122C-3 (14)j. 2026‑44 S355 2.3(a) 2.3 07/07/2026 No
122C-24 2025‑25 H40 24(h) 24 06/26/2025 Yes
122C-24.1 (h), (j) 2025‑25 H40 24(i) 24 06/26/2025 Yes
122C-54 (b) 2026‑38 H1104 13(j) 13 12/01/2026 No
122C-54 (d) 2025‑93 H307 1(f) 1 10/03/2025 Yes
122C-54 (d) 2026‑38 H1104 11(j) 11 12/01/2026 No
122C-112.1 (b)(6) 2026‑40 S1041 4.42 4.9 10/01/2026 No
122C-121 (a1) 2026‑40 S1041 4.43 4.9 10/01/2026 No
122C-142.1 2026‑44 S355 2.3(b) 2.3 07/07/2026 No
122C-142.2 2025‑16 H612 1.16(a) 1.16 06/26/2025 Yes
122C-154 2026‑40 S1041 4.44 4.9 10/01/2026 No
122C-156 (a) 2026‑40 S1041 4.45 4.9 10/01/2026 No
122C-191 (b) 2026‑40 S1041 4.46 4.9 10/01/2026 No
122C-256 2025‑27 H576 6(a) 6 06/27/2025 Yes
122C-256 2026‑38 H1104 13(k) 13 12/01/2026 No
122C-261 (d)(3) 2026‑38 H1104 11(a) 11 12/01/2026 No
122C-263 2026‑38 H1104 11(b) 11 12/01/2026 No
122C-263.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
122C-265 2026‑38 H1104 11(c) 11 12/01/2026 No
122C-266 2026‑38 H1104 14(b) 14 07/06/2026 No
122C-266 (a), (b1) 2025‑93 H307 9.5(a) 9.5 12/01/2025 Yes
122C-267 2026‑38 H1104 11(d) 11 12/01/2026 No
122C-268 (c) 2025‑93 H307 7(c) 7 12/01/2025 Yes
122C-270 (f) 2026‑40 S1041 4.47 4.9 10/01/2026 No
122C-271 2025‑54 H620 11(a) 11 07/02/2025 Yes
122C-271 2026‑38 H1104 11(e) 11 12/01/2026 No
122C-273 2026‑38 H1104 11(f) 11 12/01/2026 No
122C-273 (a) 2026‑38 H1104 13(m) 13 12/01/2026 No
122C-274 2026‑38 H1104 11(g) 11 12/01/2026 No
122C-275 2026‑38 H1104 11(h) 11 12/01/2026 No
122C-276 2026‑38 H1104 11(i) 11 12/01/2026 No
122C-277 (b) 2025‑93 H307 7(d) 7 12/01/2025 Yes
122C-287 (1) 2025‑54 H620 11(b) 11 07/02/2025 Yes
122C-314 2026‑41 S257 9G.3(c) 9G.3 07/01/2026 No
122E-3 (c) 2026‑50 H1126 3.1(n) 3.1 07/07/2026 No
124-3 (a) 2026‑41 S257 43.18(a) 43.18 07/01/2026 No
124-17 2026‑41 S257 43.18(b) 43.18B 07/01/2026 No
126-1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
126-1 Chapter 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-1.1 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-2 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-3 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-3.1 2025‑34 S124 5(a) 5 07/01/2025 Yes
126-3.1 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-4 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-5 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-5 2026‑41 S257 11.13(a) 11.91 07/01/2026 No
126-5 2026‑42 H56 4.8(a) 4.8A 07/01/2026 No
126-5 (c1) 2026‑41 S257 13.3(b) 13.9 01/01/2027 No
126-5 (c1)(8) 2026‑42 H56 8.3(a) 8.3 07/01/2026 No
126-5 (c1)(8a) 2026‑41 S257 7.31(k) 7.999991 07/01/2026 No
126-5 (c13) 2026‑50 H1126 1.7(c) 1.7 07/07/2026 No
126-5 (c14) 2026‑41 S257 41.20 41.9C 07/01/2026 No
126-5 (c22) 2026‑41 S257 5.9(a2) 5.9 See Bill No
126-5 (c1)(8) 1 2025‑4 H74 2.2(a) 2.2 01/01/2026 Yes
126-5 (c1)(40) 2.1 2025‑97 S449 5.4 5.4 07/01/2025 Yes
126-5 (c1)(40), (41) 2.2 2025‑6 H506 4.1(b) 4.1 07/01/2025 Yes
126-5 (c2) 3 2025‑6 H506 4.1(b) 4.1 07/01/2025 Yes
126-5 (c2)(3) 3.5 2025‑56 S125 2(q) 2 07/03/2025 Yes
126-5 (c7) 4 2025‑34 S124 2(b) 2.1 07/01/2025 Yes
126-5 (c11)(2)d. 5 2025‑10 S477 5(a) 5.0 06/13/2025 Yes
126-5 (c14), (d)(1)(2), (d)(1)(4) 5.5 2025‑89 H125 2E.3(b) 2 07/01/2025 Yes
126-5 (c17) 6 2025‑34 S124 2(c) 2.2 07/01/2025 Yes
126-5 (c18) 7 2025‑34 S124 2(d) 2.3 07/01/2025 Yes
126-5 (c22) 9 2025‑ H171 1.1(b) 1.1 07/01/2026 Vetoed No
126-6.2 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-6.3 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-6.3 (a) 2025‑47 S391 9 9 07/01/2025 Yes
126-6.3 (a) 2026‑41 S257 14.2 14.2 07/01/2026 No
126-6.4 2025‑34 S124 6(a) 6 07/01/2025 Yes
126-6.4 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-7.1 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-7.1 (i) 2026‑40 S1041 5.7(b) 5.7 10/01/2026 No
126-7.3 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8.1 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8.2 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8.3 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8.4 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8.5 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8.6 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-8.7 2025‑34 S124 1 1 07/01/2025 Yes
126-8.7 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-9 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-10 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-11 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-11.1 2025‑34 S124 9 9 07/01/2025 Yes
126-11.1 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-11.2 2025‑34 S124 10 10 07/01/2025 Yes
126-11.2 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-12 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-13 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.1 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.2 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.2 (b), (b1) 2025‑34 S124 3(a) 3 07/01/2025 Yes
126-14.3 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.3 (3) 2025‑34 S124 4(a) 4 07/01/2025 Yes
126-14.3A 2025‑34 S124 2(a) 2 07/01/2025 Yes
126-14.3A 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.3B 2025‑34 S124 7 7 07/01/2025 Yes
126-14.3B 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.5 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.6 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-14.7 2025‑ H171 1.1(a) 1.1 07/01/2026 Vetoed No
126-14.7 2026‑40 S1041 5.8(a) 5.8 10/01/2026 No
126-14.7 2026‑41 S257 5.9(a2) 5.9 See Bill No
126-15 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-16 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-16.1 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-17 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-18 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-19 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-22 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-22 (c) 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027 No
126-23 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-24 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-25 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-26 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-27 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-28 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-29 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-30 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-34.01 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-34.02 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-34.2 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-34.3 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-35 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-51 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-52 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-53 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-54 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-55 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-56 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-57 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-58 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-74 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-75 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-76 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-77 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-78 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-80 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-80.5 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-81 2025‑25 H40 17(a) 17 06/26/2025 Yes
126-81 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-82 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-83 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-84 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-85 2025‑25 H40 14(b) 14 06/26/2025 Yes
126-85 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-86 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-87 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-88 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-90 2026‑40 S1041 4.90 4.91 10/01/2026 No
126-95 2026‑40 S1041 4.90 4.91 10/01/2026 No
126A-1 Chapter, Art. 1, Part 1 2026‑40 S1041 1 1 10/01/2026 No
126A-2 2026‑40 S1041 1 1 10/01/2026 No
126A-10 Art. 1, Part 2 2026‑40 S1041 1 1 10/01/2026 No
126A-10.1 2026‑40 S1041 1 1 10/01/2026 No
126A-15 Art. 1, Part 3 1 2026‑40 S1041 1 1 10/01/2026 No
126A-15 (5)d. 2 2026‑42 H56 4.8(b) 4.8E 07/01/2026 No
126A-15 (5)d. 3 2026‑40 S1041 5.9(g) 5.9 10/01/2026 No
126A-15 (6)c. 4 2026‑42 H56 6.1(a) 6.1 10/01/2026 No
126A-15 (8)h. 4 2026‑40 S1041 5.9(e) 5.9 10/01/2026 No
126A-15 (8)g. 6 2026‑42 H56 8.3(b) 8.3A 10/01/2026 No
126A-15 (8)hh. 7 2026‑40 S1041 5.9(j) 5.9 10/01/2026 No
126A-15 (8)gg. 8 2026‑42 H56 4.8(b) 4.8D 07/01/2026 No
126A-15 (8)gg. 9 2026‑40 S1041 5.9(f) 5.9 10/01/2026 No
126A-15.1 2026‑40 S1041 1 1 10/01/2026 No
126A-15.2 2026‑40 S1041 1 1 10/01/2026 No
126A-15.2 (p), (q) 2026‑40 S1041 5.8(b) 5.8 10/01/2026 No
126A-15.3 2026‑40 S1041 1 1 10/01/2026 No
126A-15.4 2026‑40 S1041 1 1 10/01/2026 No
126A-15.4 (d)(7) 2026‑40 S1041 5.7(e) 5.7 10/01/2026 No
126A-15.5 2026‑40 S1041 1 1 10/01/2026 No
126A-15.6 2026‑40 S1041 1 1 10/01/2026 No
126A-20 Art. 2 2026‑40 S1041 1 1 10/01/2026 No
126A-21 2026‑40 S1041 1 1 10/01/2026 No
126A-22 2026‑40 S1041 1 1 10/01/2026 No
126A-23 2026‑40 S1041 1 1 10/01/2026 No
126A-24 2026‑40 S1041 1 1 10/01/2026 No
126A-30 Art. 3 2026‑40 S1041 1 1 10/01/2026 No
126A-31 2026‑40 S1041 1 1 10/01/2026 No
126A-32 2026‑40 S1041 1 1 10/01/2026 No
126A-40 Art. 4 2026‑40 S1041 1 1 10/01/2026 No
126A-41 2026‑40 S1041 1 1 10/01/2026 No
126A-41 (b) 2026‑40 S1041 5.9(l) 5.9 10/01/2026 No
126A-42 2026‑40 S1041 1 1 10/01/2026 No
126A-50 Art. 5, Part 1 2026‑40 S1041 1 1 10/01/2026 No
126A-51 2026‑40 S1041 1 1 10/01/2026 No
126A-52 2026‑40 S1041 1 1 10/01/2026 No
126A-53 2026‑40 S1041 1 1 10/01/2026 No
126A-54 2026‑40 S1041 1 1 10/01/2026 No
126A-55 2026‑40 S1041 1 1 10/01/2026 No
126A-56 2026‑40 S1041 1 1 10/01/2026 No
126A-56.1 2026‑40 S1041 1 1 10/01/2026 No
126A-56.2 2026‑40 S1041 1 1 10/01/2026 No
126A-56.3 2026‑40 S1041 1 1 10/01/2026 No
126A-57 2026‑40 S1041 1 1 10/01/2026 No
126A-57.1 2026‑40 S1041 1 1 10/01/2026 No
126A-57.2 2026‑40 S1041 1 1 10/01/2026 No
126A-57.3 2026‑40 S1041 1 1 10/01/2026 No
126A-58 Art. 5, Part 2 2026‑40 S1041 1 1 10/01/2026 No
126A-60 Art. 6, Part 1 2026‑40 S1041 1 1 10/01/2026 No
126A-61 2026‑40 S1041 1 1 10/01/2026 No
126A-61 (a) 2026‑40 S1041 5.7(c) 5.7 10/01/2026 No
126A-62 2026‑40 S1041 1 1 10/01/2026 No
126A-63 Art. 6, Part 2 2026‑40 S1041 1 1 10/01/2026 No
126A-70 Art. 7, Part 1 2026‑40 S1041 1 1 10/01/2026 No
126A-71 2026‑40 S1041 1 1 10/01/2026 No
126A-72 Art. 7, Part 2 2026‑40 S1041 1 1 10/01/2026 No
126A-73 2026‑40 S1041 1 1 10/01/2026 No
126A-74 2026‑40 S1041 1 1 10/01/2026 No
126A-74.1 2026‑40 S1041 1 1 10/01/2026 No
126A-75 Art. 7, Part 3 2026‑40 S1041 1 1 10/01/2026 No
126A-76 Art. 7, Part 4 2026‑40 S1041 1 1 10/01/2026 No
126A-80 Art. 8 2026‑40 S1041 1 1 10/01/2026 No
126A-81 2026‑40 S1041 1 1 10/01/2026 No
126A-82 2026‑40 S1041 1 1 10/01/2026 No
126A-83 2026‑40 S1041 1 1 10/01/2026 No
126A-84 2026‑40 S1041 1 1 10/01/2026 No
126A-85 2026‑40 S1041 1 1 10/01/2026 No
126A-86 2026‑40 S1041 1 1 10/01/2026 No
126A-90 Art. 9 2026‑40 S1041 1 1 10/01/2026 No
126A-91 2026‑40 S1041 1 1 10/01/2026 No
126A-92 2026‑40 S1041 1 1 10/01/2026 No
126A-93 2026‑40 S1041 1 1 10/01/2026 No
126A-94 2026‑40 S1041 1 1 10/01/2026 No
126A-100 Art. 10 2026‑40 S1041 1 1 10/01/2026 No
126A-101 2026‑40 S1041 1 1 10/01/2026 No
126A-102 2026‑40 S1041 1 1 10/01/2026 No
126A-103 2026‑40 S1041 1 1 10/01/2026 No
126A-104 2026‑40 S1041 1 1 10/01/2026 No
126A-104.5 2026‑40 S1041 5.8(a) 5.8 10/01/2026 No
126A-105 2026‑40 S1041 1 1 10/01/2026 No
126A-110 Art. 11 2026‑40 S1041 1 1 10/01/2026 No
126A-111 2026‑40 S1041 1 1 10/01/2026 No
126A-111 (e) 2026‑40 S1041 5.9(k) 5.9 10/01/2026 No
126A-112 2026‑40 S1041 1 1 10/01/2026 No
126A-120 Art. 12 2026‑40 S1041 1 1 10/01/2026 No
126A-121 2026‑40 S1041 1 1 10/01/2026 No
126A-122 2026‑40 S1041 1 1 10/01/2026 No
126A-123 2026‑40 S1041 1 1 10/01/2026 No
126A-131 Art. 13 2026‑40 S1041 1 1 10/01/2026 No
126A-132 2026‑40 S1041 1 1 10/01/2026 No
126A-133 2026‑40 S1041 1 1 10/01/2026 No
126A-134 2026‑40 S1041 1 1 10/01/2026 No
126A-140 Art. 14 2026‑40 S1041 1 1 10/01/2026 No
126A-141 2026‑40 S1041 1 1 10/01/2026 No
126A-142 2026‑40 S1041 1 1 10/01/2026 No
126A-143 2026‑40 S1041 1 1 10/01/2026 No
126A-144 2026‑40 S1041 1 1 10/01/2026 No
126A-145 2026‑40 S1041 1 1 10/01/2026 No
126A-150 Art. 15 2026‑40 S1041 1 1 10/01/2026 No
126A-151 2026‑40 S1041 1 1 10/01/2026 No
126A-152 2026‑40 S1041 1 1 10/01/2026 No
126A-153 2026‑40 S1041 1 1 10/01/2026 No
126A-160 Art. 16 2026‑40 S1041 1 1 10/01/2026 No
126A-161 2026‑40 S1041 1 1 10/01/2026 No
126A-161 2026‑40 S1041 5.9(a) 5.9 10/01/2026 No
126A-162 2026‑40 S1041 1 1 10/01/2026 No
126A-162.1 2026‑40 S1041 1 1 10/01/2026 No
126A-163 2026‑40 S1041 1 1 10/01/2026 No
126A-164 2026‑40 S1041 1 1 10/01/2026 No
126A-165 2026‑40 S1041 1 1 10/01/2026 No
126A-166 2026‑40 S1041 1 1 10/01/2026 No
127A-19 2026‑41 S257 19.8(a) 19.8 07/07/2026 No
127A-19 (a), (a1) 2026‑53 H206 8(a) 8 07/07/2026 No
127A-40 2026‑41 S257 41.28(a) 41.9J 01/01/2027 No
127A-40.1 2026‑50 H1126 3.1(o) 3.1 07/07/2026 No
127A-50 2025‑51 S710 8(a) 8 07/02/2025 Yes
127A-50.1 2025‑51 S710 8(b) 8 07/02/2025 Yes
127A-56 2025‑51 S710 8(c) 8 07/02/2025 Yes
127A-57 2025‑51 S710 8(d) 8 07/02/2025 Yes
127A-59 2025‑51 S710 8(e) 8 07/02/2025 Yes
127A-60 2025‑51 S710 8(f) 8 07/02/2025 Yes
127A-65 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
128-15 (d) 2026‑40 S1041 4.48 4.9 10/01/2026 No
128-21 (7a) 2026‑50 H1126 3.3(b) 3.3 07/01/2025 No
128-21 Art. 3, Part 1 1 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-21 2 2025‑11 H477 6(a) 6 06/13/2025 Yes
128-22 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-23 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-23.1 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-24 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-24 (6) 2026‑40 S1041 4.49 4.9 10/01/2026 No
128-24 (a) 2025‑11 H477 10(b) 10 06/13/2025 Yes
128-26 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-26 (a2) 2026‑50 H1126 1.1(c) 1.1 01/01/2027 No
128-26 (e) 2026‑50 H1126 4.1(k) 4.1 01/01/2027 No
128-26.1 2025‑19 H476 7.4 7.4 06/26/2025 Yes
128-26.1 2025‑25 H40 37 37 06/26/2025 Yes
128-26.5 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-26A 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-26A 2025‑19 H476 7.4 7.4 06/26/2025 Yes
128-26A 2025‑25 H40 37 37 06/26/2025 Yes
128-27 (a3) 2026‑50 H1126 1.3(b) 1.3 07/07/2026 No
128-27 (c) 2026‑50 H1126 4.1(i) 4.1 01/01/2027 No
128-27 (f) 2026‑50 H1126 4.9(c) 4.9 07/07/2026 No
128-27 (g) 2026‑50 H1126 4.5(a) 4.5 07/07/2026 No
128-27 (m)(2) 2026‑50 H1126 1.10(b) 1.10 07/07/2026 No
128-27 0 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-27 (l) 01 2025‑11 H477 4(b) 4.2 06/13/2025 Yes
128-27 (l) 02 2025‑11 H477 4(c) 4.3 06/13/2025 Yes
128-27 (l) 03 2025‑11 H477 4(d) 4.4 06/13/2025 Yes
128-27 (l) 05 2025‑11 H477 4(e) 4.6 06/13/2025 Yes
128-27 (l) 06 2025‑11 H477 4(g) 4.62 06/13/2025 Yes
128-27 (l) 07 2025‑11 H477 4(h) 4.63 06/13/2025 Yes
128-27 (l) 08 2025‑11 H477 4(i) 4.64 06/13/2025 Yes
128-27 (l) 09 2025‑11 H477 4(q) 4.73 06/13/2025 Yes
128-27 (l) 10 2025‑11 H477 5(a) 5 06/13/2025 Yes
128-27 (l)(2)a. 12 2025‑11 H477 4(j) 4.65 06/13/2025 Yes
128-27 (l)(2)b. 13 2025‑11 H477 4(k) 4.67 06/13/2025 Yes
128-27 (l)(2)c. 14 2025‑11 H477 4(l) 4.68 06/13/2025 Yes
128-27 (l)(3) 15 2025‑11 H477 4(m) 4.69 06/13/2025 Yes
128-27 (l)(4) 16 2025‑11 H477 4(n) 4.70 06/13/2025 Yes
128-27 (l1) 16.1 2025‑11 H477 4(f) 4.61 06/13/2025 Yes
128-27 (l1) 16.5 2025‑11 H477 5(a) 5 06/13/2025 Yes
128-27 (l2), (l3), (l4), (l5) 16.7 2025‑11 H477 5(b) 5 06/13/2025 Yes
128-27 (l6) 17 2025‑11 H477 4(o) 4.71 06/13/2025 Yes
128-27 (l6) 18 2025‑11 H477 4(p) 4.72 06/13/2025 Yes
128-27 (l6) 20 2025‑11 H477 5(a) 5 06/13/2025 Yes
128-27 (m) 21 2025‑11 H477 9(b) 9 06/13/2025 Yes
128-28 2026‑50 H1126 1.7(b) 1.7 07/07/2026 No
128-28 (c) 2026‑41 S257 5.10(c1) 5.91.4 07/01/2027 No
128-28 (d) 2026‑50 H1126 1.9(b) 1.9 07/07/2026 No
128-28 (d), (e), (f) 2026‑41 S257 5.10(c2) 5.91.5 07/01/2027 No
128-28 (h1)(1) 2026‑42 H56 6.1(b) 6.1C 10/01/2026 No
128-28 (k) 2026‑50 H1126 1.8(c) 1.8 07/07/2026 No
128-28 (f1) 04 2025‑11 H477 4(d1) 4.45 06/13/2025 Yes
128-28 1 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-28 2 2025‑25 H40 18(a) 18 06/26/2025 Yes
128-28 (c) 3 2025‑19 H476 7.3 7.3 06/26/2025 Yes
128-28.1 2026‑41 S257 5.10(c) 5.91.3 07/01/2027 No
128-29 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-29 (c) 2025‑6 H506 4.1(a) 4.2 01/01/2026 Yes
128-29 (g) 2026‑50 H1126 1.11(b) 1.11 07/01/2026 No
128-29 (g)(2) 2025‑19 H476 7.6(b) 7.6 06/26/2025 Yes
128-30 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-30 (g) 2025‑11 H477 11(b) 11 06/13/2025 Yes
128-31 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-31 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
128-31 (b) 2026‑50 H1126 1.2(b) 1.2 07/07/2026 No
128-32.1 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-32.1 (a) 2026‑50 H1126 4.5(c) 4.5 07/07/2026 No
128-33 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-33.1 (a) 2026‑40 S1041 4.50 4.9 10/01/2026 No
128-34 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-35 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-36 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-37 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-37.1 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-37.2 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.1 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.2 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.3 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.4 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.4A 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.4A (c) 2025‑19 H476 2.1(b) 2.1 06/26/2025 Yes
128-38.4B 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.5 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.6 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.10 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.29 2025‑11 H477 4(a) 4 06/13/2025 Yes
128-38.30 Art. 3, Part 2 1 2025‑11 H477 4(a1) 4.1 06/13/2025 Yes
128-38.30 Art. 3, Part 2 2 2025‑11 H477 6(b) 6 06/13/2025 Yes
128-38.30 (a) 3 2025‑11 H477 4(b) 4.2 06/13/2025 Yes
128-38.30 (b) 4 2025‑11 H477 4(c) 4.3 06/13/2025 Yes
128-38.31 1 2025‑11 H477 4(a1) 4.1 06/13/2025 Yes
128-38.31 2 2025‑11 H477 6(b) 6 06/13/2025 Yes
128-38.31 (a) 3 2025‑11 H477 4(d) 4.4 06/13/2025 Yes
128-38.31 (b) 4 2025‑11 H477 4(d1) 4.45 06/13/2025 Yes
128-38.35 1 2025‑11 H477 4(a1) 4.1 06/13/2025 Yes
128-38.35 2 2025‑11 H477 6(b) 6 06/13/2025 Yes
128-38.35 (a) 3 2025‑11 H477 4(e) 4.6 06/13/2025 Yes
128-38.35 (a) 4 2025‑11 H477 4(f) 4.61 06/13/2025 Yes
128-38.35 (b) 5 2025‑11 H477 4(g) 4.62 06/13/2025 Yes
128-38.35 (c) 6 2025‑11 H477 4(h) 4.63 06/13/2025 Yes
128-38.35 (d) 7 2025‑11 H477 4(i) 4.64 06/13/2025 Yes
128-38.36 1 2025‑11 H477 4(a1) 4.1 06/13/2025 Yes
128-38.36 2 2025‑11 H477 6(b) 6 06/13/2025 Yes
128-38.36 (1) 3 2025‑11 H477 4(k) 4.67 06/13/2025 Yes
128-38.36 (2)a. 4 2025‑11 H477 4(l) 4.68 06/13/2025 Yes
128-38.36 (2)b. 5 2025‑11 H477 4(m) 4.69 06/13/2025 Yes
128-38.36 (2)c. 6 2025‑11 H477 4(n) 4.70 06/13/2025 Yes
128-38.36 (3) 7 2025‑11 H477 4(j) 4.65 06/13/2025 Yes
128-38.40 (a) 2026‑50 H1126 4.9(g) 4.9 07/07/2026 No
128-38.40 1 2025‑11 H477 4(a1) 4.1 06/13/2025 Yes
128-38.40 2 2025‑11 H477 6(b) 6 06/13/2025 Yes
128-38.40 (b) 3 2025‑11 H477 4(o) 4.71 06/13/2025 Yes
128-38.40 (c) 4 2025‑11 H477 4(p) 4.72 06/13/2025 Yes
128-38.45 2025‑11 H477 4(a1) 4.1 06/13/2025 Yes
128-38.45 2025‑11 H477 6(b) 6 06/13/2025 Yes
128-38.46 2025‑11 H477 4(a1) 4.1 06/13/2025 Yes
128-38.46 2025‑11 H477 4(q) 4.73 06/13/2025 Yes
128-38.46 2025‑11 H477 6(b) 6 06/13/2025 Yes
130A-4 (d) 2026‑32 H376 11 11 07/02/2026 No
130A-4.3 (b) 2025‑27 H576 1.1 1.1 06/27/2025 Yes
130A-22 (b3) 2025‑60 S600 3(b) 3 07/03/2025 Yes
130A-26.2 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-33.50 (b) 2025‑27 H576 4.3(a) 4.3 06/27/2025 Yes
130A-33.65 2026‑41 S257 9H.8(a) 9H.8 07/01/2026 No
130A-33.66 2026‑41 S257 9H.8(a) 9H.8 07/01/2026 No
130A-35 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-37 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-39 (b) 2025‑94 H926 16 16 10/06/2025 Yes
130A-39 (b) 2026‑32 H376 8(c) 8 07/02/2026 No
130A-41 (b)(12) 2026‑40 S1041 4.51 4.9 10/01/2026 No
130A-45.1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-45.12 2026‑40 S1041 4.52 4.9 10/01/2026 No
130A-50 (h) 2025‑50 H768 2 2 07/02/2025 Yes
130A-64.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
130A-64.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-97 2025‑27 H576 4.4 4.4 06/27/2025 Yes
130A-99 (a) 2025‑9 S248 2 2 01/01/2026 Yes
130A-101 (f) 2025‑75 H992 4 4 12/01/2025 Yes
130A-118 (a1) 2025‑44 H537 3(a) 3 07/01/2025 Yes
130A-118 (a2) 2025‑44 H537 4(a), (b) 4 07/01/2025 Yes
130A-118 (f) 2025‑84 H805 4(a) 4 12/01/2025 Yes
130A-125 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-126 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-128.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-131.7 (7) 2026‑41 S257 9H.9(a) 9H.9 01/01/2027 No
130A-131.9C (i) 2026‑41 S257 9H.9(b) 9H.9 01/01/2027 No
130A-131.31 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
130A-131.32 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-131.33 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-131.35 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-213 2025‑27 H576 4.3(b) 4.3 06/27/2025 Yes
130A-215.5 2025‑27 H576 4.5 4.5 06/27/2025 Yes
130A-248 (c4) 2025‑94 H926 13 13 10/06/2025 Yes
130A-280 2025‑94 H926 17 17 10/06/2025 Yes
130A-290 (a)(9) 2026‑41 S257 12.17 12.990 07/01/2026 No
130A-309.05 2026‑41 S257 12.18(a) 12.991 01/01/2027 No
130A-309.06 (c)(10) 2025‑66 S706 1(d) 1 10/01/2025 Yes
130A-309.06 (c)(8) 2026‑41 S257 12.15(e) 12.97 07/01/2026 No
130A-309.09C (g) 2025‑66 S706 1(e) 1 10/01/2025 Yes
130A-309.09C (g) 2026‑41 S257 12.15(d) 12.96 07/01/2026 No
130A-309.11 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-309.22 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-309.28 2025‑92 H358 2.11(o) 2.11 09/30/2025 Yes
130A-309.54 2025‑66 S706 1(f) 1 10/01/2025 Yes
130A-309.63 2025‑66 S706 1(b) 1 10/01/2025 Yes
130A-309.63 (b)(2) 2026‑41 S257 12.15(c) 12.95 07/01/2026 No
130A-309.63 (b)(4) 2026‑41 S257 12.15(b) 12.94 07/01/2026 No
130A-309.64 2025‑66 S706 1(c) 1 10/01/2025 Yes
130A-309.131 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
130A-309.136 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-309.138 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
130A-309.138 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-309.207 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-309.213 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
130A-309.213 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-309.214 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
130A-309.214 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-310.39 2025‑53 S387 2 2 07/02/2025 Yes
130A-310.54 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-334 2026‑32 H376 9(a) 9 07/02/2026 No
130A-335 2026‑32 H376 7(a) 7 07/02/2026 No
130A-335 (f) 2026‑32 H376 9(b) 9 07/02/2026 No
130A-336 (b) 2026‑32 H376 7(b) 7 07/02/2026 No
130A-336.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
130A-336.1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-336.1 (e)(1) 2026‑32 H376 9(c) 9 07/02/2026 No
130A-336.2 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
130A-337 2026‑32 H376 7(c) 7 07/02/2026 No
130A-343 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
130A-343 (g) 2026‑32 H376 10(a) 10 07/02/2026 No
130A-343 (j3) 2025‑94 H926 30 30 10/06/2025 Yes
130A-382 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-385 2025‑70 S429 2(a) 2 10/01/2025 Yes
130A-385 (e) 2025‑28 H568 1.4 1.4 06/27/2025 Yes
130A-387 2026‑41 S257 9H.4(a) 9H.4 07/01/2026 No
130A-389 (a) 2025‑70 S429 2(b) 2 10/01/2025 Yes
130A-389.1 (a), (d) 2025‑70 S429 2(c) 2 10/01/2025 Yes
130A-412.7 (a)(1a), (c3) 2025‑60 S600 2(c) 2 01/01/2027 Yes
130A-412.16 (h) 2026‑48 S857 63 63 10/01/2026 No
130A-412.22 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-415 (j) 2025‑76 H1003 1.16 1.16 10/01/2025 Yes
130A-420 (a) 2026‑48 S857 64 64 10/01/2026 No
130A-453.40 Art. 19C 2025‑60 S600 3(a) 3 07/03/2025 Yes
130A-453.41 2025‑60 S600 3(a) 3 07/03/2025 Yes
130A-453.42 2025‑60 S600 3(a) 3 07/03/2025 Yes
130A-453.42 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
130A-465 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
130A-469 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
130A-480 2025‑25 H40 29(4) 29 06/26/2025 Yes
130A-480 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
130A-485 (f)(3) 2026‑41 S257 5A.20 5A.20 07/01/2026 No
130A-511 (b)(1) 2026‑34 H83 3(c) 3 07/02/2026 No
131A-3 2025‑25 H40 38(a) 38 06/26/2025 Yes
131A-32 2026‑50 H1126 3.1(p) 3.1 07/07/2026 No
131A-32 2026‑41 S257 25.1(d) 25.1 07/01/2026 No
131D-2.3 2025‑27 H576 3.1 3.1 06/27/2025 Yes
131D-2.5 (b) 2025‑27 H576 3.2(a) 3.2 12/01/2025 Yes
131D-2.6 2025‑27 H576 3.2(b) 3.2 12/01/2025 Yes
131D-2.11 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131D-2.11 (d) 2026‑41 S257 9F.3(a) 9F.3 10/01/2026 No
131D-2.16 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
131D-4.2 2026‑41 S257 9F.2(a) 9F.2 07/01/2026 No
131D-4.5C 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131D-6.1 (c) 2026‑1 H696 3E.1(a) 3 07/01/2026 Yes
131D-10 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131D-10.3A (f) 2025‑27 H576 5.3(b) 5.3 06/27/2025 Yes
131D-34 (g), (i) 2025‑25 H40 24(j) 24 06/26/2025 Yes
131E-76 (1c) 2025‑27 H576 3.3(a) 3.3 06/27/2025 Yes
131E-78.4 2025‑37 H67 8(a) 8 01/01/2026 Yes
131E-78.4 2026‑41 S257 9F.1(a) 9F.1 07/07/2026 No
131E-78.5 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131E-84 (a2) 2025‑18 H251 5 5 06/26/2025 Yes
131E-88.2 2025‑27 H576 3.3(b) 3.3 06/27/2025 Yes
131E-129 (f) 2025‑25 H40 24(k) 24 06/26/2025 Yes
131E-131 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
131E-147.2 2025‑37 H67 8(b) 8 01/01/2026 Yes
131E-147.2 2026‑41 S257 9F.1(b) 9F.10 07/07/2026 No
131E-147.5 (c) 2025‑89 H125 2B.11(a) 2 11/21/2025 Yes
131E-154.12 Art. 6, Part 6 2025‑27 H576 3.4 3.4 06/27/2025 Yes
131E-154.13 2025‑27 H576 3.4 3.4 06/27/2025 Yes
131E-154.14 2025‑27 H576 3.4 3.4 06/27/2025 Yes
131E-155.2 2025‑42 H975 2(b) 2 See Bill Yes
131E-158 (c) 2025‑42 H975 1(a) 1 07/01/2025 Yes
131E-176 2026‑41 S257 9F.4(a) 9F.4 10/01/2026 No
131E-176 1 2025‑25 H40 39.2(a) 39.2 06/26/2025 Yes
131E-176 (5a), (5c) 2 2025‑25 H40 39.1(a) 39.1 06/26/2025 Yes
131E-176 (7a) 2.5 2025‑25 H40 39.3(a) 39.3 11/21/2026 Yes
131E-176 (7e), (10) 3 2025‑25 H40 39.1(b) 39.1 06/26/2025 Yes
131E-176 (9b) 3.5 2025‑25 H40 39.4(a) 39.4 11/21/2026 Yes
131E-176 (13), (13d) 4 2025‑25 H40 39.1(c) 39.1 06/26/2025 Yes
131E-176 (14o) 7 2025‑25 H40 39.3(b) 39.3 11/21/2026 Yes
131E-176 (16)f1.7. 8 2025‑25 H40 39.3(c) 39.3 11/21/2026 Yes
131E-176.2 2025‑25 H40 39.2(b) 39.2 06/26/2025 Yes
131E-177 2025‑25 H40 39.2(c) 39.2 06/26/2025 Yes
131E-214.12 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131E-214.13 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131E-214.14 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131F-9 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
131F-9 (b)(4) 2026‑52 H517 7 7 07/07/2026 No
131F-10 2025‑25 H40 29(1) 29 06/26/2025 Yes
131F-30 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
131F-33 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
132-1.2 (11) 2025‑46 H378 8(a) 8 07/01/2025 Yes
132-1.3B 2026‑41 S257 8.14(a) 8.93 07/07/2026 No
132-1.4 (a) 2026‑41 S257 16.10(f) 16.95 07/01/2026 No
132-1.4 (c)(4) 2025‑70 S429 21 21 07/09/2025 Yes
132-1.4 (g) 2026‑41 S257 16.20(t) 16.999S 07/01/2027 No
132-1.4A (b) 2026‑40 S1041 4.53 4.9 10/01/2026 No
132-1.5 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
132-1.8 2025‑70 S429 2(d) 2 10/01/2025 Yes
132-1.10 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
132-1.10 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
132-1.10 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
132-1.11A 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
132-1.13 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
132-1.14 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
133-1.1 2026‑9 H1123 5.1(b) 5.1 06/19/2026 No
135-1 (7a) 1 2026‑50 H1126 3.3(a) 3.3 07/01/2025 No
135-1 (17a) 2 2026‑44 S355 3.1(a) 3.1 07/07/2026 No
135-3 (a)(7)a. 2026‑50 H1126 4.1(d) 4.1 01/01/2027 No
135-3 (a)(7)b. 2026‑50 H1126 4.1(e) 4.1 01/01/2027 No
135-3 (a)(8) 2025‑19 H476 5.1(b) 5.1 06/26/2025 Yes
135-3 (a)(8)a. 2026‑50 H1126 4.1(f) 4.1 01/01/2027 No
135-3 (a)(8)b. 2026‑50 H1126 4.1(g) 4.1 01/01/2027 No
135-3 (a)(8)c. 2026‑50 H1126 1.4(a) 1.4 07/01/2026 No
135-3 (a)(8)d. 2026‑50 H1126 1.4(b) 1.4 07/01/2026 No
135-3 (b) 2025‑19 H476 5.1(c) 5.1 06/26/2025 Yes
135-3 (c) 2026‑40 S1041 4.54 4.9 10/01/2026 No
135-3 (d)(2) 2026‑50 H1126 4.3 4.3 07/07/2026 No
135-3 (c) 01 2025‑11 H477 10(a) 10 06/13/2025 Yes
135-4 (e) 2026‑50 H1126 4.1(j) 4.1 01/01/2027 No
135-4 (g) 2026‑50 H1126 1.1(a) 1.1 01/01/2027 No
135-5 (hh) 2025‑19 H476 5.1(d) 5.1 06/26/2025 Yes
135-5 (l) 02 2025‑11 H477 1(h) 1.65 06/13/2025 Yes
135-5 (l) 03 2025‑11 H477 1(i) 1.66 06/13/2025 Yes
135-5 (l) 04 2025‑11 H477 1(j) 1.67 06/13/2025 Yes
135-5 (l) 05 2025‑11 H477 1(k) 1.69 06/13/2025 Yes
135-5 (l) 06 2025‑11 H477 1(l) 1.70 06/13/2025 Yes
135-5 (l) 07 2025‑11 H477 1(m) 1.71 06/13/2025 Yes
135-5 (l) 08 2025‑11 H477 1(s) 1.77 06/13/2025 Yes
135-5 (l) 09 2025‑11 H477 1(t) 1.78 06/13/2025 Yes
135-5 1 2026‑50 H1126 4.1(c) 4.1 01/01/2027 No
135-5 (l) 10 2025‑11 H477 1(u) 1.78 06/13/2025 Yes
135-5 (l) 11 2025‑11 H477 1(v) 1.79 06/13/2025 Yes
135-5 (l) 12 2025‑11 H477 1(w) 1.80 06/13/2025 Yes
135-5 (l) 13 2025‑11 H477 1(z) 1.83 06/13/2025 Yes
135-5 (l) 14 2025‑11 H477 2(b) 2.1 06/13/2025 Yes
135-5 (l)(2)a. 15 2025‑11 H477 1(n) 1.72 06/13/2025 Yes
135-5 (l)(2)b. 16 2025‑11 H477 1(o) 1.73 06/13/2025 Yes
135-5 (l)(2)c. 17 2025‑11 H477 1(p) 1.74 06/13/2025 Yes
135-5 (l)(3) 18 2025‑11 H477 1(q) 1.75 06/13/2025 Yes
135-5 (l)(4) 19 2025‑11 H477 1(r) 1.76 06/13/2025 Yes
135-5 (a3) 2 2026‑50 H1126 1.3(a) 1.3 07/07/2026 No
135-5 (l1) 20 2025‑11 H477 1(x) 1.81 06/13/2025 Yes
135-5 (l1) 21 2025‑11 H477 1(y) 1.82 06/13/2025 Yes
135-5 (l1) 22 2025‑11 H477 1(aa) 1.84 06/13/2025 Yes
135-5 (m) 23 2025‑11 H477 9(a) 9 06/13/2025 Yes
135-5 (e) 3 2026‑50 H1126 4.1(o) 4.1 01/01/2027 No
135-5 (e) 4 2026‑50 H1126 4.1(q) 4.1 01/01/2027 No
135-5 (f) 5 2026‑50 H1126 4.9(b) 4.9 07/07/2026 No
135-5 (g) 6 2026‑50 H1126 4.5(a) 4.5 07/07/2026 No
135-5 (m)(2) 7 2026‑50 H1126 1.10(a) 1.10 07/07/2026 No
135-5 (m1) 8 2026‑50 H1126 4.1(a) 4.1 01/01/2027 No
135-5 (m2) 9 2026‑50 H1126 4.1(b) 4.1 01/01/2027 No
135-5 (aaaa) 9.4 2026‑41 S257 41.26(a) 41.9E 07/01/2026 No
135-5.1 (a)(3) 2026‑40 S1041 4.55 4.9 10/01/2026 No
135-5.1 (a)(4) 2025‑19 H476 5.1(e) 5.1 06/26/2025 Yes
135-5.3 2025‑19 H476 1.1 1.1 06/26/2025 Yes
135-5.6 (a) 2025‑19 H476 8(a) 8 06/26/2025 Yes
135-5.7 (b) 2025‑19 H476 8(b) 8 06/26/2025 Yes
135-6 2026‑50 H1126 1.7(a) 1.7 07/07/2026 No
135-6 (b) 2026‑41 S257 5.10(d1) 5.91.7 07/01/2027 No
135-6 (c) 2026‑50 H1126 1.9(a) 1.9 07/07/2026 No
135-6 (c), (d), (e) 2026‑41 S257 5.10(d2) 5.91.75 07/01/2027 No
135-6 (g1)(1) 2026‑42 H56 6.1(b) 6.1B 10/01/2026 No
135-6 (j) 2026‑50 H1126 1.8(b) 1.8 07/07/2026 No
135-6 (k) 2026‑50 H1126 4.1(l) 4.1 01/01/2027 No
135-6 (u), (j) 2026‑50 H1126 1.8(a) 1.8 07/07/2026 No
135-6 01 2025‑25 H40 18(b) 18 06/26/2025 Yes
135-6 (e1) 02 2025‑11 H477 1(j1) 1.68 06/13/2025 Yes
135-6.1 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027 No
135-6.1 (a) 2026‑40 S1041 4.56 4.9 10/01/2026 No
135-6.2 2026‑41 S257 5.10(d) 5.91.6 07/01/2027 No
135-7 2025‑25 H40 42.1 42.1 06/26/2025 Yes
135-7 (h) 2026‑50 H1126 1.11(a) 1.11 07/01/2026 No
135-7 (c) 01 2025‑6 H506 4.2(b) 4.2 01/01/2026 Yes
135-7 (g) 03 2025‑11 H477 1(c) 1.20 06/13/2025 Yes
135-7 (g) 03.5 2025‑11 H477 2(a) 2 06/13/2025 Yes
135-7 (g)(2) 04 2025‑11 H477 1(b) 1.10 06/13/2025 Yes
135-7 (g)(2) 04.5 2025‑11 H477 1(d) 1.30 06/13/2025 Yes
135-7 (g)(3) 05 2025‑11 H477 1(e) 1.40 06/13/2025 Yes
135-7 (g)(3) 06 2025‑11 H477 1(f) 1.50 06/13/2025 Yes
135-7 (g)(3) 07 2025‑11 H477 1(g) 1.60 06/13/2025 Yes
135-7 (h)(2) 08 2025‑19 H476 7.6(a) 7.6 06/26/2025 Yes
135-8 (f) 2025‑11 H477 11(a) 11 06/13/2025 Yes
135-8 (f), (j) 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027 No
135-9 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
135-9 (b) 2026‑50 H1126 1.2(a) 1.2 07/07/2026 No
135-10.1 (a) 2026‑50 H1126 4.5(b) 4.5 07/07/2026 No
135-10.1 (b) 2026‑50 H1126 4.1(c) 4.1 01/01/2027 No
135-13.1 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027 No
135-18.10A (c) 2025‑19 H476 2.1(a) 2.1 06/26/2025 Yes
135-27 (e)(3) 2025‑19 H476 5.1(f) 5.1 06/26/2025 Yes
135-28.1 (e) 2026‑50 H1126 4.1(c) 4.1 01/01/2027 No
135-48.1 (2a), (2c) 2025‑25 H40 17(b) 17 06/26/2025 Yes
135-48.12 2026‑41 S257 5.10(f) 5.91.91 07/07/2026 No
135-48.23 (a) 2026‑40 S1041 4.57 4.9 10/01/2026 No
135-48.30 (a)(20) 2025‑19 H476 7.8 7.8 06/26/2025 Yes
135-48.36 2025‑69 S479 10(a) 10 10/01/2025 Yes
135-48.38 (a) 2026‑50 H1126 2.2 2.2 07/07/2026 No
135-48.40 (d)(10) 2025‑19 H476 7.5 7.5 06/26/2025 Yes
135-48.41 (d) 2026‑50 H1126 4.1(m) 4.1 01/01/2027 No
135-48.43 (d) 2026‑50 H1126 2.1(a) 2.1 08/06/2026 No
135-48.54 (b)(2) 2025‑19 H476 7.7 7.7 06/26/2025 Yes
135-52 (c) 2025‑11 H477 7(b) 7 06/13/2025 Yes
135-53 (3a) 2025‑11 H477 7(a) 7 06/13/2025 Yes
135-63 1 2025‑11 H477 7(d) 7 06/13/2025 Yes
135-63 (b), (d) 2 2025‑11 H477 7(c) 7 06/13/2025 Yes
135-64 1 2025‑11 H477 7(f) 7 06/13/2025 Yes
135-64 (f) - (j) 2 2025‑11 H477 7(e) 7 06/13/2025 Yes
135-65 (ll) 2026‑41 S257 41.26(b) 41.9F 07/01/2026 No
135-66 (a) 2026‑50 H1126 3.1(q) 3.1 07/07/2026 No
135-75.1A (c) 2025‑19 H476 2.1(c) 2.1 06/26/2025 Yes
135-96 2026‑41 S257 5.10(e) 5.91.9 07/01/2027 No
135-96 (f) 2026‑50 H1126 1.9(c) 1.9 07/07/2026 No
135-106 2026‑50 H1126 4.4(b) 4.4 07/07/2026 No
135-108 2026‑50 H1126 4.4(c) 4.4 07/07/2026 No
135-109 2026‑50 H1126 4.2 4.2 07/07/2026 No
135-110 (d) 2026‑50 H1126 3.1(r) 3.1 07/07/2026 No
135-151 (d) 2025‑89 H125 3.6(d) 3.6 07/01/2025 Yes
135-153 Art. 8 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-153 Art. 8 2025‑11 H477 3 3 06/13/2025 Yes
135-154 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
135-154 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-154 2 2025‑11 H477 3 3 06/13/2025 Yes
135-154 (a) 3 2025‑11 H477 1(b) 1.10 06/13/2025 Yes
135-154 (a) 4 2025‑11 H477 1(c) 1.20 06/13/2025 Yes
135-154 (b) 5 2025‑11 H477 1(d) 1.30 06/13/2025 Yes
135-154 (c) 6 2025‑11 H477 1(e) 1.40 06/13/2025 Yes
135-154 (c) 7 2025‑11 H477 1(f) 1.50 06/13/2025 Yes
135-154 (d) 8 2025‑11 H477 1(g) 1.60 06/13/2025 Yes
135-154 (e) 9 2025‑11 H477 16(a) 16 07/01/2025 Yes
135-155 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-155 2 2025‑11 H477 3 3 06/13/2025 Yes
135-155 (a) 3 2025‑11 H477 1(h) 1.65 06/13/2025 Yes
135-155 (b) 4 2025‑11 H477 1(i) 1.66 06/13/2025 Yes
135-160 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-160 2 2025‑11 H477 3 3 06/13/2025 Yes
135-160 (b) 3 2025‑11 H477 1(j1) 1.68 06/13/2025 Yes
135-160 (a) 4 2025‑11 H477 1(j) 1.67 06/13/2025 Yes
135-165 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-165 2 2025‑11 H477 3 3 06/13/2025 Yes
135-165 (b) 3 2025‑11 H477 1(k) 1.69 06/13/2025 Yes
135-165 (c) 4 2025‑11 H477 1(l) 1.70 06/13/2025 Yes
135-165 (d) 5 2025‑11 H477 1(m) 1.71 06/13/2025 Yes
135-170 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-170 2 2025‑11 H477 3 3 06/13/2025 Yes
135-170 (1) 3 2025‑11 H477 1(o) 1.73 06/13/2025 Yes
135-170 (2)a. 4 2025‑11 H477 1(p) 1.74 06/13/2025 Yes
135-170 (2)b. 5 2025‑11 H477 1(q) 1.75 06/13/2025 Yes
135-170 (2)c. 6 2025‑11 H477 1(r) 1.76 06/13/2025 Yes
135-170 (3) 7 2025‑11 H477 1(n) 1.72 06/13/2025 Yes
135-175 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-175 2 2025‑11 H477 3 3 06/13/2025 Yes
135-175 (b) 3 2025‑11 H477 1(s) 1.77 06/13/2025 Yes
135-175 (c) 4 2025‑11 H477 1(t) 1.78 06/13/2025 Yes
135-180 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-180 2 2025‑11 H477 3 3 06/13/2025 Yes
135-180 (a) 3 2025‑11 H477 1(u) 1.78 06/13/2025 Yes
135-180 (c) 4 2025‑11 H477 1(v) 1.79 06/13/2025 Yes
135-180 (d) 5 2025‑11 H477 1(w) 1.80 06/13/2025 Yes
135-185 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-185 2025‑11 H477 3 3 06/13/2025 Yes
135-190 1 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-190 2 2025‑11 H477 3 3 06/13/2025 Yes
135-190 (a) 3 2025‑11 H477 1(x) 1.81 06/13/2025 Yes
135-190 (b) 4 2025‑11 H477 1(y) 1.82 06/13/2025 Yes
135-195 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-195 2025‑11 H477 1(z) 1.83 06/13/2025 Yes
135-195 2025‑11 H477 3 3 06/13/2025 Yes
135-200 2025‑11 H477 1(a) 1 06/13/2025 Yes
135-200 2025‑11 H477 1(aa) 1.84 06/13/2025 Yes
135-200 2025‑11 H477 3 3 06/13/2025 Yes
136-4 2026‑40 S1041 4.58 4.9 10/01/2026 No
136-12 (a) 2025‑47 S391 10 10 07/01/2025 Yes
136-17.3 2026‑41 S257 43.21(a) 43.21 07/01/2026 No
136-18 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
136-18 (39a)a. 2025‑47 S391 16 16 07/01/2025 Yes
136-18 (9) 1 2026‑46 H1094 27(a) 27 10/01/2026 No
136-18 (10) 2 2026‑46 H1094 25 25 07/07/2026 No
136-18.02 2026‑41 S257 43.21(b) 43.21B 07/01/2026 No
136-18.05 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
136-18.05 (b)(1a) 2026‑41 S257 43.23 43.23 07/01/2026 No
136-18.7 2026‑41 S257 43.20(i) 43.20I 07/01/2026 No
136-19.7 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
136-19.7 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
136-27.1 2025‑65 S664 6(a) 6 01/01/2025 Yes
136-28.12 (a)(3) 2025‑47 S391 15(b) 15 07/01/2025 Yes
136-32 (b) 2025‑47 S391 15(a) 15 07/01/2025 Yes
136-44.2F 2026‑41 S257 43.3 43.3 07/01/2026 No
136-44.18 2025‑47 S391 14(a) 14 07/01/2025 Yes
136-44.20 (b1) 2025‑39 H948 8.3 8.3 07/01/2025 Yes
136-44.27 (e), (f) 2025‑39 H948 8.4 8.4 07/01/2025 Yes
136-76.2 (c) 2025‑47 S391 8 8 07/01/2025 Yes
136-82 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
136-82 2026‑41 S257 43.15(a) 43.15 07/01/2026 No
136-82 (b3) 2026‑41 S257 43.15(b) 43.15 07/01/2028 No
136-89.56 2026‑46 H1094 15 15 07/07/2026 No
136-89.182 (k) 2026‑46 H1094 14(a) 14 07/07/2026 No
136-89.183 (a)(2) 2025‑47 S391 6 6 07/01/2025 Yes
136-89.183 (b) 2026‑46 H1094 14(b) 14 07/07/2026 No
136-89.193 2025‑47 S391 4 4 07/01/2025 Yes
136-89.195 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
136-89.211 2026‑46 H1094 13 13 07/07/2026 No
136-89.214 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
136-89.214 (a) 2025‑47 S391 5 5 07/01/2025 Yes
136-93 2026‑46 H1094 26(a) 26 07/07/2026 No
136-93 (b) 2026‑41 S257 43.20(f) 43.20F 07/01/2026 No
136-93.1 (e) 2026‑41 S257 43.21(c) 43.21C 07/01/2026 No
136-93.1A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
136-93.1A (f) 2026‑46 H1094 24(a) 24 10/01/2026 No
136-131.5 2026‑41 S257 43.20(a) 43.20 07/01/2026 No
136-133 (d) 2026‑41 S257 43.20(b) 43.20B 07/01/2026 No
136-133.1 2026‑41 S257 43.20(d) 43.20D 07/01/2026 No
136-133.1 (e) 2025‑47 S391 20(a) 20 07/01/2025 Yes
136-133.2 2026‑41 S257 43.20(e) 43.20E 07/01/2026 No
136-133.3 2026‑41 S257 43.20(g) 43.20G 07/01/2026 No
136-133.4 2026‑41 S257 43.20(h) 43.20H 07/01/2026 No
136-138 2026‑41 S257 43.20(c) 43.20C 07/01/2026 No
136-140.15 2026‑46 H1094 22(a) 22 07/07/2026 No
136-140.18 2026‑46 H1094 22(b) 22 07/07/2026 No
136-140.19 2026‑46 H1094 22(c) 22 07/07/2026 No
136-189.11 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
136-189.11 (d3) 2026‑41 S257 43.27(b) 43.27 01/01/2026 No
138-1 Art. 1 2026‑41 S257 41.27(a) 41.9H 07/01/2026 No
138-20 Art. 2 2026‑41 S257 41.27(b) 41.9I 07/01/2026 No
138A-3 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
138A-3 (70) 2025‑67 H23 5.2 5.2 07/07/2025 Yes
138A-3 (70) 2026‑40 S1041 4.59 4.9 10/01/2026 No
138A-11 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
138A-12 2026‑40 S1041 4.60 4.9 10/01/2026 No
138A-32 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
138A-36 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
140A-1 Chapter, title 1 2025‑25 H40 19(a) 19 06/26/2025 Yes
140A-1 Art. 1 2 2025‑25 H40 19(b) 19 06/26/2025 Yes
140A-2 2025‑25 H40 19(c) 19 06/26/2025 Yes
140A-5 2025‑25 H40 19(d) 19 06/26/2025 Yes
140A-6 2025‑25 H40 19(e) 19 06/26/2025 Yes
140A-15 Art. 2 1 2025‑25 H40 19(f) 19 06/26/2025 Yes
140A-15 2 2025‑25 H40 19(g) 19 06/26/2025 Yes
143-48 2026‑41 S257 22.5(g) 22.5D 07/01/2026 No
143-48.4 2026‑41 S257 22.5(x) 22.5V 07/01/2026 No
143-49.2 2025‑2 H47 5.4(a) 5.4 03/19/2025 Yes
143-53.1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-58.5 (b) 2026‑50 H1126 3.1(s) 3.1 07/07/2026 No
143-59 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143-63.1 2025‑25 H40 20 20 06/26/2025 Yes
143-64.8 Art. 3A, Part 4 2025‑2 H47 5.4(b) 5.4 03/19/2025 Yes
143-64.24 (10) 2025‑83 H549 1 1 07/29/2025 Yes
143-64.34 2026‑9 H1123 5.1(e) 5.1 06/19/2026 No
143-128 2026‑41 S257 22.5(h) 22.5e 07/01/2026 No
143-128 (g) 2026‑9 H1123 5.1(f) 5.1 06/19/2026 No
143-128.1 (b), (c) 2026‑41 S257 22.5(i) 22.5F 07/01/2026 No
143-128.1A (b), (c) 2026‑41 S257 22.5(j) 22.5G 07/01/2026 No
143-128.1B 2026‑41 S257 22.5(k) 22.5H 07/01/2026 No
143-128.1C 2026‑41 S257 22.5(l) 22.5I 07/01/2026 No
143-128.2 2026‑41 S257 22.5(x) 22.5W 07/01/2026 No
143-128.3 2026‑41 S257 22.5(x) 22.5X 07/01/2026 No
143-129 2026‑9 H1123 5.1(d) 5.1 06/19/2026 No
143-129 (h) 2025‑39 H948 8.5 8.5 07/01/2025 Yes
143-129.4 2026‑41 S257 22.5(m) 22.5J 07/01/2026 No
143-132 (a1) 2026‑41 S257 22.6 22.6 07/07/2026 No
143-134.1 (b1) 2026‑9 H1123 5.1(c) 5.1 06/19/2026 No
143-135.5 2026‑41 S257 22.5(n) 22.5K 07/01/2026 No
143-135.26 2026‑41 S257 5.12 5.93 07/01/2026 No
143-135.26 (9)b1. 2026‑41 S257 22.5(o) 22.5L 07/01/2026 No
143-136 (a2) 2025‑63 H559 3(a) 3 07/07/2025 Yes
143-136 (d) 2026‑41 S257 13.4(c) 13.92 01/01/2027 No
143-136.1 (b1) 2025‑63 H559 3(b) 3 07/07/2025 Yes
143-136.1 (d) 2026‑41 S257 13.4(d) 13.93 01/01/2027 No
143-137 2026‑41 S257 13.4(e) 13.94 01/01/2027 No
143-137.1 2026‑41 S257 13.4(f) 13.95 01/01/2027 No
143-138 2026‑41 S257 13.4(g) 13.96 01/01/2027 No
143-138 (b4) 2026‑11 S401 19(b) 19 07/01/2026 No
143-138.1 2026‑41 S257 13.4(h) 13.97 01/01/2027 No
143-139 2026‑41 S257 13.4(i) 13.98 01/01/2027 No
143-140.1 2026‑41 S257 13.4(j) 13.99 01/01/2027 No
143-141 2026‑41 S257 13.4(l) 13.990 01/01/2027 No
143-146 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-151.8 2026‑41 S257 13.4(m) 13.991 01/01/2027 No
143-151.9 2026‑41 S257 13.4(n) 13.992 01/01/2027 No
143-151.19 2026‑41 S257 13.4(o) 13.993 01/01/2027 No
143-151.63 2026‑41 S257 13.4(p) 13.994 01/01/2027 No
143-151.75 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143-157.1 (d)(26) 2025‑39 H948 8.6 8.6 07/01/2025 Yes
143-162.5 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143-162.7 2025‑25 H40 29(1) 29 06/26/2025 Yes
143-162.8 2025‑ H171 1.2(a) 1.2 07/01/2026 Vetoed No
143-162.8 2026‑41 S257 5.9(a3) 5.9 See Bill No
143-162.8 (i) 2026‑41 S257 5.9(a1) 5.9 See Bill No
143-166.3 (a), (e) 2025‑ S50 1.9 1.9 12/01/2025 Vetoed No
143-166.30 (g1) 2026‑50 H1126 1.6(a) 1.6 07/07/2026 No
143-166.41 2025‑8 H50 1 1 07/01/2025 Yes
143-166.41 2026‑33 H481 1(a) 1 07/02/2026 No
143-166.41 (c)(3) 2026‑33 H481 1(c) 1 07/02/2026 No
143-166.42 2025‑8 H50 2 2 07/01/2025 Yes
143-166.42 2026‑33 H481 1(b) 1 07/02/2026 No
143-166.50 (e2) 2026‑50 H1126 1.6(b) 1.6 07/07/2026 No
143-166.60 (b) 2025‑11 H477 12(a) 12 06/13/2025 Yes
143-166.60 (d)(4) 2026‑50 H1126 4.9(a) 4.9 07/07/2026 No
143-166.70 (5) 2025‑11 H477 12(b) 12 06/13/2025 Yes
143-166.82 (b) 2026‑50 H1126 3.1(t) 3.1 07/07/2026 No
143-202.4 2026‑40 S1041 4.61 4.9 10/01/2026 No
143-214.1A (a), (c), (d) 2025‑48 S472 1(a) 1 10/01/2025 Yes
143-214.1A (c), (d) 2025‑50 H768 3(a) 3 10/01/2025 Yes
143-214.7 2026‑32 H376 5.5(a) 5.5 07/02/2026 No
143-214.7 2026‑39 H162 2(a) 2 07/06/2026 No
143-214.7 (b)(6) 2025‑94 H926 20 20 10/06/2025 Yes
143-215.3 (a)(1b) 2026‑41 S257 12.11 12.9 07/01/2026 No
143-215.4 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-215.6E 2026‑11 S401 4 4 06/22/2026 No
143-215.13 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-215.22C 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143-215.22G (1b) 2025‑77 H694 2(b) 2 07/09/2025 Yes
143-215.22L 2026‑41 S257 12.6(a1) 12.6 07/01/2026 No
143-215.31 (a1)(6) 2025‑94 H926 19 19 10/06/2025 Yes
143-215.32 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143-215.32A (b) 2026‑41 S257 12.14(a) 12.93 07/01/2026 No
143-215.32B 2025‑26 H1012 2E.1 2E.1 06/27/2025 Yes
143-215.54 (a) 2025‑18 H251 7(b) 7 06/26/2025 Yes
143-215.73N Art. 21, Part 8E 1 2026‑41 S257 12.19(a) 12.992 07/01/2026 No
143-215.73N 2 2026‑41 S257 12.19(b) 12.994 07/01/2026 No
143-215.73O 2026‑41 S257 12.19(a) 12.993 07/01/2026 No
143-215.73O 2026‑41 S257 12.19(b) 12.994 07/01/2026 No
143-215.73P 2026‑41 S257 12.19(a) 12.993 07/01/2026 No
143-215.73P 2026‑41 S257 12.18(b) 12.992 07/01/2026 No
143-215.77A 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-215.84 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143-215.85 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143-215.88B 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-215.94A (2), (2a), (7) 2025‑25 H40 21(b) 21 06/26/2025 Yes
143-215.94A (5) 2025‑25 H40 21(a)(1) 21 06/26/2025 Yes
143-215.94B (b)(6), (12) 2025‑25 H40 21(a)(2) 21 06/26/2025 Yes
143-215.94E 2025‑25 H40 21(c) 21 06/26/2025 Yes
143-215.94F 2025‑25 H40 21(a)(3) 21 06/26/2025 Yes
143-215.94G 2025‑25 H40 21(d) 21 06/26/2025 Yes
143-215.94G 2025‑25 H40 24(l) 24 06/26/2025 Yes
143-215.94P 2025‑25 H40 21(a)(4) 21 06/26/2025 Yes
143-215.94U (a)(7), (a)(8) 2026‑41 S257 12.16(a) 12.98 07/01/2026 No
143-215.94V 2025‑25 H40 21(e) 21 06/26/2025 Yes
143-215.94W 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-215.104D 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-215.104P 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-215.107A 2026‑41 S257 12.13(c) 12.92 07/01/2026 No
143-215.107A (c) 2026‑41 S257 12.13(a) 12.91 See Bill No
143-215.108 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143-215.110 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143-215.125 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-250.1 (b) 2026‑50 H1126 3.1(u) 3.1 07/07/2026 No
143-254.5 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143-254.5 2026‑43 H747 1 1 07/07/2026 No
143-254.6 (e)(4) 2026‑41 S257 22.5(p) 22.5M 07/01/2026 No
143-260.10 2025‑10 S477 8 8 06/13/2025 Yes
143-283.1 Art. 29A 2025‑25 H40 22 22 06/26/2025 Yes
143-283.2 2025‑25 H40 22 22 06/26/2025 Yes
143-283.3 2025‑25 H40 22 22 06/26/2025 Yes
143-283.8 2025‑25 H40 22 22 06/26/2025 Yes
143-293 2025‑25 H40 29(2) 29 06/26/2025 Yes
143-300.35 (a) 2026‑40 S1041 4.62 4.9 10/01/2026 No
143-318.12 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143-318.12 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143-318.14A 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143-318.14A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143-341 (4)b. 1 2026‑41 S257 22.3(b) 22.3 07/01/2026 No
143-341 (4)g. 2 2026‑41 S257 22.4(a) 22.4 07/07/2026 No
143-341 (8) 3 2026‑41 S257 22.2 22.2 07/01/2026 No
143-341 (8) 4 2026‑41 S257 22.4(b) 22.4 07/01/2026 No
143-355.5 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143-406 2025‑10 S477 7(b) 7.1 06/13/2025 Yes
143-442 2026‑11 S401 11 11 06/22/2026 No
143-509 (9) 2025‑27 H576 3.5 3.5 06/27/2025 Yes
143-554 (a) 2026‑40 S1041 4.63 4.9 10/01/2026 No
143-580 Art. 63 2026‑40 S1041 4.64 4.9 10/01/2026 No
143-581 2026‑40 S1041 4.64 4.9 10/01/2026 No
143-582 2026‑40 S1041 4.64 4.9 10/01/2026 No
143-583 2026‑40 S1041 4.64 4.9 10/01/2026 No
143-584 2026‑40 S1041 4.64 4.9 10/01/2026 No
143-589 2026‑40 S1041 4.64 4.9 10/01/2026 No
143-652.2 (f) 2026‑40 S1041 4.65 4.9 10/01/2026 No
143-719 (b) 2026‑50 H1126 3.1(v) 3.1 07/07/2026 No
143-728 (e) 2026‑40 S1041 4.66 4.9 10/01/2026 No
143-747 (a1) 2026‑40 S1041 4.67 4.9 10/01/2026 No
143-755 2026‑41 S257 39.5(g) 39.5F 07/01/2026 No
143-805 (d) 2026‑44 S355 5.2(a) 5.2 07/07/2026 No
143-805 (d)(8) 2026‑34 H83 3(a) 3 07/02/2026 No
143-821 Art. 85 2026‑41 S257 11.17(a) 11.95 10/01/2026 No
143-822 2026‑41 S257 11.17(a) 11.95 10/01/2026 No
143-826 Art. 86 2026‑41 S257 11.16(a) 11.94 10/01/2026 No
143-827 2026‑41 S257 11.16(a) 11.94 10/01/2026 No
143A-6 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143A-13 2025‑25 H40 19(h) 19 06/26/2025 Yes
143A-48 2026‑41 S257 7.4(y) 7.4995 07/01/2026 No
143A-78 2026‑41 S257 13.4(b) 13.91 01/01/2027 No
143B-17 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-53.2 (c) 2026‑40 S1041 4.68 4.9 10/01/2026 No
143B-53.15 2025‑10 S477 6(a) 6.0 06/13/2025 Yes
143B-63 2026‑41 S257 5.10(l) 5.91.98 07/07/2026 No
143B-84 2025‑25 H40 19(i) 19 06/26/2025 Yes
143B-87.1 2026‑41 S257 14.5 14.5 07/01/2026 No
143B-88 2026‑41 S257 14.4(a) 14.4 06/30/2026 No
143B-94 2025‑10 S477 5(b) 5.1 06/13/2025 Yes
143B-135.59 2026‑46 H1094 27(b) 27 10/01/2026 No
143B-135.188 2026‑41 S257 14.11(a) 14.6 07/01/2026 No
143B-135.209 2026‑41 S257 14.11(b) 14.7 07/01/2026 No
143B-135.214 (f) 2026‑41 S257 22.5(q) 22.5N 07/01/2026 No
143B-135.236 (a) 2026‑50 H1126 3.1(w) 3.1 07/07/2026 No
143B-135.242 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-135.275 2025‑10 S477 1(a) 1 06/13/2025 Yes
143B-139.4A 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143B-139.5 2025‑25 H40 28(b) 28 01/01/2023 Yes
143B-139.5C 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143B-147 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-148 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-165 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-168.12 (a)(2) 2026‑40 S1041 4.69 4.9 10/01/2026 No
143B-168.12 (b) 2025‑83 H549 7 7 07/29/2025 Yes
143B-168.14 (a)(2) 2026‑40 S1041 4.70 4.9 10/01/2026 No
143B-168.15 (h) 2026‑41 S257 9D.9(d) 9D.5 07/01/2026 No
143B-181.16 2025‑25 H40 38(b) 38 06/26/2025 Yes
143B-216.70 (b) 2026‑40 S1041 4.71 4.9 10/01/2026 No
143B-216.80 (b)(1) 2026‑40 S1041 4.72 4.9 10/01/2026 No
143B-218 2025‑83 H549 12(a) 12 12/01/2025 Yes
143B-218 2026‑31 S595 9(f) 9 07/02/2026 No
143B-219 2026‑31 S595 9(g) 9 07/02/2026 No
143B-245.10 2026‑31 S595 9(b) 9 07/02/2026 No
143B-245.10 2026‑41 S257 44.6(d1) 44.6E 07/07/2026 No
143B-245.11 2026‑41 S257 44.6(d2) 44.6F 07/07/2026 No
143B-245.12 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143B-245.12 2026‑41 S257 44.6(d3) 44.6G 12/01/2026 No
143B-245.13 2026‑41 S257 44.6(d4) 44.6H 07/07/2026 No
143B-245.15 2026‑31 S595 9(c) 9 07/02/2026 No
143B-245.15 2026‑41 S257 44.6(d6) 44.6J See Bill No
143B-245.16 2026‑31 S595 9(e) 9 07/02/2026 No
143B-279.13 2026‑41 S257 12.16(b) 12.99 07/01/2026 No
143B-279.19 (a) 2026‑41 S257 12.12(a) 12.90 07/01/2026 No
143B-279.22 2026‑41 S257 12.7(a) 12.7 07/07/2026 No
143B-279.25 2026‑41 S257 12.8 12.8 07/01/2026 No
143B-283 2025‑97 S449 4.3(a) 4.3 07/01/2025 Yes
143B-283 (b4) 2026‑41 S257 12.22(a) 12.22 07/01/2026 No
143B-289.52 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143B-289.54 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143B-289.57 (f) 2026‑11 S401 21(a) 21 06/22/2026 No
143B-350 (f) 2026‑41 S257 43.27(c) 43.27C 01/01/2026 No
143B-393 (a)(9) 2026‑41 S257 19.4(b) 19.4A 07/01/2026 No
143B-394.2 (a) 2026‑40 S1041 4.73 4.9 10/01/2026 No
143B-407 2026‑41 S257 22.9(a) 22.9 See Bill No
143B-426.40A 2025‑83 H549 8 8 07/29/2025 Yes
143B-426.40A (l) 2025‑25 H40 21(f) 21 06/26/2025 Yes
143B-431.01 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-431.01 (d)(2)a. 2026‑41 S257 5.10(g) 5.91.93 07/07/2026 No
143B-431.01 (j) 2026‑40 S1041 4.74 4.9 10/01/2026 No
143B-434.01 (e)(2) 2026‑41 S257 22.5(r) 22.5O 07/01/2026 No
143B-435.1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.01 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143B-437.02 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.02A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.02A 2026‑41 S257 11.4(a) 11.4 07/01/2026 No
143B-437.02C 2026‑41 S257 11.5 11.5 07/01/2026 No
143B-437.07 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.012 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.012 2026‑41 S257 11.8 11.8 07/01/2026 No
143B-437.012 (d), (j), (k) 2025‑65 S664 1 1 07/07/2025 Yes
143B-437.012 (d)(2c)c. 2026‑42 H56 4.4 4.4 07/01/2026 No
143B-437.020 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.021 2026‑41 S257 11.6 11.6 07/01/2026 No
143B-437.7 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.54 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.57 (a)(16) 2026‑41 S257 22.5(s) 22.5P 07/01/2026 No
143B-437.73 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.82 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-437.101 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-602 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-801 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-803 2026‑41 S257 19.10 19.9 07/01/2026 No
143B-901 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-902 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-903 2026‑41 S257 19.4(a) 19.4 07/01/2026 No
143B-904 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-905 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-1001 2026‑41 S257 20.12(d) 20.8H 07/07/2026 No
143B-1010 Art. 13, Part 5, Subpt. B 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1011 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1012 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1013 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1014 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1015 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1016 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1017 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1018 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1019 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1020 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1021 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1022 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1023 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1040 Art. 13, Part 5, Subpart D 2025‑2 H47 2B.1(a) 2.5 10/01/2026 Yes
143B-1041 2025‑2 H47 2B.1(a) 2.5 10/01/2026 Yes
143B-1100 2026‑41 S257 21.3(a) 21.3 07/07/2026 No
143B-1203 Art. 13, Part 8 2026‑41 S257 20.8(b) 20.8 07/01/2026 No
143B-1204 2026‑41 S257 20.8(b) 20.8 07/01/2026 No
143B-1205 2026‑41 S257 20.8(b) 20.8 07/01/2026 No
143B-1206 2026‑41 S257 20.8(b) 20.8 07/01/2026 No
143B-1207 2026‑41 S257 20.8(b) 20.8 07/01/2026 No
143B-1208.3 2026‑41 S257 20.13 20.8K 07/01/2026 No
143B-1208.5 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143B-1208.5 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143B-1208.13 2026‑41 S257 20.3 20.3F 07/01/2026 No
143B-1208.15 2025‑25 H40 39.5 39.5 06/26/2025 Yes
143B-1208.15A 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-1208.15A 2026‑41 S257 20.2(p) 20.2Y 07/07/2026 No
143B-1208.16 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-1208.16 2026‑41 S257 20.2(q) 20.2Z 07/07/2026 No
143B-1208.18 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-1208.18 2026‑41 S257 20.2(s) 20.3 07/07/2026 No
143B-1208.19 2026‑41 S257 20.2(o) 20.2X 07/07/2026 No
143B-1208.19 2026‑41 S257 20.2(t) 20.3A 07/07/2026 No
143B-1208.19 (d) 2026‑41 S257 20.11(a) 20.8F 07/01/2026 No
143B-1209 2026‑41 S257 20.12(d) 20.8I 07/07/2026 No
143B-1209.09 2025‑97 S449 5.7(a) 5.7 10/22/2025 Yes
143B-1209.11 (b) 2026‑41 S257 7.31(l) 7.999992 07/01/2026 No
143B-1209.11 (f) 2026‑40 S1041 4.75 4.9 10/01/2026 No
143B-1209.58 2025‑25 H40 39.5 39.5 06/26/2025 Yes
143B-1209.103 2026‑41 S257 20.10(c) 20.8E 07/01/2026 No
143B-1211 (10) 2026‑41 S257 35.2(a) 35.2 07/01/2026 No
143B-1211 (24) 2026‑41 S257 35.4 35.4 07/01/2026 No
143B-1212 2026‑40 S1041 4.76 4.9 10/01/2026 No
143B-1218 2026‑41 S257 35.3(b) 35.3 07/07/2026 No
143B-1218 2026‑41 S257 35.3(d) 35.3B 07/07/2026 No
143B-1224 (2) 2025‑20 H91 1.5 1.5 06/26/2025 Yes
143B-1278 2025‑72 S118 4(b) 4 10/01/2025 Yes
143B-1285 2026‑41 S257 35.2(a) 35.2A 07/01/2026 No
143B-1291 2026‑41 S257 35.2(a) 35.2B 07/01/2026 No
143B-1293 2026‑41 S257 35.2(a) 35.2C 07/01/2026 No
143B-1294 2026‑41 S257 35.2(a) 35.2D 07/01/2026 No
143B-1295 2026‑41 S257 35.2(a) 35.2E 07/01/2026 No
143B-1296 2026‑41 S257 35.2(a) 35.2F 07/01/2026 No
143B-1300 2026‑41 S257 35.2(a) 35.2G 07/01/2026 No
143B-1301 2026‑41 S257 35.2(a) 35.2H 07/01/2026 No
143B-1311 2026‑41 S257 35.2(a) 35.2I 07/01/2026 No
143B-1311 (b)(1)h. 2025‑20 H91 2.9 2.9 06/26/2025 Yes
143B-1320 2025‑25 H40 39.7 39.7 06/26/2025 Yes
143B-1320 (a)(17), (b) 2025‑62 S133 2 2 07/01/2025 Yes
143B-1320 (b) 2025‑83 H549 2 2 07/01/2025 Yes
143B-1320 (b) 2025‑89 H125 4.1(a) 4.1 07/01/2025 Yes
143B-1320 (b) 2025‑89 H125 4.1(a1) 4.1 07/01/2025 Yes
143B-1320 (b) 2025‑97 S449 7.2(a) 7.2 10/22/2025 Yes
143B-1320 (b) 2026‑41 S257 20.6 20.6 07/01/2026 No
143B-1321 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-1322 (b) 2026‑40 S1041 4.77 4.9 10/01/2026 No
143B-1325 (c)(13) 2025‑89 H125 4.1(c) 4.1 07/01/2025 Yes
143B-1332 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
143B-1332 2026‑41 S257 5.5(e) 5.5 07/01/2026 No
143B-1333 (a) 2026‑41 S257 40.2 40.2 07/01/2026 No
143B-1341 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-1345 2026‑41 S257 40.5(a) 40.5 07/01/2026 No
143B-1350 (a), (l) 2025‑83 H549 3 3 07/29/2025 Yes
143B-1361 2026‑41 S257 22.5(t) 22.5Q 07/01/2026 No
143B-1372 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-1373 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143B-1373 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-1373.2 2025‑89 H125 4.3(a) 4.3 07/01/2025 Yes
143B-1373.2 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143B-1374 2025‑89 H125 4.3(b) 4.3 07/01/2025 Yes
143B-1374 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143B-1377 (e) 2026‑41 S257 24.1(b) 24.1A 07/01/2026 No
143B-1400 2025‑25 H40 29(4) 29 06/26/2025 Yes
143B-1403 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143B-1410 2025‑83 H549 9 9 07/29/2025 Yes
143B-1420 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
143B-1446 2026‑41 S257 17.1(a) 17.1 07/01/2026 No
143B-1447 2026‑41 S257 17.13(a) 17.9C 07/01/2026 No
143B-1455 2026‑44 S355 2.3(c) 2.3 07/07/2026 No
143B-1470 (c) 2026‑41 S257 17.9(a) 17.9 07/07/2026 No
143B-1484 (b) 2026‑44 S355 4.1 4.1 07/07/2026 No
143B-1491 (d) 2026‑44 S355 1.3(a) 1.3 07/07/2026 No
143B-1491 (e) 2025‑19 H476 5.1(g) 5.1 06/26/2025 Yes
143B-1710 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
143B-1730 2026‑41 S257 20.5 20.5 07/01/2026 No
143B-1731 2026‑41 S257 21.4 21.4 07/01/2026 No
143B-1751 2026‑41 S257 21.1 21.1 07/01/2026 No
143B-1760 Art. 17, Part 4 2025‑4 H74 5.1(b) 5.1 05/14/2025 Yes
143B-1760 Art. 17, Part 4 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1760 Art. 17, Part 4 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1761 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1762 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1762 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1763 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1763 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1764 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1765 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1765 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1766 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1766 (9), (13) 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1767 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1768 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1768 (4), (5) 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1769 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1769 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1770 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1770 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1771 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1771 (b), (f) 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1772 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1772 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1773 2025‑4 H74 5.1(c) 5.1 05/14/2025 Yes
143B-1773 (c) 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1774 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1775 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143B-1776 2025‑4 H74 5.1(d) 5.1 05/14/2025 Yes
143C-1-1 (d) 2026‑41 S257 5.6(b) 5.6 07/01/2026 No
143C-1-1 (d)(5) 2026‑9 H1123 5.1(a) 5.1 06/19/2026 No
143C-1-2 (b) 2026‑41 S257 5.6(c) 5.6 07/01/2026 No
143C-1-3 (e) 2025‑6 H506 4.3(a) 4.3 07/01/2025 Yes
143C-2-5 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143C-2-5 (a), (c) 2026‑41 S257 5.6(d) 5.6 07/01/2026 No
143C-2-6 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143C-3-5 (b) 2026‑41 S257 5.6(e) 5.6 07/01/2026 No
143C-4-3.1 (b) 2026‑41 S257 5.5(a) 5.5 07/01/2026 No
143C-4-3.1 (b) 2026‑41 S257 42.1(m) 42.1A 07/01/2026 No
143C-4-9 2026‑41 S257 41.24 41.9D 07/01/2026 No
143C-4-10 (b)(3) 2026‑41 S257 5.10(f1) 5.91.92 07/07/2026 No
143C-4-11 2026‑41 S257 9E.11 9E.93 07/01/2026 No
143C-5-4 (b) 2026‑41 S257 5.6(f) 5.6 07/01/2026 No
143C-5-4.1 2026‑41 S257 5.6(g) 5.6 07/01/2026 No
143C-6-4 2026‑41 S257 5.6(h) 5.6 07/01/2026 No
143C-6-5.1 2026‑41 S257 5.6(i) 5.6 07/01/2026 No
143C-6-5.6 (b1), (c) 2025‑84 H805 3(a) 3 07/01/2025 Yes
143C-6-9 (b) 2026‑41 S257 16.20(u) 16.999T 07/01/2027 No
143C-6-10 2026‑40 S1041 4.78 4.9 10/01/2026 No
143C-6-11 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
143C-6-11 (f), (k) 2025‑47 S391 3 3 07/01/2025 Yes
143C-6-11 (l), (p) 2026‑41 S257 5.6(j) 5.6 07/01/2026 No
143C-6-12.1 2026‑41 S257 19.1(a) 19.1 07/01/2026 No
143C-6-13 2026‑41 S257 5.6(k) 5.6 07/01/2026 No
143C-8-6 2026‑41 S257 5.13(a) 5.94 07/01/2026 No
143C-8-7.1 2026‑41 S257 42.7(a) 42.7 07/01/2026 No
143C-8-7.2 2026‑9 H1123 6.1 6.1 06/19/2026 No
143C-9-2 (a) 2026‑50 H1126 3.1(x) 3.1 07/07/2026 No
143C-9-3 2026‑41 S257 5.6(l) 5.6 07/07/2026 No
143C-9-10 (b) 2025‑89 H125 2B.12(c) 2 07/01/2025 Yes
143C-10-1 2026‑41 S257 5.9(a4) 5.9 See Bill No
143C-10-1 (c) 2025‑ H171 1.3(a) 1.3 12/01/2025 Vetoed No
143C-10-2 2025‑ H171 1.3(a) 1.3 12/01/2025 Vetoed No
143C-10-2 2026‑41 S257 5.9(a4) 5.9 See Bill No
143C-10-3 2025‑ H171 1.3(a) 1.3 12/01/2025 Vetoed No
143C-10-3 2026‑41 S257 5.9(a4) 5.9 See Bill No
143C-215.32B 2026‑41 S257 5A.4 5.95 07/01/2026 No
144-7 (a) 2025‑94 H926 12(a) 12 10/06/2025 Yes
144-9 (b) 2025‑25 H40 23 23 06/26/2025 Yes
145-52 2026‑41 S257 39.1(a) 39.1 07/07/2026 No
145-53 2026‑41 S257 39.1(b) 39.1 07/07/2026 No
146-30 (d)(16) 2026‑41 S257 17.11(b) 17.9B 07/01/2026 No
147-11 (a) 2026‑41 S257 41.4(a) 41.4 07/01/2026 No
147-12 (a)(15) 2025‑25 H40 19(g) 19 06/26/2025 Yes
147-34 2026‑41 S257 37.2(d) 37.2C 07/01/2026 No
147-36 2026‑41 S257 37.2(b) 37.2A 07/01/2026 No
147-41 2026‑41 S257 37.2(d) 37.2d 07/01/2026 No
147-43 2026‑41 S257 37.2(d) 37.2e 07/01/2026 No
147-50 2026‑41 S257 37.2(c) 37.2B 07/01/2026 No
147-54 2026‑41 S257 37.2(e) 37.2F 07/01/2026 No
147-54.5 (e) 2026‑50 H1126 3.1(y) 3.1 07/07/2026 No
147-64.4 (5) 2025‑83 H549 4 4 07/29/2025 Yes
147-64.6 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
147-64.6 2026‑41 S257 24.5(c) 24.5 10/01/2026 No
147-64.6 (c) 2026‑41 S257 39.3(c) 39.3B 07/07/2026 No
147-64.6 (c)(21) 2025‑83 H549 10 10 12/01/2025 Yes
147-64.6 (c)(24) 2025‑83 H549 10 10 12/01/2025 Yes
147-64.6 (d) 2026‑40 S1041 4.79 4.9 10/01/2026 No
147-64.6B 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
147-64.6B 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
147-64.6B 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
147-64.6B (b) 2025‑83 H549 5 5 07/29/2025 Yes
147-64.6E 2026‑41 S257 24.1(a) 24.1 07/01/2026 No
147-64.7 (a), (a1) 2025‑83 H549 6 6 07/29/2025 Yes
147-64.7 (b)(2) 2026‑41 S257 24.5(d) 24.5 10/01/2026 No
147-65 Art. 6, Part 1 1 2025‑6 H506 1.1(1) 1.1 06/13/2025 Yes
147-65 2 2025‑6 H506 1.2(a) 1.2 06/13/2025 Yes
147-65.1 2025‑6 H506 2.1 2.1 07/01/2025 Yes
147-65.1 (7)i. 2026‑50 H1126 4.9(h) 4.9 07/07/2026 No
147-65.2 2026‑40 S1041 4.80 4.9 10/01/2026 No
147-65.2 1 2025‑6 H506 1.2(a) 1.2 06/13/2025 Yes
147-65.2 2 2025‑6 H506 4.1(a) 4.1 07/01/2025 Yes
147-65.2 (b) 3 2025‑6 H506 1.3 1.3 06/13/2025 Yes
147-66 2025‑6 H506 1.1(1) 1.1 06/13/2025 Yes
147-66 2025‑6 H506 1.2(a1) 1.2 06/13/2025 Yes
147-66.2 2025‑6 H506 1.2(i) 1.2 06/13/2025 Yes
147-67.1 2025‑6 H506 1.2(b) 1.2 06/13/2025 Yes
147-68.3 2025‑6 H506 1.2(e) 1.2 06/13/2025 Yes
147-68.4 2025‑6 H506 1.2(f) 1.2 06/13/2025 Yes
147-68.5 2025‑6 H506 1.2(j) 1.2 06/13/2025 Yes
147-68.6 2025‑6 H506 1.2(k) 1.2 06/13/2025 Yes
147-68.7 2026‑41 S257 38.1(a) 38.1 07/07/2026 No
147-69.1 Art. 6, Part 2 1 2025‑6 H506 1.1(2) 1.1 06/13/2025 Yes
147-69.1 Art. 6, Part 2 2 2025‑6 H506 3.1(a) 3.1 01/01/2026 Yes
147-69.2 2025‑6 H506 1.1(2) 1.1 06/13/2025 Yes
147-69.2 2025‑6 H506 3.1(a) 3.1 01/01/2026 Yes
147-69.2 (a) 2026‑41 S257 35.1(d) 35.1B 07/01/2026 No
147-69.2 (a)(17m) 2026‑41 S257 5.5(c) 5.5 07/01/2026 No
147-69.2A 2025‑6 H506 3.1(a) 3.1 01/01/2026 Yes
147-69.2A (b) 2026‑50 H1126 4.9(f) 4.9 07/07/2026 No
147-69.3 2025‑6 H506 1.1(2) 1.1 06/13/2025 Yes
147-69.3 2025‑6 H506 3.1(a) 3.1 01/01/2026 Yes
147-69.3 (i2) 2025‑6 H506 1.3 1.3 06/13/2025 Yes
147-69.3A 2025‑6 H506 1.2(b) 1.2 06/13/2025 Yes
147-69.4 2025‑6 H506 1.1(2) 1.1 06/13/2025 Yes
147-69.4A 2025‑6 H506 3.1(a) 3.1 01/01/2026 Yes
147-69.5 2025‑6 H506 1.1(2) 1.1 06/13/2025 Yes
147-69.5 2025‑6 H506 3.1(a) 3.1 01/01/2026 Yes
147-69.6 2025‑6 H506 3.1(a) 3.1 01/01/2026 Yes
147-69.6 (a) 2026‑50 H1126 3.1(z) 3.1 07/07/2026 No
147-69.7 2025‑6 H506 1.1(2) 1.1 06/13/2025 Yes
147-69.7 2025‑6 H506 1.2(d) 1.2 06/13/2025 Yes
147-69.8 Art. 6, Part 3 2025‑6 H506 1.1(3) 1.1 06/13/2025 Yes
147-69.8 Art.6, Part 3 2025‑6 H506 3.1(b) 3.1 01/01/2026 Yes
147-69.9 2025‑6 H506 1.1(3) 1.1 06/13/2025 Yes
147-69.9 2025‑6 H506 3.1(b) 3.1 01/01/2026 Yes
147-69.10 2025‑6 H506 1.1(3) 1.1 06/13/2025 Yes
147-69.10 2025‑6 H506 3.1(b) 3.1 01/01/2026 Yes
147-69.11 2025‑6 H506 1.1(3) 1.1 06/13/2025 Yes
147-69.11 2025‑6 H506 1.2(c) 1.2 06/13/2025 Yes
147-69.12 2025‑6 H506 1.1(3) 1.1 06/13/2025 Yes
147-69.12 2025‑6 H506 3.1(b) 3.1 01/01/2026 Yes
147-69.12 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
147-70 2025‑6 H506 1.2(e) 1.2 06/13/2025 Yes
147-70.1 Art. 6, Part 4 1 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-70.1 Art. 6, Part 4 2 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-70.2 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-70.2 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-70.3 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-70.3 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-70.4 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-70.4 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-70.5 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-70.5 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-70.6 2025‑6 H506 1.2(d) 1.2 06/13/2025 Yes
147-70.6 2025‑6 H506 3.1(c) 3.1 01/01/2026 Yes
147-71 2025‑6 H506 1.2(f) 1.2 06/13/2025 Yes
147-71.1 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-71.1 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-71.2 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-71.2 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-71.2 (a) 2025‑6 H506 3.1(d) 3.1 01/01/2026 Yes
147-71.3 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-71.3 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-72 2025‑6 H506 1.2(g) 1.2 06/13/2025 Yes
147-72.1 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-72.1 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-72.1 (c) 2026‑40 S1041 4.81 4.9 10/01/2026 No
147-72.1 (e) 2025‑6 H506 3.1(e) 3.1 01/01/2026 Yes
147-73 2025‑6 H506 1.2(h) 1.2 06/13/2025 Yes
147-73.2 2025‑6 H506 1.1(4) 1.1 06/13/2025 Yes
147-73.2 2025‑6 H506 1.2(c) 1.2 06/13/2025 Yes
147-73.2 2025‑6 H506 2.2 2.2 07/01/2025 Yes
147-74 Art. 6, Part 5 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-75 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-75 2025‑6 H506 1.2(i) 1.2 06/13/2025 Yes
147-75.1 2025‑6 H506 1.2(j) 1.2 06/13/2025 Yes
147-76 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-76.1 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-77 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-78 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-78.1 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-79 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-80 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-81 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-82 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-83 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-84 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-85 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-86 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-86.1 2025‑6 H506 1.1(5) 1.1 06/13/2025 Yes
147-86.2 2025‑6 H506 1.1(6) 1.1 06/13/2025 Yes
147-86.2 2025‑6 H506 1.2(k) 1.2 06/13/2025 Yes
147-86.11 (f)(1) 2026‑50 H1126 2.3 2.3 07/07/2026 No
147-86.57 (4a) 2026‑50 H1126 3.2(a) 3.2 07/07/2026 No
147-86.58 2026‑50 H1126 3.2(b) 3.2 07/07/2026 No
147-86.60 (a) 2026‑50 H1126 3.2(c) 3.2 07/07/2026 No
147-86.61 (b) 2026‑50 H1126 3.2(d) 3.2 07/07/2026 No
147-86.72 (a1) 2026‑50 H1126 1.9(d) 1.9 07/07/2026 No
147-86.73 (e), (g1) 2025‑19 H476 4.1(a) 4.1 06/26/2025 Yes
147-86.80 (3a), (4) 2026‑50 H1126 3.2(e) 3.2 07/07/2026 No
147-86.81 2026‑50 H1126 3.2(f) 3.2 07/07/2026 No
148-5.5 2025‑70 S429 22 22 07/09/2025 Yes
148-19 (b1) 2026‑41 S257 17.4(b) 17.4A 07/01/2026 No
148-19.3 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
148-19.4 2026‑41 S257 17.4(a) 17.4 07/01/2026 No
148-32.1 (b2)(1) 2026‑41 S257 17.10 17.9A 07/07/2026 No
148-37.3 (c) 2026‑41 S257 20.2(y) 20.3E 07/07/2026 No
148-65.5 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
148-65.7 (a),(c) 2026‑41 S257 17.6(a) 17.6 07/07/2026 No
148-118.8 (a) 2026‑40 S1041 4.82 4.9 10/01/2026 No
148-132 2026‑44 S355 2.2 2.2 07/07/2026 No
150B-1 2025‑25 H40 40 40 06/26/2025 Yes
150B-1 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
150B-1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-1 (d) 2026‑41 S257 43.21(d) 43.21D 07/01/2026 No
150B-1 (d)(27a) 2025‑10 S477 2 2 06/13/2025 Yes
150B-1 (d)(35) 2025‑93 H307 6.5(f) 6.5 10/03/2025 Yes
150B-1 (f) 2026‑41 S257 8A.18(a) 8A.95 07/01/2025 No
150B-1 (f), (g) 2026‑41 S257 8A.18(b) 8A.95 07/01/2026 No
150B-2 (3) 2026‑31 S595 4.9 4.9 07/02/2026 No
150B-2 (8a)i. 2025‑34 S124 11 11 07/01/2025 Yes
150B-19.1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-19.4 2025‑82 H402 3 3 07/29/2025 Yes
150B-20 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
150B-20 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21.1 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
150B-21.1 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21.1A 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
150B-21.1A 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21.3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
150B-21.3 (b), (b2), (b3) 2025‑82 H402 1 1 07/29/2025 Yes
150B-21.3A 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
150B-21.3A 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21.4 (b1) 2025‑82 H402 2 2 07/29/2025 Yes
150B-21.5 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
150B-21.5 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21.5 (c1) 2025‑28 H568 1.2 1.2 06/27/2025 Yes
150B-21.6 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21.19 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-21.20 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
150B-21.24 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
150B-22 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
150B-22 (c) 2025‑94 H926 15 15 10/06/2025 Yes
150B-23 (a) 2026‑40 S1041 4.83 4.9 10/01/2026 No
150B-23 (b) 2025‑94 H926 14(a) 14 10/06/2025 Yes
150B-23.3 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
150B-25.1 (c) 2026‑40 S1041 4.84 4.9 10/01/2026 No
150B-33 (b)(11) 2026‑40 S1041 4.85 4.9 10/01/2026 No
150B-34 (a) 1 2025‑25 H40 24(a) 24 06/26/2025 Yes
150B-34 (a), (d) 2 2025‑25 H40 24(b) 24 06/26/2025 Yes
150B-37 (c) 2025‑25 H40 24(a) 24 06/26/2025 Yes
150B-38 2025‑94 H926 14(b) 14 10/06/2025 Yes
150B-43 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
151D-31.3 2026‑41 S257 6.11 6.9 07/01/2026 No
153A-27.1 (h) 2025‑3 H58 4(a) 4 03/27/2025 Yes
153A-27.1 (h) 2025‑13 H3 1(a) 1 12/04/2028 Yes
153A-27.1 (h) 2026‑25 S876 1(a) 1 07/02/2026 No
153A-77 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
153A-82 (a)(9) 2025‑19 H476 6.1(a) 6.1 06/26/2025 Yes
153A-92 (b)(5) 2026‑40 S1041 4.86 4.9 10/01/2026 No
153A-93 2025‑25 H40 18(c) 18 06/26/2025 Yes
153A-94.2 2025‑16 H612 4.1 4.1 10/01/2025 Yes
153A-145.5 catch line, (c) 2026‑19 S153 5(a) 5 06/24/2026 No
153A-148.1 (a)(4) 2025‑39 H948 8.7 8.7 07/01/2025 Yes
153A-149 (c)(34) 2026‑41 S257 5.11(a) 5.92. 07/01/2026 No
153A-155 2026‑15 S484 2 2 06/22/2026 No
153A-156 2026‑31 S595 7.2(a) 7.2 10/01/2026 No
153A-200 (c) 2026‑31 S595 10(c) 10 10/01/2026 No
153A-205 2026‑46 H1094 21(a) 21 07/07/2026 No
153A-212.1 2026‑41 S257 16.20(v) 16.999U 07/01/2027 No
153A-225.2 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
153A-245.1 2026‑46 H1094 19(d) 19 12/01/2026 No
153A-246.1 2025‑47 S391 13(b) 13 10/01/2025 Yes
153A-274 (1) 2026‑41 S257 5.11(b) 5.92 07/01/2026 No
153A-435.1 2026‑19 S153 5(b) 5 06/24/2026 No
153A-439 (b) 2026‑40 S1041 4.87 4.9 10/01/2026 No
153A-459 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
153A-464 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
159-3 (a) 2026‑41 S257 5.10(b) 5.91.2 07/07/2026 No
159-7 (d) 2026‑50 H1126 4.7 4.7 07/07/2026 No
159-13 (b)(21) 2026‑41 S257 39.3(a) 39.3 07/07/2026 No
159-25 (d), (e) 2025‑19 H476 6.1(b) 6.1 06/26/2025 Yes
159-28 (b1) 2026‑41 S257 39.3(b) 39.3A 07/07/2026 No
159-30 (c) 2026‑41 S257 39.2 39.2 07/01/2026 No
159-34 (f) 2026‑50 H1126 6.3 6.3 07/07/2026 No
159-48 (c)(4a) 2026‑46 H1094 21(b) 21 07/07/2026 No
159-48 (e) 2025‑39 H948 8.8 8.8 07/01/2025 Yes
159-81 (1) 2025‑39 H948 8.9 8.9 07/01/2025 Yes
159-182 2025‑ H171 1.3(b) 1.3 12/01/2025 Vetoed No
159-182 2026‑41 S257 5.9(a4) 5.9 See Bill No
159-183 2025‑ H171 1.3(c) 1.3 12/01/2025 Vetoed No
159-183 2026‑41 S257 5.9(a4) 5.9 See Bill No
159B-5 2025‑94 H926 22(a) 22 10/06/2025 Yes
159B-11 (a)(12) 2025‑94 H926 22(b) 22 10/06/2025 Yes
159B-12 2025‑94 H926 22(c) 22 10/06/2025 Yes
159B-39 Local Modification 2026‑27 S1076 1(a) 1 07/02/2026 No
159B-39 Local Modification 2026‑27 S1076 3(a) 3 07/02/2026 No
159D-37 2026‑50 H1126 7.1 7.1 07/07/2026 No
159D-38 2026‑41 S257 5.10(a) 5.91.1 07/07/2026 No
159D-38 (a) 2026‑50 H1126 7.2 7.2 07/07/2026 No
159D-45 (f) 2026‑50 H1126 7.3 7.3 07/07/2026 No
159G-20 2026‑41 S257 12.4(b) 12.4 07/01/2026 No
159G-20 (21) 2026‑41 S257 12.2(f) 12.2 07/01/2026 No
159G-22 2026‑41 S257 12.4(c) 12.4 07/01/2026 No
159G-22 (a) 2026‑41 S257 5.5(d) 5.5 07/01/2026 No
159G-26 (b) 2026‑41 S257 12.2(g) 12.2 07/01/2026 No
159G-30 2026‑41 S257 12.4(d) 12.4 07/01/2026 No
159G-31 2026‑41 S257 12.4(e) 12.4 07/01/2026 No
159G-32 2026‑41 S257 12.4(f) 12.4 07/01/2026 No
159G-34.1 2026‑41 S257 12.4(g) 12.4 07/01/2026 No
159G-35 2026‑41 S257 12.4(h) 12.4 07/01/2026 No
159G-36 2026‑41 S257 12.4(i) 12.4 07/01/2026 No
159G-36 (c) 2026‑41 S257 12.2(h) 12.2 07/01/2026 No
159G-37 2026‑41 S257 12.4(j) 12.4 07/01/2026 No
159G-39 2026‑41 S257 12.4(k) 12.4 07/01/2026 No
159G-40 2026‑41 S257 12.4(l) 12.4 07/01/2026 No
159G-42 2026‑41 S257 12.4(m) 12.4 07/01/2026 No
159G-43 2026‑41 S257 12.4(n) 12.4 07/01/2026 No
159G-71 (13) 2026‑41 S257 8.27(m) 8.994 07/01/2026 No
159G-75 Art. 6 2026‑41 S257 8.27(l) 8.993 07/01/2026 No
159G-77 2026‑41 S257 8.27(l) 8.993 07/01/2026 No
159G-79 2026‑41 S257 8.27(l) 8.993 07/01/2026 No
160A-20 (h)(11) 2025‑39 H948 8.10 8.10 07/01/2025 Yes
160A-58.1 (b) 2026‑2 S214 6 6 05/07/2026 Yes
160A-58.1 (b) 2026‑17 S809 1 1 06/24/2026 No
160A-58.1 (b)(5) 2025‑14 H26 1 1 06/25/2025 Yes
160A-58.1 (b)(5) 2026‑22 S811 1 1 06/25/2026 No
160A-58.54 (d) 2026‑41 S257 39.4(a) 39.4 07/07/2026 No
160A-58.55 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
160A-148 (a)(9)a., b. 2025‑19 H476 6.1(c) 6.1 06/26/2025 Yes
160A-163 2025‑25 H40 18(d) 18 06/26/2025 Yes
160A-164.2 2025‑16 H612 4.2 4.2 10/01/2025 Yes
160A-205.2 catch line, (c) 2026‑19 S153 5(c) 5 06/24/2026 No
160A-205.8 2026‑51 H372 1 1 07/07/2026 No
160A-209 (c)(32) 2026‑41 S257 5.11(c) 5.92 07/01/2026 No
160A-215 2026‑15 S484 1 1 06/22/2026 No
160A-215 (g) 2026‑35 H332 1.6 1.6 07/02/2026 No
160A-215.1 2026‑31 S595 7.2(b) 7.2 10/01/2026 No
160A-233 (c) 2026‑31 S595 10(b) 10 10/01/2026 No
160A-272 (a), (b1) Local Modification 2025‑30 H173 4(a) 4 06/30/2025 Yes
160A-288 (b) 2026‑53 H206 7(a) 7 07/07/2026 No
160A-289.1 2026‑41 S257 16.20(w) 16.999V 07/01/2027 No
160A-300.2 2026‑46 H1094 19(c) 19 12/01/2026 No
160A-300.4 2025‑47 S391 13(a) 13 10/01/2025 Yes
160A-304 (a) 2026‑41 S257 20.2(m) 20.2H 07/07/2026 No
160A-311 (2) 2026‑41 S257 5.11(d) 5.92 07/01/2026 No
160A-314.2 Local Modification 2026‑27 S1076 1(b) 1 07/02/2026 No
160A-339 Local Modification 2026‑27 S1076 2(a) 2 07/01/2027 No
160A-340 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
160A-340.2 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
160A-340.3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
160A-340.6 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
160A-341 2026‑48 S857 65 65 10/01/2026 No
160A-485.1 2026‑19 S153 5(d) 5 06/24/2026 No
160A-499.9 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
160A-635 (f) 2026‑31 S595 15(a) 15 07/02/2026 No
160A-700 (d)(5) 2026‑41 S257 7.31(m) 7.999993 07/01/2026 No
160A-900 Art. 34 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-901 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-902 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-903 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-904 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-905 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-906 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-907 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-908 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-909 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-910 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-911 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-912 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-913 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-914 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-915 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-916 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-917 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-918 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-919 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-920 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-921 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-922 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-923 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-924 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-925 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160A-926 2025‑39 H948 5.1 5.1 07/01/2025 Yes
160D-102 (18) 2025‑94 H926 29(d) 29 10/06/2025 Yes
160D-107 Local Modification 2025‑30 H173 3(a) 3 06/30/2025 Yes
160D-108 (c) 2025‑94 H926 29(a) 29 10/06/2025 Yes
160D-110 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
160D-202 (h) Local Modification 2026‑25 S876 2(a) 2 07/02/2026 No
160D-203 2025‑94 H926 29(c) 29 10/06/2025 Yes
160D-308 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
160D-402 2026‑41 S257 13.4(q) 13.995 01/01/2027 No
160D-403 (b1) 2026‑41 S257 39.5(e) 39.5D 07/01/2026 No
160D-405 (b) 2026‑41 S257 39.5(f) 39.5E 07/01/2026 No
160D-406 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
160D-601 (c) 2025‑94 H926 11 11 10/06/2025 Yes
160D-602 (f) Local Modification 2025‑32 H309 3.5(a) 3.5 06/30/2025 Yes
160D-702 (c) 2026‑39 H162 1(a) 1 01/01/2027 No
160D-702 (c)(4), (d) 2025‑94 H926 4(a) 4 01/01/2026 Yes
160D-705 (c) 2025‑94 H926 29(b) 29 10/06/2025 Yes
160D-805 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
160D-805 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
160D-903 2026‑11 S401 19(a) 19 07/01/2026 No
160D-904 Local Modification 2026‑25 S876 11(a) 9.1 07/02/2026 No
160D-913 (b) 2025‑94 H926 18 18 10/06/2025 Yes
160D-917 2026‑ H437 2(a) 2 06/30/2027 Vetoed No
160D-1104 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
160D-1104 (d2) 2025‑94 H926 3 3 10/06/2025 Yes
160D-1311 2025‑25 H40 25 25 06/26/2025 Yes
160D-1403.1 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
160D-1403.1 2026‑41 S257 39.5(a) 39.5 07/01/2026 No
160D-1405 2026‑41 S257 39.5(d) 39.5C 07/01/2026 No
161-14.04 2026‑54 H133 2 2 04/01/2027 No
161-50.2 (b) 2026‑50 H1126 3.1(aa) 3.1 07/07/2026 No
162-62 2025‑85 H318 1 1 10/01/2025 Yes
162A-9 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
162A-9 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
162A-19.1 2026‑32 H376 2 2 07/02/2026 No
162A-19.2 2026‑32 H376 3 3 07/02/2026 No
162A-132.1C 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
162A-209 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
163-82.10 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
163-82.26 2025‑25 H40 29(6) 29.6 06/26/2025 Yes
163-129 2025‑25 H40 40.1 40.1 06/26/2025 Yes
163-165.7 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
163-166.17 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
163-166.18 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
163-201 (a) 2025‑95 S249 1 1 10/22/2025 Yes
163-230.2 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
163-230.3 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
163-258.2 (6)a., (7)a. 2025‑20 H91 2.10 2.10 06/26/2025 Yes
163-258.9 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
163-258.9 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
163-258.14 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
163-258.14 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
163-258.15 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
163-258.16 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
163-258.16 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
163-274 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
163-275 (11) 2025‑81 H193 5 5 12/01/2025 Yes
163-278.8B (b), (c), (d) 2025‑25 H40 40.2 40.2 06/26/2025 Yes
163-278.14A 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
164-14 2026‑24 S858 1 1 06/29/2026 No
164-38 2026‑41 S257 16.16(a) 16.993 12/01/2026 No
164-51 2026‑41 S257 16.12(b) 16.98 07/07/2026 No
166A-19.3 (10) 2026‑41 S257 5A.19(a) 5A.19.1 01/01/2025 No
166A-19.4 2025‑18 H251 2(a) 2 12/01/2025 Yes
166A-19.12 (26a) 2026‑41 S257 5A.18 5A.18 07/01/2026 No
166A-19.14A 2025‑25 H40 29(1) 29.1 06/26/2025 Yes
166A-19.15 (f)(2) 2026‑41 S257 5A.19(b) 5A.19.2 01/01/2025 No
166A-19.31 2025‑25 H40 29(5) 29.5 06/26/2025 Yes
166A-19.40 (c) 2025‑26 H1012 3.4 3.4 06/27/2025 Yes
166A-19.41 (e) 2025‑18 H251 3 2 06/26/2025 Yes
166A-19.60 2026‑41 S257 5A.19(c) 5A.19.3 01/01/2025 No
166A-19.70A 2025‑25 H40 29(3) 29.3 06/26/2025 Yes
168-11 2025‑25 H40 26 26 06/26/2025 Yes
168A-10.1 2026‑40 S1041 4.88 4.9 10/01/2026 No
169-13 (b) 2026‑40 S1041 4.89 4.9 10/01/2026 No
1143B-1293 (d) 2026‑41 S257 35.3(c) 35.3A 06/30/2026 No
1876-14 PrivateLaw 2026‑25 S876 5.2(a) 5.2 07/02/2026 No
1883-103 s. 4 Uncodified 2026‑18 H1035 9.7(b) 9.7 06/24/2026 No
1883-103 s. 4.1 Uncodified 2026‑18 H1035 9.7(a) 9.7 06/24/2026 No
1885-136 s. 3 PR 2025‑3 H58 1(a) 1 03/27/2025 Yes
1887-154 s. 3.3.6 Uncodified 2026‑18 H1035 10(a) 10 06/24/2026 No
1891-281 PR 2025‑14 H26 5(e)(1) 5 06/25/2025 Yes
1893-11 s. 3 Uncodified 2026‑18 H1035 9.3(b) 9.3 06/24/2026 No
1893-11 s. 3.1 Uncodified 2026‑18 H1035 9.3(a) 9.3 06/24/2026 No
1893-11 s. 4 Uncodified 2026‑18 H1035 9.3(b) 9.3 06/24/2026 No
1893-274 s. 3 Uncodified 2026‑18 H1035 9.2(b) 9.2 06/24/2026 No
1893-274 s. 3.1 Uncodified 2026‑18 H1035 9.2(a) 9.2 06/24/2026 No
1893-274 s. 4 Uncodified 2026‑18 H1035 9.2(b) 9.2 06/24/2026 No
1893-321 s. 3.1 Uncodified 2026‑18 H1035 5(a) 5 06/24/2026 No
1903-110 s. 2 PR 2025‑13 H3 3.2(a) 3 06/25/2025 Yes
1903-363 s. 3 1 PR 2025‑5 H17 2(b) 2 06/04/2025 Yes
1903-363 s. 4 2 PR 2025‑5 H17 2(a) 2 06/04/2025 Yes
1907-230 s. 3 Uncodified 2026‑18 H1035 9.1(a) 9.1 06/24/2026 No
1907-230 s. 4 Uncodified 2026‑18 H1035 9.1(b) 9.1 06/24/2026 No
1907-407 PrivateLaw 2026‑25 S876 5.8(a) 5.8 07/02/2026 No
1907-407 PrivateLaw 2026‑25 S876 5.8(b) 5.8 07/02/2026 No
1907-407 PrivateLaw 2026‑25 S876 5.8(c) 5.8 07/02/2026 No
1907-430 s. 3 Uncodified 2026‑18 H1035 9.6(b) 9.6 06/24/2026 No
1907-430 s. 3.1 3.2 Uncodified 2026‑18 H1035 9.6(a) 9.6 06/24/2026 No
1911-223 PrivateLaw 2026‑36 H1220 3 3 07/02/2026 No
1911-271 s. 3 3 Uncodified 2026‑18 H1035 12.2(a) 12.2 06/24/2026 No
1911-271 s. 5 5 Uncodified 2026‑18 H1035 12.2(c) 12.2 06/24/2026 No
1911-271 s. 10 6 Uncodified 2026‑18 H1035 12.2(c) 12.2 06/24/2026 No
1911-271 s. 11 7 Uncodified 2026‑18 H1035 12.2(b) 12.2 06/24/2026 No
1911-279 PR 2025‑32 H309 2.1(d)(1) 2.1 06/30/2025 Yes
1913-67 s. 8 PrivateLaw 2026‑36 H1220 1 1 07/02/2026 No
1913-273 PR 2025‑32 H309 2.1(d)(2) 2.1 06/30/2025 Yes
1915-31 s. 3 Uncodified 2026‑18 H1035 1(c) 1 06/24/2026 No
1915-31 s. 3.1 Uncodified 2026‑18 H1035 1(a) 1 06/24/2026 No
1915-31 s. 3.2 Uncodified 2026‑18 H1035 1(b) 1 06/24/2026 No
1935-63 PrivateLaw 2026‑25 S876 5.5(a) 5.5 07/02/2026 No
1935-106 PR 2025‑14 H26 5(e)(2) 5 06/25/2025 Yes
1939-168 s. 7(c) - (f) P-L 2025‑30 H173 6.1 6.1 06/30/2025 Yes
1947-793 Uncodified 2026‑18 H1035 12.2(d) 12.2 06/24/2026 No
1951-1188 2025‑32 H309 2.1(d)(3) 2.1 06/30/2025 Yes
1953-389 Uncodified 2026‑18 H1035 12.2(d) 12.2 06/24/2026 No
1953-717 2025‑32 H309 4.1(e)(1) 4.1 06/30/2025 Yes
1955-760 Uncodified 2026‑18 H1035 1(d) 1 06/24/2026 No
1955-789 Uncodified 2026‑18 H1035 9.6(c) 9.6 06/24/2026 No
1957-35 s. 1 1 2025‑3 H58 2.2(b) 2.3 03/27/2025 Yes
1957-35 s. 2 2 2025‑3 H58 2.2(a) 2.2 03/27/2025 Yes
1957-35 ss. 3-7 3 2025‑3 H58 2.2(b) 2.3 03/27/2025 Yes
1957-36 2025‑14 H26 5(e)(3) 5 06/25/2025 Yes
1957-668 2025‑32 H309 2.1(d)(4) 2.1 06/30/2025 Yes
1961-76 Uncodified 2026‑18 H1035 9.3(c) 9.3 06/24/2026 No
1961-109 Uncodified 2026‑18 H1035 9.1(c) 9.1 06/24/2026 No
1961-114 s. 1 2025‑32 H309 4.1(e)(2) 4.1 06/30/2025 Yes
1961-323 s. 2.01 Uncodified 2026‑18 H1035 9.5(a) 9.5 06/24/2026 No
1961-323 s. 2.51 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.52 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.53 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.54 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.55 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.56 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.57 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.58 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.71 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.72 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.73 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-323 s. 2.74 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026 No
1961-327 2025‑32 H309 4.1(e)(3) 4.1 06/30/2025 Yes
1961-366 s. 2 Uncodified 2026‑18 H1035 2(a) 2 06/24/2026 No
1961-754 2025‑32 H309 4.1(e)(4) 4.1 06/30/2025 Yes
1961-1022 s. 18 2025‑15 H183 2(a) 2 06/26/2025 Yes
1961-1022 s. 19 2025‑15 H183 2(b) 2 06/26/2025 Yes
1963-96 s. 1 2025‑13 H3 2(a) 2 06/25/2025 Yes
1963-295 2025‑32 H309 4.1(e)(5) 4.1 06/30/2025 Yes
1963-707 0 2025‑3 H58 4.1 4.1 03/27/2025 Yes
1963-707 s. 4(a) 1 2025‑32 H309 4.3(a) 4.3 06/30/2025 Yes
1963-707 s. 4(b) - (f), (h) - (j) 2 2025‑32 H309 4.3(d) 4.3 06/30/2025 Yes
1963-707 s. 4(g) 3 2025‑32 H309 4.3(b) 4.3 06/30/2025 Yes
1963-707 s. 4(k) 4 2025‑32 H309 4.3(c) 4.3 06/30/2025 Yes
1965-760 s. 14 2025‑13 H3 3(b) 3 06/25/2025 Yes
1965-760 s. 15 2025‑13 H3 3(c) 3 06/25/2025 Yes
1965-760 s. 8 2025‑13 H3 3(a) 3 06/25/2025 Yes
1965-760 ss. 16 - 19 2025‑13 H3 3(d) 3 06/25/2025 Yes
1965-988 s. 23 2025‑32 H309 1.1 1.1 06/30/2025 Yes
1967-571 s. 11 Uncodified 2026‑28 H1040 2(b) 2 07/02/2026 No
1967-571 s. 13 Uncodified 2026‑28 H1040 2(c) 2 07/02/2026 No
1967-571 s. 16 Uncodified 2026‑28 H1040 2(d) 2 07/02/2026 No
1967-571 s. 4 Uncodified 2026‑28 H1040 1(a) 1 07/02/2026 No
1967-571 s. 5 Uncodified 2026‑28 H1040 1(b) 1 07/02/2026 No
1967-571 s. 6 Uncodified 2026‑28 H1040 2(a) 2 07/02/2026 No
1969-385 s. 4 2025‑13 H3 3.7(a) 3 06/25/2025 Yes
1969-1053 s. 1 2025‑32 H309 4.1(e)(6) 4.1 06/30/2025 Yes
1969-1089 2025‑67 H23 5.1(b) 5.1 07/07/2025 Yes
1971-341 s. 2 Uncodified 2026‑25 S876 9(a) 9 07/01/2026 No
1971-341 s. 2.1 Uncodified 2026‑25 S876 9(b) 9 07/01/2026 No
1971-626 s. 3.4 2025‑13 H3 3.4(a) 3 06/25/2025 Yes
1971-626 s. 4.1 2025‑13 H3 3.4(b) 3 06/25/2025 Yes
1971-626 s. 4.2 2025‑13 H3 3.4(c) 3 06/25/2025 Yes
1971-626 s. 4.3 2025‑13 H3 3.4(d) 3 06/25/2025 Yes
1971-890 s. 3 2025‑13 H3 3.5(a) 3 06/25/2025 Yes
1973-289 s. 3.3(a) 2025‑5 H17 1(a) 1 06/04/2025 Yes
1973-1100 s. 4.1 Uncodified 2026‑18 H1035 8(a) 8 06/24/2026 No
1973-1100 s. 5 Uncodified 2026‑18 H1035 8(b) 8 06/24/2026 No
1975-97 Uncodified 2026‑18 H1035 9.3(c) 9.3 06/24/2026 No
1975-147 s. 1 Uncodified 2026‑25 S876 5.1(a) 5.1 07/02/2026 No
1975-147 s. 1 Uncodified 2026‑25 S876 5.1(b) 5.1 07/02/2026 No
1975-239 s. 11.4 2025‑32 H309 2.4 2.4 06/30/2025 Yes
1977-55 Uncodified 2026‑22 S811 9(a) 9 06/25/2026 No
1977-58 s. 2.2 Uncodified 2026‑18 H1035 6(b) 6 06/24/2026 No
1977-58 s. 3.1 Uncodified 2026‑18 H1035 6(a) 6 06/24/2026 No
1977-58 s. 3.2 Uncodified 2026‑18 H1035 6(c) 6 06/24/2026 No
1977-78 s. 4.01 Uncodified 2026‑18 H1035 9.4(a) 9.4 06/24/2026 No
1977-84 s. 4 Uncodified 2026‑18 H1035 3(a) 3 06/24/2026 No
1977-84 s. 5 Uncodified 2026‑18 H1035 3(b) 3 06/24/2026 No
1977-101 s. 2.2 Uncodified 2026‑18 H1035 12.1(b) 12.1 06/24/2026 No
1977-101 s. 3.1 Uncodified 2026‑18 H1035 12.1(a) 12.1 06/24/2026 No
1977-101 s. 3.2 Uncodified 2026‑18 H1035 12.1(c) 12.1 06/24/2026 No
1977-101 s. 3.3 Uncodified 2026‑18 H1035 12.1(c) 12.1 06/24/2026 No
1977-237 s. 1 Uncodified 2026‑25 S876 5.9(a) 5.9 07/02/2026 No
1977-333 s. 1 Uncodified 2026‑29 H1215 1 1 07/02/2026 No
1977-633 s. 2 2025‑32 H309 4.2(a) 4.2 06/30/2025 Yes
1977-633 s. 3 2025‑32 H309 4.2(b) 4.2 06/30/2025 Yes
1977-633 s. 4 2025‑32 H309 4.2(c) 4.2 06/30/2025 Yes
1977-633 s. 7 2025‑32 H309 4.2(d) 4.2 06/30/2025 Yes
1979-82 s. 1 Uncodified 2026‑18 H1035 5(b) 5 06/24/2026 No
1979-82 s. 2 Uncodified 2026‑18 H1035 5(b) 5 06/24/2026 No
1979-82 s. 3 Uncodified 2026‑18 H1035 5(b) 5 06/24/2026 No
1979-243 s. 1 Uncodified 2026‑25 S876 5.4(a) 5.4 07/02/2026 No
1979-259 s. 1 Uncodified 2026‑25 S876 4(a) 4 See Bill No
1979-259 s. 1 Uncodified 2026‑25 S876 4(b) 4 07/02/2026 No
1979-259 s. 1 Uncodified 2026‑25 S876 4(c) 4 07/02/2026 No
1979-259 s. 1 Uncodified 2026‑25 S876 4(d) 4 07/02/2026 No
1981-192 s. 3 2025‑32 H309 4.1(e)(7) 4.1 06/30/2025 Yes
1981-352 s. 1 Uncodified 2026‑25 S876 5.6(a) 5.6 07/02/2026 No
1981-352 s. 1 Uncodified 2026‑25 S876 5.6(b) 5.6 07/02/2026 No
1983-134 2025‑32 H309 3.2(a) 3.2 06/30/2025 Yes
1983-234 s. 2 2025‑32 H309 4.1(e)(8) 4.1 06/30/2025 Yes
1983-601 s. 4 2025‑25 H40 41 41 06/26/2025 Yes
1985-46 s. 2.3 Uncodified 2026‑18 H1035 7(a) 7 06/24/2026 No
1987-32 ss. 1, 2 Uncodified 2026‑35 H332 1.1(a) 1.1 10/01/2026 No
1987-193 s. 1 2025‑13 H3 2.1(a) 2.1 12/07/2026 Yes
1987-193 s. 4 2025‑13 H3 2.1(b) 2.1 12/07/2026 Yes
1987-193 s. 6 2025‑13 H3 2.1(c) 2.1 12/07/2026 Yes
1987-209 s. 1 Uncodified 2026‑7 H240 1(a) 1 06/18/2026 No
1987-601 s. 2 Uncodified 2026‑25 S876 5.7(a) 5.7 07/02/2026 No
1989-867 2025‑30 H173 4(c) 4 06/30/2025 Yes
1989-1042 s. 3.3 Uncodified 2026‑18 H1035 9.8(a) 9.8 06/24/2026 No
1989-1042 s. 3.4 Uncodified 2026‑18 H1035 9.8(a) 9.8 06/24/2026 No
1989-1042 s. 4.1 Uncodified 2026‑18 H1035 9.8(b) 9.8 06/24/2026 No
1991-371 s. 2 Uncodified 2026‑25 S876 9(c) 9 07/01/2026 No
1991-615 s. 13.8 2025‑32 H309 2.5 2.5 06/30/2025 Yes
1993-35 Uncodified 2026‑18 H1035 12.2(d) 12.2 06/24/2026 No
1993-411 2025‑14 H26 5(f)(1) 5 06/25/2025 Yes
1997-32 s. 1 2025‑32 H309 4.4(a) 4.4 06/30/2025 Yes
1997-32 s. 3 2025‑32 H309 4.4(b) 4.4 06/30/2025 Yes
1997-32 s. 4 2025‑32 H309 4.4(c) 4.4 06/30/2025 Yes
1997-417 s. 3.1 2025‑39 H948 3.1 3.1 See Bill Yes
1997-420 2025‑14 H26 5(f)(2) 5 06/25/2025 Yes
1997-446 s. 4-1 2025‑13 H3 3.3(b) 3 06/25/2025 Yes
1997-446 s. 4-2 2025‑13 H3 3.3(c) 3 06/25/2025 Yes
1997-446 ss. 3-3, 3-4 2025‑13 H3 3.3(a) 3 06/25/2025 Yes
1999-85 2025‑14 H26 5(f)(3) 5 06/25/2025 Yes
1999-239 s. 1 Uncodified 2026‑25 S876 5.3(a) 5.3 07/02/2026 No
1999-239 s. 1 Uncodified 2026‑25 S876 5.3(b) 5.3 07/02/2026 No
1999-323 s. 1 2026‑41 S257 44.12(a) 44.9H 07/07/2026 No
1999-323 s. 1 2026‑41 S257 44.12(b) 44.9I 07/01/2027 No
2000-35 s. 3.1 2025‑13 H3 5(a) 5 See Bill Yes
2002-42 ss. 3.1, 3.2, 3.3 2025‑5 H17 3(a) 3 06/04/2025 Yes
2002-138 s. 1(d) Uncodified 2026‑7 H240 2(a) 2 06/18/2026 No
2005-54 s. 2 Uncodified 2026‑18 H1035 9.3(c) 9.3 06/24/2026 No
2007-323 s. 7.9(a) Uncodified 2026‑41 S257 7.3(d) 7.3 07/01/2026 No
2008-105 s. 1 Uncodified 2026‑25 S876 5.11(a) 5.92 07/02/2026 No
2010-64 2026‑25 S876 7(a) 7 01/01/2027 No
2011-145 s. 8.3(b) Uncodified 2026‑41 S257 6.2(a) 6.21 07/01/2026 No
2013-357 s. 5 2025‑25 H40 7(a) 7 06/26/2025 Yes
2013-360 18A.4 2026‑41 S257 16.27 16.9994 07/01/2026 No
2013-360 s. 10.4(a) Uncodified 2026‑41 S257 6.2(a) 6.21 07/01/2026 No
2014-100 s. 7.14 2026‑46 H1094 12 12 07/07/2026 No
2014-115 s. 62(b) 2025‑83 H549 8 8 07/29/2025 Yes
2015-35 s. 3.5(a) Uncodified 2026‑18 H1035 11(a) 11 06/24/2026 No
2015-241 s. 12H.29 Uncodified 2026‑41 S257 9E.10(a) 9E.92 07/01/2026 No
2015-241 s. 16A.4 Uncodified 2026‑41 S257 20.12(c) 20.8G 07/07/2026 No
2015-241 s. 10.13 1 2025‑56 S125 2.5(e)(1) 2.5 07/03/2025 Yes
2015-241 s. 14.11(g) 2 2025‑10 S477 6(b) 6.1 06/13/2025 Yes
2015-244 s. 2(a) Uncodified 2026‑25 S876 6(a) 6 12/04/2028 No
2015-244 s. 2(d) Uncodified 2026‑25 S876 6(b) 6 12/04/2028 No
2015-281 s. 12, intro 2025‑25 H40 7(c) 7 01/01/2016 Yes
2016-41 s. 3.1 Uncodified 2026‑18 H1035 4.1(a) 4.1 06/24/2026 No
2016-41 s. 3.6 Uncodified 2026‑18 H1035 4.2(a) 4.2 06/24/2026 No
2016-45 s. 3 Uncodified 2026‑50 H1126 6.2 6.2 07/07/2026 No
2016-94 s. 10.5 2025‑56 S125 2.5(e)(2) 2.5 07/03/2025 Yes
2016-94 s. 12F.3 2025‑89 H125 2B.3(a) 2 07/01/2025 Yes
2016-118 s. 3 Uncodified 2026‑41 S257 11.6 11.6 07/01/2026 No
2017-10 s. 4.9 Uncodified 2026‑41 S257 12.19(a) 12.992 07/01/2026 No
2017-57 s. 7.23 Uncodified 2026‑41 S257 7.17 7.96 07/01/2026 No
2017-57 s. 7.23K(b) Uncodified 2026‑41 S257 7.2(a) 7.2 07/01/2026 No
2017-57 s. 7.23K(c) Uncodified 2026‑41 S257 7.2(b) 7.21 07/01/2026 No
2017-57 s. 7.32(d) Uncodified 2026‑41 S257 7.7(d) 7.74 07/01/2026 No
2017-57 s. 9.15 2025‑67 H23 1 1 07/07/2025 Yes
2017-202 s. 3.1(c) Uncodified 2026‑7 H240 3(a) 3 06/18/2026 No
2018-5 s. 9.4 2025‑56 S125 2.5(e)(3) 2.5 07/03/2025 Yes
2018-5 s. 7.17(b) 1 Uncodified 2026‑41 S257 7.7(c) 7.73 07/01/2026 No
2018-5 s. 34.13(b) 2 Uncodified 2026‑46 H1094 18 18 07/07/2026 No
2018-32 s. 6 Uncodified 2026‑41 S257 7.51(c) 7.9F2 07/07/2026 No
2018-32 s. 6(d) Uncodified 2026‑41 S257 7.36(b) 7.9999996 07/01/2026 No
2018-32 s. 6(p) Uncodified 2026‑41 S257 7.51(a) 7.9F 07/07/2026 No
2018-32 s. 6(q) Uncodified 2026‑41 S257 7.51(b) 7.9F1 07/07/2026 No
2019-37 s. 7 Uncodified 2026‑41 S257 12.20(a) 12.995 06/30/2026 No
2019-99 Uncodified 2026‑30 H1222 1 1 07/02/2026 No
2019-230 s. 7(b) Uncodified 2026‑41 S257 42.1(g) 42.1 07/01/2026 No
2020-3 s. 4.15(c) 2025‑70 S429 22 22 07/09/2025 Yes
2020-4 s. 4.2 2025‑92 H358 1C.1 1 09/30/2025 Yes
2020-4 s. 4.3 Uncodified 2026‑3 H433 4 4 05/12/2026 No
2020-18 s. 15 2025‑77 H694 3 3 07/09/2025 Yes
2020-78 s. 17.4 Uncodified 2026‑41 S257 35.1(b) 35.1A 07/01/2026 No
2020-88 s. 11 Uncodified 2026‑1 H696 3C.17(a) 3 07/01/2025 No
2020-88 s. 11 Uncodified 2026‑41 S257 9E.23 9E.991 07/01/2026 No
2021-46 s. 2(b) Uncodified 2026‑23 H117 1 1 06/25/2026 No
2021-103 Uncodified 2026‑27 S1076 3(b) 3 07/02/2026 No
2021-180 s. 7.18 1 Uncodified 2026‑41 S257 7.37 7.9999997 07/01/2026 No
2021-180 s. 8.10(i) 1 2025‑4 H74 2.3(c) 2.3 05/14/2025 Yes
2021-180 s. 7.20 2 Uncodified 2026‑41 S257 7.1(a) 7.1 07/01/2027 No
2021-180 s. 8.18(c) 2 2025‑4 H74 2.4 2.4 05/14/2025 Yes
2021-180 s. 9A.3A(a) 3 2025‑25 H40 28(a) 28 01/01/2023 Yes
2021-180 s. 9D.22 3 Uncodified 2026‑41 S257 9E.26(a) 9E.994 07/01/2026 No
2021-180 s. 12.13(f)(65) 4 Uncodified 2026‑41 S257 12.3(a) 12.3 07/01/2026 No
2021-180 s. 9A.3A(d) 4 2025‑25 H40 28(b) 28 01/01/2023 Yes
2021-180 s. 19A.7B 5 Uncodified 2026‑41 S257 20.8(c) 20.8A 07/01/2026 No
2021-180 s. 9D.13(c) 5 2025‑64 H546 5.1(a) 5.1 07/07/2025 Yes
2021-180 s. 19A.10 6 Uncodified 2026‑41 S257 9G.3(e) 9G.3 07/01/2026 No
2021-180 s. 9D.19A 6 2025‑69 S479 11(a) 11 07/09/2025 Yes
2021-180 s. 19C.10 7 Uncodified 2026‑41 S257 17.8(a) 17.8 10/01/2026 No
2021-180 s. 19C.10(a) 7 2025‑2 H47 5.3(b) 5.3 03/19/2025 Yes
2021-180 s. 38.10 8 2025‑89 H125 4.2(a) 4.2 08/06/2025 Yes
2021-180 s. 40.1 8 Uncodified 2026‑41 S257 42.8(a) 42.8 07/01/2026 No
2021-180 s. 38.15 9 2025‑89 H125 4.3(g) 4.3 07/01/2025 Yes
2021-180 s. 40.1(c1)(7) 9 Uncodified 2026‑41 S257 20.12(e) 20.8J 07/07/2026 No
2021-180 s. 40.8(3) 9.1 Uncodified 2026‑41 S257 42.9(a) 42.9 07/01/2026 No
2021-180 s. 40.17(a) 9.2 Uncodified 2026‑41 S257 42.5(e) 42.5C 07/01/2026 No
2021-180 s. 40.17(a)(18), (82) 9.5 2025‑4 H74 7.1(b) 7.1 05/14/2025 Yes
2021-189 s. 7.4 Uncodified 2026‑41 S257 43.19(a) 43.19 07/07/2026 No
2022-13 s. 5.6(e) Uncodified 2026‑31 S595 5.6 5.6 07/02/2026 No
2022-74 s. 9F.2 Uncodified 2026‑41 S257 9G.4(b) 9G.4 07/01/2026 No
2022-74 s. 9A.1(a) 1 2025‑25 H40 27(a) 27 01/01/2023 Yes
2022-74 s. 9A.1(d) 2 2025‑25 H40 28(c) 28 01/01/2023 Yes
2022-74 s. 11.11 3 2025‑4 H74 4.2 4.2 05/14/2025 Yes
2022-74 s. 11.11(a) 4 2025‑65 S664 8 8 07/07/2025 Yes
2023-7 s. 1.6(d) 2025‑89 H125 2B.12(d) 2 07/01/2025 Yes
2023-7 s. 1.8(a) 1 2025‑27 H576 2.1 2.1 06/27/2025 Yes
2023-7 s. 2.4 2 2025‑64 H546 2.1(a) 2.1 07/07/2025 Yes
2023-93 s. 2(a) 2025‑51 S710 7 7 07/02/2025 Yes
2023-132 s. 2(c) Uncodified 2026‑41 S257 7.53(a) 7.9H 07/07/2026 No
2023-133 s. 16(j) 2025‑45 H737 11 11 07/01/2025 Yes
2023-134 s. 5.3 1 Uncodified 2026‑1 H696 1.1(a) 1.1 06/30/2026 No
2023-134 s. 6.9(b) 1 2025‑56 S125 2(r) 2 07/03/2025 Yes
2023-134 s. 7.19 2 Uncodified 2026‑41 S257 7.28(b) 7.99990 07/01/2026 No
2023-134 s. 7.28(b) 2 2025‑89 H125 2A.10 2 07/01/2025 Yes
2023-134 s. 7.36(h) 3 Uncodified 2026‑41 S257 7.50 7.9E 07/01/2026 No
2023-134 s. 7.36(l) 3 2025‑56 S125 4(a) 4 06/30/2025 Yes
2023-134 s. 10.4(e) 4 Uncodified 2026‑11 S401 6 6 06/22/2026 No
2023-134 s. 7.58 4 2025‑89 H125 2A.8(b) 2 07/01/2025 Yes
2023-134 s. 7.69 5 2025‑89 H125 2A.9 2 07/01/2025 Yes
2023-134 s. 9E.28 5 Uncodified 2026‑41 S257 9E.25(a) 9E.993 07/01/2023 No
2023-134 s. 11.12(e) 6 Uncodified 2026‑41 S257 11.9(a) 11.9 07/01/2026 No
2023-134 s. 9E.22(a) 6 2025‑64 H546 4.1(a) 4.1 07/07/2025 Yes
2023-134 s. 11.12 7 2025‑4 H74 4.3(b) 4.3 05/14/2025 Yes
2023-134 s. 12.7(d) 7 Uncodified 2026‑41 S257 12.13(c) 12.91 07/01/2026 No
2023-134 s. 14.10(f) 8 2025‑97 S449 6.5(a) 6.5 10/22/2025 Yes
2023-134 s. 16.9(a) 8 Uncodified 2026‑41 S257 16.13(a) 16.99 07/07/2026 No
2023-134 s. 19F.7 9 Uncodified 2026‑41 S257 20.8(d) 20.8B 07/01/2026 No
2023-134 s. 27.11 9 2025‑4 H74 6.4 6.4 05/14/2025 Yes
2023-134 s. 38.4 9.1 2025‑89 H125 4.1(b) 4.1 07/01/2025 Yes
2023-134 s. 38.4(a) 9.1 Uncodified 2026‑41 S257 20.2(w) 20.3C 07/07/2026 No
2023-134 s. 40.1 9.2 Uncodified 2026‑41 S257 42.5(a) 42.5 07/01/2026 No
2023-134 s. 40.1(l) 9.2 2025‑4 H74 7.3 7.3 05/14/2025 Yes
2023-134 s. 40.7(3) 9.3 Uncodified 2026‑41 S257 42.9(b) 42.9A 07/01/2026 No
2023-134 s. 40.8(a)(4) 9.3 2025‑4 H74 7.1(a) 7.1 05/14/2025 Yes
2023-134 s. 40.8(a) 9.4 Uncodified 2026‑41 S257 42.5(d) 42.5B 07/01/2026 No
2023-134 s. 40.8(a)(6) 9.4 2025‑89 H125 5.2(a) 5.2 07/01/2025 Yes
2023-134 s. 41.1(b), (c) 9.5 Uncodified 2026‑41 S257 43.1(a) 43.1 07/01/2026 No
2023-134 s. 41.7(3) 9.5 2025‑4 H74 8.1 8.1 05/14/2025 Yes
2024-1 s. 4.2(g) Uncodified 2026‑41 S257 12.3(b) 12.3 07/01/2026 No
2024-1 s. 6.1(a)(2), (37) 1 2025‑4 H74 6.1 6.1 05/14/2025 Yes
2024-1 s. 6.1(a)(48) - (51) 2 2025‑4 H74 6.1 6.1 05/14/2025 Yes
2024-15 s. 2(a) 2025‑47 S391 23 23 07/01/2025 Yes
2024-29 s. 8(d) 2025‑4 H74 6.2 6.2 05/14/2025 Yes
2024-32 s. 15(c) Uncodified 2026‑11 S401 24(a) 24 06/22/2026 No
2024-32 s. 5.1 2025‑97 S449 4.1 4.1 07/01/2025 Yes
2024-34 s. 8(a1) 2025‑36 H412 8 8 07/01/2025 Yes
2024-44 s. 5.1(d), (e), (g) 2025‑94 H926 23(a) 23 07/08/2024 Yes
2024-45 s. 19.2(f) 2025‑47 S391 19.5(a) 19.5 07/01/2025 Yes
2024-51 s. 12.1 2025‑2 H47 5.11 5.11 03/19/2025 Yes
2024-51 s. 13.1(a) Uncodified 2026‑31 S595 1.7(a) 1.7 07/02/2026 No
2024-51 s. 13.1(c) Uncodified 2026‑31 S595 1.7(b) 1.7 07/02/2026 No
2024-53 s. 4C.3(d) Uncodified 2026‑41 S257 5A.23 5A.23 07/01/2026 No
2024-53 s. 2.1(a) 1 2025‑2 H47 2A.4(c) 2.4 03/20/2025 Yes
2024-53 s. 4B.3 2 2025‑2 H47 5.9 5.9 03/19/2025 Yes
2024-53 s. 4B.7 3 2025‑2 H47 2A.3 2.3 10/25/2024 Yes
2024-53 s. 4C.3 4 2025‑97 S449 1.1(a) 1.1 10/22/2025 Yes
2024-53 s. 4C.7(j) 5 2025‑26 H1012 3.3 3.3 06/27/2025 Yes
2024-53 s. 4C.11(c) 6 2025‑25 H40 42(a) 42 06/26/2025 Yes
2024-53 s. 4C.12(c) 7 2025‑25 H40 42(b) 42 06/26/2025 Yes
2024-53 s. 4C.13(b) 8 2025‑4 H74 4.4 4.4 10/25/2024 Yes
2024-55 s. 10.2 2025‑89 H125 4.4(a) 4.4 07/01/2025 Yes
2024-55 s. 10.2(p) 2025‑89 H125 4.4(b) 4.4 07/01/2025 Yes
2024-56 s. 1.11 2025‑1 S115 3.2 3.2 02/27/2025 Yes
2024-56 s. 1.3 2025‑1 S115 3.1 3.1 02/27/2025 Yes
2024-57 s. 2A.8 Uncodified 2026‑41 S257 8.10(b) 8.90 07/07/2026 No
2024-57 s. 2H.6 Uncodified 2026‑41 S257 42.5(g) 42.5A 07/01/2026 No
2024-57 s. 1D.3 1 2025‑97 S449 1.5(a) 1.5 12/11/2024 Yes
2024-57 s. 1D.8 2 2025‑97 S449 1.4(a) 1.41 10/22/2025 Yes
2024-57 s. 1F.2(d) 3 2025‑2 H47 2B.5 2.6 03/192025 Yes
2024-57 s. 3J.19 4 2025‑56 S125 2.5(e)(4) 2.5 07/03/2025 Yes
2025-2 s. 2B.2(a1) 2025‑4 H74 1A.1 1.1 05/14/2025 Yes
2025-2 s. 2D.2(b) 2025‑4 H74 1A.2(a) 1.2 05/14/2025 Yes
2025-2 s. 2D.2(c) 2025‑4 H74 1A.2(b) 1.2 05/14/2025 Yes
2025-2 s. 5.1(3)c. 2025‑97 S449 1.4(b) 1.42 10/22/2025 Yes
2025-4 s. 1.1(b) Uncodified 2026‑1 H696 1.1(b) 1.1 06/30/2026 No
2025-4 s. 9.1(e) Uncodified 2026‑11 S401 24(b) 24 06/22/2026 No
2025-11 s. 1(c) 2025‑25 H40 42.1 42.1 06/26/2025 Yes
2025-26 s. 2A.3(a)(1)a. 2025‑89 H125 1.2 1.2 07/01/2025 Yes
2025-26 s. 2A.3(c)(1) 2025‑89 H125 2A.10B(a) 2 06/27/2025 Yes
2025-26 s. 2B.1(b) 2025‑97 S449 1.2(a) 1.2 06/27/2025 Yes
2025-29 s. 1.13 01 2025‑86 H1015 3.1 3.1 07/30/2025 Yes
2025-29 s. 1.95 02 2025‑90 S775 3.2 3.2 09/24/2025 Yes
2025-29 s. 1.97 03 2025‑90 S775 3.3 3.3 09/24/2025 Yes
2025-29 s. 1.104 04 2025‑90 S775 3.4 3.4 09/24/2025 Yes
2025-29 s. 1.107 05 2025‑90 S775 3.5 3.5 09/24/2025 Yes
2025-29 s. 1.117 06 2025‑90 S775 3.6 3.6 09/24/2025 Yes
2025-29 s. 1.130 08 2025‑90 S775 3.7 3.7 09/24/2025 Yes
2025-29 s. 1.133 09 2025‑90 S775 3.8 3.8 09/24/2025 Yes
2025-29 s. 1.135 10 2025‑90 S775 3.9 3.9 09/24/2025 Yes
2025-29 s. 1.141 11 2025‑90 S775 3.10 3.10 09/24/2025 Yes
2025-29 s. 2.36 12 2025‑86 H1015 3.2 3.2 07/30/2025 Yes
2025-29 s. 2.43 13 2025‑86 H1015 3.3 3.3 07/30/2025 Yes
2025-29 s. 2.44(a) 13.5 2025‑86 H1015 3.4 3.4 07/30/2025 Yes
2025-29 s. 2.48 14 2025‑86 H1015 3.5 3.5 07/30/2025 Yes
2025-29 s. 2.58(a) 15 2025‑86 H1015 3.6 3.6 07/30/2025 Yes
2025-29 ss. 2.73, 2.78 16 2025‑86 H1015 3.7 3.7 07/30/2025 Yes
2025-29 s. 2.83 17 2025‑86 H1015 3.8 3.8 07/30/2025 Yes
2025-29 s. 2.87 18 2025‑86 H1015 3.9 3.9 07/30/2025 Yes
2025-29 s. 2.92 19 2025‑86 H1015 3.10 3.10 07/30/2025 Yes
2025-29 s. 2.100 20 2025‑86 H1015 3.11 3.11 07/30/2025 Yes
2025-29 s. 2.105 21 2025‑90 S775 3.11 3.11 09/24/2025 Yes
2025-29 s. 2.126 22 2025‑90 S775 3.12 3.12 09/24/2025 Yes
2025-32 s. 2.3 Uncodified 2026‑26 S1074 2(a) 2 07/02/2026 No
2025-45 s. 6(d) 2025‑97 S449 6.11 6.71 07/01/2025 Yes
2025-46 s. 1.3(b) 1 2025‑97 S449 2.3 2.3 07/01/2025 Yes
2025-46 Part 4 2 2025‑92 H358 2.5 2.5 09/30/2025 Yes
2025-52 s. 2 Uncodified 2026‑41 S257 37.1(b) 37.1A 07/01/2026 No
2025-56 Part 3 2025‑92 H358 2.6 2.6 09/30/2025 Yes
2025-57 s. 5 2025‑92 H358 2.3(b) 2.3 09/30/2025 Yes
2025-70 s. 24 Uncodified 2026‑41 S257 16.9(a) 16.9 07/07/2026 No
2025-70 s. 25 Uncodified 2026‑41 S257 16.25(a) 16.9991 07/01/2026 No
2025-72 Part V 2025‑91 S245 3 3 09/30/2025 Yes
2025-72 s. 6 Uncodified 2026‑1 H696 2.5 2.5 4/30/2026 No
2025-72 s. 6 Uncodified 2026‑41 S257 8A.6 8A.6 06/30/2025 No
2025-74 s. 2 Uncodified 2026‑41 S257 12.5(a) 12.5 07/01/2026 No
2025-74 s. 3 Uncodified 2026‑41 S257 12.5(b) 12.5 07/01/2026 No
2025-80 s. 11 Uncodified 2026‑41 S257 7.42 7.9B 07/01/2026 No
2025-86 ss. 2.3, 2.4 2025‑90 S775 3.1 3.1 09/24/2025 Yes
2025-89 s. 2A.1(a) Uncodified 2026‑41 S257 4.2(a) 4.2 07/01/2026 No
2025-89 s. 2A.2(a) Uncodified 2026‑41 S257 4.4 4.4 07/01/2026 No
2025-89 s. 2A.3(a) Uncodified 2026‑41 S257 4.5 4.5 07/01/2026 No
2025-89 s. 2B.13(b) Uncodified 2026‑41 S257 9E.5 9E.5 07/01/2026 No
2025-89 s. 2C.2 Uncodified 2026‑1 H696 4.1 4 4/30/2026 No
2025-89 s. 2C.2 Uncodified 2026‑41 S257 11.7 11.7 07/01/2026 No
2025-89 s. 2F.2 Uncodified 2026‑41 S257 43.9 43.9 07/01/2026 No
2025-89 s. 2A.5A 1 2025‑92 H358 2.1 2.1 07/01/2025 Yes
2025-89 s. 2A.6(b)(2) 2 2025‑92 H358 2.8(a) 2.8 09/30/2025 Yes
2025-89 s. 3.6 3 2025‑97 S449 8.1 8.1 07/01/2025 Yes
2025-89 s. 5.1 4 2025‑92 H358 8.1 8.1 07/01/2025 Yes
2025-90 s. 2.2 2025‑96 S777 3.1 3.1 10/23/2025 Yes
2025-93 s. 1(j) 2025‑97 S449 5.3(b) 5.31 10/22/2025 Yes
2025-97 s. 6.9 Uncodified 2026‑3 H433 1(a) 1 05/12/2026 No
2025-97 s. 7.1(a), 7.1(c) Uncodified 2026‑41 S257 40.3 40.3 07/01/2026 No
2026-1 s. 3C.18(a) Uncodified 2026‑41 S257 9E.22(a) 9E.98 07/07/2026 No
2026-1 s. 3D.7(e) Uncodified 2026‑41 S257 9E.9(b) 9E.9 07/07/2026 No
2026-1 s. 3D.7(g) Uncodified 2026‑41 S257 9E.9(e) 9E.91 07/07/2026 No
2026-1 s. 6.2(5) Uncodified 2026‑3 H433 1.1 1.1 05/12/2026 No
2026-1 s. 6.2(3) Uncodified 2026‑41 S257 26.9 26.9 07/01/2026 No
2026-8 Uncodified 2026‑47 S474 1 1 07/07/2026 No
2026-9 s. 2.1(b) Uncodified 2026‑42 H56 2.6 2.6 07/01/2026 No
2026-19 s. 1(a)(4) Uncodified 2026‑41 S257 5.9(b1) 5.9 07/07/2026 No
2026-19 s. 1(b)(4) Uncodified 2026‑41 S257 5.9(b2) 5.9 07/07/2026 No
2026-19 s. 1(c)(4) Uncodified 2026‑41 S257 5.9(b3) 5.9 07/07/2026 No
2026-19 s. 1(e) Uncodified 2026‑41 S257 5.9(b4) 5.9 07/07/2026 No
2026-19 s. 2(c) Uncodified 2026‑41 S257 5.9(b5) 5.9 07/07/2026 No
2026-19 s. 3(c) Uncodified 2026‑41 S257 5.9(b6) 5.9 07/07/2026 No
2026-19 s. 4 Uncodified 2026‑41 S257 5.9(b7) 5.9 07/07/2026 No
2026-20 s. 4 Uncodified 2026‑41 S257 5.9(c1) 5.9 07/07/2026 No
2026-21 s. 3 Uncodified 2026‑41 S257 5.9(d1) 5.9 07/07/2026 No
2026-40 s. 5.9(f)-(h) Uncodified 2026‑42 H56 4.8(b) 4.8C 07/01/2026 No
2026-41 s. 5A.2(a)(2)a. 1 Uncodified 2026‑42 H56 1.1(a) 1.1 07/01/2026 No
2026-41 s. 5A.11(a) 2 Uncodified 2026‑42 H56 1.2 1.2 07/01/2026 No
2026-41 s. 7.60(a) 3 Uncodified 2026‑42 H56 2.1 2.1 07/01/2026 No
2026-41 s. 7A.7 4 Uncodified 2026‑42 H56 2.4 2.4 07/01/2026 No
2026-41 s. 9D.4 5 Uncodified 2026‑42 H56 3.2 3.2 07/01/2026 No
2026-41 s. 9E.19 6 Uncodified 2026‑42 H56 3.1(a) 3.1 07/07/2026 No
2026-41 s. 9G.6 7 Uncodified 2026‑42 H56 3.4 3.4 07/01/2026 No
2026-41 s. 11.13 8 Uncodified 2026‑42 H56 4.8(a) 4.8 07/01/2026 No
2026-41 s. 12.3(a) 9 Uncodified 2026‑42 H56 4.2 4.2 07/01/2026 No
2026-41 s. 16.24(b) 9.1 Uncodified 2026‑42 H56 5.1(b) 5.1B 07/01/2026 No
2026-41 s. 17.12 9.2 Uncodified 2026‑42 H56 5.2 5.2 07/01/2026 No
2026-41 s. 41.2(a) 9.3 Uncodified 2026‑42 H56 8.1 8.1 07/01/2026 No
2026-41 s. 41.17 9.4 Uncodified 2026‑42 H56 8.2 8.2 07/01/2026 No
2026-41 s. 42.1(b) 9.5 Uncodified 2026‑42 H56 9.1(a) 9.1 07/01/2026 No
2026-41 s. 42.2 9.6 Uncodified 2026‑42 H56 9.1(b) 9.1B 07/01/2026 No
2026-41 s. 44.3(b) 9.7 Uncodified 2026‑42 H56 11.2(a) 9.1C 07/07/2026 No
2026-41 s. 44.4(b) 9.8 Uncodified 2026‑42 H56 11.3(c) 9.1G 07/07/2026 No
2026-41 Part 2 9.9 Uncodified 2026‑42 H56 12.1 9.1I 07/01/2026 No
2026-41 Part 16, s. 26.10 9.9A Uncodified 2026‑42 H56 6.2 6.2 07/01/2026 No