Law modifications not yet reflected in statute
Citation CitationSort Type S.L. Bill Bill Section BillSectionSort Effective Date Status of Bill
1-52 (21) 2026‑41 S257 39.5(c) 39.5B 07/01/2026
1-54 (9) 1 2026‑40 S1041 4.1 4.1 10/01/2026
1-54 (10) 2 2026‑41 S257 39.5(b) 39.5A 07/01/2026
1-339.1 (a)(5) 2026‑31 S595 10(a) 10 07/02/2026
1-507.24 (e1) 2026‑54 H133 3 3 04/01/2027
1E-20 (c), (f) 2026‑44 S355 5.3 5.3 07/07/2026
6-20 2026‑41 S257 16.15(a) 16.991 07/07/2026
6-21.7 2026‑41 S257 39.5(h) 39.5G 07/01/2026
7A-27 (b) 2026‑41 S257 16.19(f) 16.999 07/01/2026
7A-29 (a) 2026‑40 S1041 4.2 4.2 10/01/2026
7A-45.1 2026‑41 S257 16.19(b) 16.997 07/01/2026
7A-45.1 2026‑41 S257 16.24(a) 16.9990 07/01/2026
7A-45.1 2026‑42 H56 5.1(a) 5.1 07/01/2026
7A-49.5 (f) 2026‑41 S257 16.9(b) 16.9 07/07/2026
7A-60 2026‑41 S257 16.20(g) 16.999f 07/01/2027
7A-60 (a1) 2026‑41 S257 16.4(a) 16.4 07/01/2026
7A-60 (a1) 2026‑41 S257 16.4(b) 16.4 01/01/2027
7A-60 (a3) 2026‑41 S257 16.18 16.995 07/01/2026
7A-64 2026‑41 S257 16.20(g) 16.999F 07/01/2027
7A-65 2026‑41 S257 16.20(g) 16.999F 07/01/2027
7A-68 2026‑41 S257 16.20(g) 16.999F 07/01/2027
7A-69 2026‑41 S257 16.20(g) 16.999F 07/01/2027
7A-69.2 2026‑41 S257 16.20(g) 16.999F 07/01/2027
7A-101 (a) 2026‑41 S257 41.7 41.7 07/01/2026
7A-102 (c1) 2026‑41 S257 41.8 41.8 07/01/2026
7A-133 (a) 2026‑41 S257 16.2 16.2 01/01/2027
7A-146 (13) 2026‑40 S1041 4.3 4.3 10/01/2026
7A-171.1 (a)(1) 2026‑41 S257 41.9 41.9 07/01/2026
7A-300.1 2026‑41 S257 16.17(a) 16.994 07/07/2026
7A-300.1 2026‑41 S257 16.20(h) 16.999G 07/01/2027
7A-304 (a) 2026‑37 H1173 1(a) 1 12/01/2026
7A-304 (a) 2026‑41 S257 16.21(a) 16.999W 12/01/2026
7A-304 (a)(2a) 2026‑41 S257 16.23(a) 16.999Y 12/01/2026
7A-304 (a)(3c) 2026‑41 S257 16.30(a) 16.9995B 12/01/2026
7A-305 2026‑41 S257 16.15(b) 16.992 07/07/2026
7A-305 2026‑41 S257 16.19(e) 16.998 07/01/2026
7A-305 2026‑41 S257 16.21(b) 16.999W 12/01/2026
7A-305 (a2) 2026‑41 S257 22.1(a) 22.1 12/01/2026
7A-306 (a)(1a) 2026‑41 S257 16.23(b) 16.999Z 12/01/2026
7A-307 (a)(1a) 2026‑41 S257 16.23(c) 16.999Z 12/01/2026
7A-308 (c), (c1) 2026‑41 S257 16.1 16.1 07/01/2026
7A-314 2026‑41 S257 16.20(i) 16.999H 07/01/2027
7A-315 2026‑41 S257 16.20(j) 16.999I 07/01/2027
7A-316 2026‑41 S257 16.20(k) 16.999J 07/01/2027
7A-339 Art. 28E, Part 1 2026‑40 S1041 3 3 10/01/2026
7A-339.05 2026‑40 S1041 3 3 10/01/2026
7A-339.10 2026‑40 S1041 3 3 10/01/2026
7A-339.15 Art. 28E, Part 2 2026‑40 S1041 3 3 10/01/2026
7A-339.20 Art. 28E, Part 3 2026‑40 S1041 3 3 10/01/2026
7A-339.25 2026‑40 S1041 3 3 10/01/2026
7A-339.30 2026‑40 S1041 3 3 10/01/2026
7A-339.35 2026‑40 S1041 3 3 10/01/2026
7A-339.40 2026‑40 S1041 3 3 10/01/2026
7A-339.45 2026‑40 S1041 3 3 10/01/2026
7A-339.50 2026‑40 S1041 3 3 10/01/2026
7A-343 2026‑41 S257 16.20(l) 16.999K 07/01/2027
7A-343 (8a) 2026‑41 S257 16.11(a) 16.97 07/07/2026
7A-347 2026‑41 S257 16.20(m) 16.999L 07/01/2027
7A-348 2026‑41 S257 16.20(n) 16.999M 07/01/2027
7A-354.1 2026‑41 S257 16.6(a) 16.6 07/01/2026
7A-411 2026‑41 S257 16.20(d) 16.999D 07/01/2027
7A-411 Subchapter VIII title 2026‑41 S257 16.20(a) 16.999A 07/01/2027
7A-411.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-411.1 Art. 32, Part 1 2026‑41 S257 16.20(b) 16.999B 07/01/2027
7A-412 2026‑41 S257 16.20(d) 16.999D 07/01/2027
7A-413 2026‑41 S257 16.20(d) 16.999D 07/01/2027
7A-413.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-413.2 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-414 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-414.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-414.2 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-415 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-415.1 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-416 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-417 2026‑41 S257 16.20(d) 16.999D 07/01/2027
7A-417 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-417 Art. 32, Part 2 2026‑41 S257 16.20(c) 16.999C 07/01/2027
7A-418 2026‑41 S257 16.20(d) 16.999D 07/01/2027
7A-418 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-419 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-420 2026‑41 S257 16.20(d) 16.999D 07/01/2027
7A-420 2026‑41 S257 16.20(f) 16.999E 07/01/2027
7A-458 2026‑41 S257 16.29(a) 16.9995 07/07/2026
7A-498.5 (f) 2026‑41 S257 16.29(b) 16.9995A 07/07/2026
7A-498.5 (g1) 2026‑41 S257 16.26(a) 16.9993 07/07/2026
7A-498.7 (a) 2026‑41 S257 16.31 16.9995C 07/01/2026
7A-754 2026‑40 S1041 4.4 4.4 10/01/2026
7A-759 2026‑40 S1041 4.5 4.5 10/01/2026
7A-760 2026‑40 S1041 4.6 4.6 10/01/2026
7B-2401.1 (5a) 2026‑41 S257 19.11(a) 19.9A 12/01/2026
7B-2401.2 (b) 2026‑41 S257 19.11(a) 19.9B 12/01/2026
7B-2401.3 (h) 2026‑41 S257 19.11(a) 19.9C 12/01/2026
8C-1 Rule 416 2026‑37 H1173 5(a) 5 12/01/2026
10B-25 (n) 2026‑52 H517 7A(a) 7A 07/07/2026
10B-200 (b) 2026‑52 H517 7A(b) 7A 07/07/2026
14-50.16A 2026‑37 H1173 2(a) 2 12/01/2026
14-50.17 2026‑37 H1173 3(a) 3 12/01/2026
14-50.18 2026‑37 H1173 3(b) 3 12/01/2026
14-50.32 2026‑37 H1173 4(a) 4 12/01/2026
14-50.33 2026‑37 H1173 4(b) 4 12/01/2026
14-50.34 2026‑37 H1173 4(c) 4 12/01/2026
14-50.35 2026‑37 H1173 4(d) 4 12/01/2026
14-78 2026‑11 S401 16(a) 16 12/01/2026
14-107.2 2026‑41 S257 16.20(o) 16.999N 07/01/2027
14-159.4 2026‑41 S257 19.5(a) 19.5 12/01/2026
14-159.5 2026‑41 S257 19.5(b) 19.5A 12/01/2026
14-190.7 2026‑34 H83 1(a) 1 12/01/2026
14-190.8 2026‑34 H83 1(b) 1 12/01/2026
14-190.15 2026‑34 H83 1(c) 1 12/01/2026
14-208.6 2026‑41 S257 20.2(n) 20.2I 07/07/2026
14-208.6 (4)g. 2026‑34 H83 1(d) 1 12/01/2026
14-208.7 2026‑41 S257 20.2(n) 20.2J 07/07/2026
14-208.8 2026‑41 S257 20.2(n) 20.2K 07/07/2026
14-208.8A (c) 2026‑41 S257 20.2(n) 20.2L 07/07/2026
14-208.9 2026‑41 S257 20.2(n) 20.2M 07/07/2026
14-208.9A (a)(1) 2026‑41 S257 20.2(n) 20.2N 07/07/2026
14-208.12A (a3) 2026‑41 S257 20.2(n) 20.2O 07/07/2026
14-208.12B (i) 2026‑41 S257 20.2(n) 20.2P 07/07/2026
14-208.13 2026‑41 S257 20.2(n) 20.2Q 07/07/2026
14-208.14 2026‑41 S257 20.2(n) 20.2R 07/07/2026
14-208.15 2026‑41 S257 20.2(n) 20.2S 07/07/2026
14-208.15A 2026‑41 S257 20.2(n) 20.2T 07/07/2026
14-208.18 (a) 2026‑41 S257 16.14(a) 16.990 12/01/2026
14-208.20 (b) 2026‑44 S355 2.1(a) 2.1 12/01/2026
14-208.22 2026‑41 S257 20.2(n) 20.2U 07/07/2026
14-208.27 2026‑41 S257 20.2(n) 20.2V 07/07/2026
14-208.31 2026‑41 S257 20.2(n) 20.2W 07/07/2026
14-292.2 (e)(3) 2026‑41 S257 39.6(a) 39.6 07/07/2026
14-313 2026‑41 S257 44.6(c) 44.6D 12/01/2027
14-313 (h) 2026‑31 S595 9(a) 9 07/02/2026
14-313 (h) 2026‑41 S257 44.6(b) 44.6C See Bill
14-318.18 (3a) 2026‑41 S257 16.10(g) 16.96 07/01/2026
14-415.27 2026‑41 S257 20.2(v) 20.3B 07/07/2026
15A-101.1 2026‑44 S355 1.2(a) 1.2 07/07/2026
15A-268 (b)(3)d.4. 2026‑41 S257 16.10(b) 16.91 07/01/2026
15A-290 2026‑41 S257 19.2(a) 19.2 12/01/2026
15A-532 2026‑38 H1104 13(a) 13 12/01/2026
15A-533 (b1) 2026‑38 H1104 14(a) 14 07/06/2026
15A-831 2026‑41 S257 16.20(p) 16.999O 07/01/2027
15A-1001 2026‑38 H1104 13(b) 13 12/01/2026
15A-1002 2026‑38 H1104 13(c) 13 12/01/2026
15A-1003 2026‑38 H1104 13(d) 13 12/01/2026
15A-1004 2026‑38 H1104 13(e) 13 12/01/2026
15A-1006 2026‑38 H1104 13(f) 13 12/01/2026
15A-1007 2026‑38 H1104 13(g) 13 12/01/2026
15A-1008 2026‑38 H1104 13(h) 13 12/01/2026
15A-1010 2026‑38 H1104 13(i) 13 12/01/2026
15A-1340.16E 2026‑37 H1173 6(a) 6 12/01/2026
15A-1368.2 (c1) 2026‑44 S355 5.1(a) 5.1 07/07/2026
15A-1411 (d) 2026‑41 S257 16.10(c) 16.92 07/01/2026
15A-1417 (a)(3a) 2026‑41 S257 16.10(d) 16.93 07/01/2026
15A-1418 (b) 2026‑41 S257 16.10(e) 16.94 07/01/2026
15A-1460 2026‑41 S257 16.10(a) 16.90 07/01/2026
15A-1462 2026‑41 S257 16.10(a) 16.90 07/01/2026
15A-1470 2026‑41 S257 16.10(a) 16.90 07/01/2026
15A-1475 2026‑41 S257 16.10(a) 16.90 07/01/2026
15A-1475 2026‑41 S257 16.20(q) 16.999P 07/01/2027
15B-2 2026‑53 H206 5(a) 5 07/07/2026
15B-2 (1), (3) 2026‑48 S857 52 52 10/01/2026
15B-6 (b) 2026‑53 H206 5(b) 5 07/07/2026
15B-10 (a) 2026‑53 H206 5(c) 5 07/07/2026
15B-11 (a), (c1) 2026‑53 H206 5(d) 5 07/07/2026
15B-11 (g) 2026‑48 S857 53 53 10/01/2026
15B-15 2026‑53 H206 5(e) 5 07/07/2026
15B-26 (c) 2026‑53 H206 5(f) 5 07/07/2026
18B-500 (b) 2026‑41 S257 44.6(d7) 44.6K See Bill
18B-500 (b)(2) 2026‑31 S595 9(d) 9 07/02/2026
18B-804 (b)(7) 2026‑31 S595 14(d) 14 07/02/2026
18B-804A 2026‑31 S595 14(b) 14 07/02/2026
18B-804A (b) 2026‑31 S595 14(c) 14 07/01/2027
18B-805 (a) 2026‑31 S595 14(e) 14 07/02/2026
18B-902 (b) 2026‑41 S257 20.2(a) 20.2 07/07/2026
18C-111 2026‑41 S257 5.10(j) 5.91.97 07/07/2026
18C-113 (c) 2026‑40 S1041 4.7 4.7 10/01/2026
18C-120 (a), (b) 2026‑40 S1041 4.8 4.8 10/01/2026
18C-141 (a) 2026‑41 S257 22.5(u) 22.5R 07/01/2026
18C-151 (a)(4) 2026‑41 S257 22.5(v) 22.5S 07/01/2026
18C-901 (7) 2026‑31 S595 4.10 4.10 07/02/2026
20-4.01 1 2026‑41 S257 43.10(e) 43.9C 10/01/2026
20-4.01 (7a) 2 2026‑46 H1094 19(a) 19 12/01/2026
20-4.01 (28a) 3 2026‑46 H1094 20(a) 20 12/01/2026
20-4.03 2026‑46 H1094 11 11 07/07/2026
20-7 (f)(3a) 2026‑46 H1094 3(a) 3 10/01/2026
20-9 (b1) 2026‑46 H1094 9(b) 9 10/01/2026
20-11 2026‑46 H1094 9(a) 9 10/01/2026
20-13.2 (c1) 2026‑46 H1094 9(b) 9 10/01/2026
20-16.5 (j) 2026‑41 S257 16.22(a) 16.999X 12/01/2026
20-26 (b1) 2026‑41 S257 43.10(f) 43.9D 10/01/2026
20-28.2 (a1) 2026‑41 S257 43.10(g) 43.9E 10/01/2026
20-37.17 2026‑46 H1094 10(a) 10 07/01/2026
20-37.19 2026‑46 H1094 10(b) 10 07/01/2026
20-37.20A 2026‑46 H1094 10(c) 10 07/01/2026
20-37.20B 2026‑46 H1094 10(d) 10 07/01/2026
20-43.1 (e2) 2026‑46 H1094 4 4 07/07/2026
20-45 2026‑41 S257 43.10(h) 43.9F 10/01/2026
20-49 2026‑41 S257 20.2(x) 20.3D 07/07/2026
20-49 2026‑41 S257 43.10(i) 43.9G 10/01/2026
20-52 2026‑41 S257 43.10(j) 43.9H 10/01/2026
20-53.1 2026‑41 S257 43.10(k) 43.9I 10/01/2026
20-53.4 (a) 2026‑41 S257 43.10(l) 43.9J 10/01/2026
20-57 2026‑41 S257 43.10(c) 43.9A 10/01/2026
20-61 2026‑41 S257 43.10(m) 43.9K 10/01/2026
20-63 2026‑46 H1094 7(d) 7 07/07/2026
20-63 2026‑41 S257 43.10(n) 43.9L 10/01/2026
20-63 (b1) 2026‑41 S257 43.13(a) 43.13 10/01/2026
20-63 (b1)(61) 2026‑43 H747 2(a) 2 10/01/2026
20-63.1 2026‑46 H1094 6.5 6.5 07/07/2026
20-66 2026‑41 S257 43.10(d) 43.9B 10/01/2026
20-67 2026‑41 S257 43.10(o) 43.9M 10/01/2026
20-68 (a) 2026‑41 S257 43.10(p) 43.9N 10/01/2026
20-70 2026‑41 S257 43.10(q) 43.9O 10/01/2026
20-71 (a) 2026‑41 S257 43.10(r) 43.9P 10/01/2026
20-71.3 2026‑41 S257 43.10(s) 43.9Q 10/01/2026
20-72 (a) 2026‑41 S257 43.10(t) 43.9R 10/01/2026
20-76 (a), (c) 2026‑41 S257 43.10(u) 43.9S 10/01/2026
20-78 2026‑41 S257 43.10(v) 43.9T 10/01/2026
20-79 2026‑41 S257 43.10(w) 43.9U 10/01/2026
20-79 (c1) 2026‑46 H1094 6 6 07/07/2026
20-79.02 (b), (d) 2026‑41 S257 43.10(x) 43.9V 10/01/2026
20-79.4 (b) 2026‑43 H747 2(b) 2 10/01/2026
20-79.4 (b) 2026‑46 H1094 31(a) 31 07/07/2026
20-79.4 (b) 2026‑46 H1094 32(a) 32 07/07/2026
20-79.4 (b) 2026‑41 S257 43.13(b) 43.13A 10/01/2026
20-79.4 (b)(52) 1 2026‑46 H1094 30(a) 30 07/07/2026
20-79.4 (b)(106) 2 2026‑46 H1094 8 8 07/07/2026
20-79.7 2026‑46 H1094 32(b) 32 07/07/2026
20-79.7 (a1), (b) 2026‑43 H747 2(c) 2 10/01/2026
20-81.12 2026‑43 H747 2(d) 2 10/01/2026
20-81.12 2026‑46 H1094 32(c) 32 07/07/2026
20-81.12 (b30) 2026‑46 H1094 30(b) 30 07/07/2026
20-85 (a) 2026‑41 S257 43.10(y) 43.9W 10/01/2026
20-88 (c) 2026‑41 S257 43.10(z) 43.9X 10/01/2026
20-95 (a1) 2026‑41 S257 43.10(aa) 43.9Y 10/01/2026
20-110 (b) 2026‑41 S257 43.10(bb) 43.9z 10/01/2026
20-111 2026‑41 S257 43.10(cc) 43.90 10/01/2026
20-141 (b) 2026‑46 H1094 17(a) 17 12/01/2026
20-141 (e2) Local Modification 2026‑46 H1094 17.5(a) 17.5 07/07/2026
20-146 (f) 2026‑46 H1094 16(a) 16 12/01/2026
20-171.3 2026‑46 H1094 19(b) 19 12/01/2026
20-175.16 2026‑46 H1094 20(b) 20 12/01/2026
20-176 (a1) 2026‑41 S257 43.10(dd) 43.91 10/01/2026
20-183.2 (c)(4) 2026‑41 S257 43.12(a) 43.12 07/01/2026
20-183.4C (a)(6) 2026‑41 S257 43.12(b) 43.12A 07/01/2026
20-183.4C (a)(7) 2026‑41 S257 43.10(ee) 43.92 10/01/2026
20-183.4D (e) 2026‑41 S257 43.10(ff) 43.93 10/01/2026
20-183.4D (e) 2026‑41 S257 43.12(c) 43.12B 07/01/2026
20-183.7 2026‑41 S257 43.12(d) 43.12C 07/01/2026
20-183.34 2026‑41 S257 43.26(a) 43.26 07/07/2026
20-280 2026‑46 H1094 23(a) 23 07/01/2027
20-280.15 2026‑31 S595 7.3 7.3 10/01/2026
20-311 2026‑41 S257 43.10(gg) 43.94 10/01/2026
20-311 (a) 2026‑46 H1094 5(a) 5 10/01/2026
20-401 2026‑41 S257 43.10(hh) 43.95 10/01/2026
32A-16 (1) 2026‑48 S857 54 54 10/01/2026
32A-25.1 (a) 2026‑48 S857 55 55 10/01/2026
42A-39 (c1) 2026‑34 H83 3(b) 3 07/02/2026
50-110 Art. 6 2026‑41 S257 16.19(a) 16.996 07/01/2026
50-111 2026‑41 S257 16.19(a) 16.996 07/01/2026
50-112 2026‑41 S257 16.19(a) 16.996 07/01/2026
50-113 2026‑41 S257 16.19(a) 16.996 07/01/2026
50-114 2026‑41 S257 16.19(a) 16.996 07/01/2026
50-115 2026‑41 S257 16.19(a) 16.996 07/01/2026
50-116 2026‑41 S257 16.19(a) 16.996 07/01/2026
53-442 2026‑45 H920 1 1 01/01/2027
53-443 2026‑45 H920 1 1 01/01/2027
53-444 2026‑45 H920 1 1 01/01/2027
53-445 2026‑45 H920 1 1 01/01/2027
53-446 2026‑45 H920 1 1 01/01/2027
53-447 2026‑45 H920 1 1 01/01/2027
53-448 2026‑45 H920 1 1 01/01/2027
53-449 2026‑45 H920 1 1 01/01/2027
53-450 2026‑45 H920 1 1 01/01/2027
53-451 2026‑45 H920 1 1 01/01/2027
53-452 2026‑45 H920 1 1 01/01/2027
53-453 2026‑45 H920 1 1 01/01/2027
53-454 2026‑45 H920 1 1 01/01/2027
53-455 2026‑45 H920 1 1 01/01/2027
53-456 2026‑45 H920 1 1 01/01/2027
53-457 2026‑45 H920 1 1 01/01/2027
53-458 2026‑45 H920 1 1 01/01/2027
53-459 2026‑45 H920 1 1 01/01/2027
53-460 2026‑45 H920 1 1 01/01/2027
53-461 2026‑45 H920 1 1 01/01/2027
53-462 2026‑45 H920 1 1 01/01/2027
53C-2-1 2026‑41 S257 5.10(i) 5.91.96 See Bill
53C-2-3 (c), (d) 2026‑40 S1041 4.9 4.9 10/01/2026
54-109.1 2026‑31 S595 11(a) 11 07/01/2026
54-109.2 (a) 2026‑31 S595 11(g) 11 07/01/2026
54-109.11 2026‑31 S595 11(h) 11 07/01/2026
54-109.14 2026‑31 S595 11(b) 11 07/01/2026
54-109.15 2026‑31 S595 11(b) 11 07/01/2026
54-109.16 2026‑31 S595 11(b) 11 07/01/2026
54-109.17 2026‑31 S595 11(b) 11 07/01/2026
54-109.18 2026‑31 S595 11(b) 11 07/01/2026
54-109.18A 2026‑31 S595 11(b) 11 07/01/2026
54-109.19 2026‑31 S595 11(b) 11 07/01/2026
54-109.20 2026‑31 S595 11(b) 11 07/01/2026
54-109.21 2026‑31 S595 11(c) 11 07/01/2026
54-109.28 2026‑31 S595 11(d) 11 07/01/2026
54-109.60A 2026‑31 S595 11(i) 11 07/01/2026
54-109.82 2026‑31 S595 11(e) 11 07/01/2026
54-109.92 (k) 2026‑31 S595 11(f) 11 07/01/2026
54C-4 (b) 2026‑31 S595 13.2(a) 13.2 07/02/2026
54C-23 2026‑31 S595 13.2(b) 13.2 07/02/2026
54C-24 2026‑31 S595 13.2(c) 13.2 07/02/2026
54C-60 2026‑31 S595 13.2(d) 13.2 07/02/2026
54C-101 2026‑31 S595 13.2(e) 13.2 07/02/2026
54C-102 2026‑31 S595 13.2(f) 13.2 07/02/2026
55A-1-22 (a) 2026‑52 H517 3.2(a) 3.2 10/01/2026
55A-1-22 (a)(29), (a)(29a) 2026‑52 H517 2(b) 2 01/01/2027
55A-1-50 2026‑52 H517 4(a) 4 10/01/2026
55A-1-60 (a), (d) 2026‑52 H517 3.2(b) 3.2 10/01/2026
55A-8-03 2026‑52 H517 4(b) 4 10/01/2026
55A-8-11 2026‑52 H517 4(c) 4 10/01/2026
55A-8-25 2026‑52 H517 5(a) 5 10/01/2026
55A-8-25 (d), (e) 2026‑52 H517 3.2(c) 3.2 10/01/2026
55A-11-02 (a) 2026‑52 H517 1(a) 1 10/01/2026
55A-11-09 2026‑52 H517 1(b) 1 10/01/2026
55A-11A-01 Art. 11A, Part 1 2026‑52 H517 6(a) 6 10/01/2026
55A-11A-02 2026‑52 H517 6(a) 6 10/01/2026
55A-11A-03 2026‑52 H517 6(a) 6 10/01/2026
55A-11A-04 2026‑52 H517 6(a) 6 10/01/2026
55A-11A-10 Part, title 2026‑52 H517 6(b) 6 10/01/2026
55A-11B-01 Art. 11B 2026‑52 H517 3.1 3.1 10/01/2026
55A-11B-02 2026‑52 H517 3.1 3.1 10/01/2026
55A-11B-04 2026‑52 H517 3.1 3.1 10/01/2026
55A-11B-05 2026‑52 H517 3.1 3.1 10/01/2026
55A-11B-06 2026‑52 H517 3.1 3.1 10/01/2026
55A-11B-07 2026‑52 H517 3.1 3.1 10/01/2026
55A-12-02 2026‑52 H517 1(c) 1 10/01/2026
55A-14-20 2026‑52 H517 2(c) 2 01/01/2027
55A-14-22 2026‑52 H517 2(d) 2 01/01/2027
55A-16-22.1 2026‑52 H517 2(a) 2 01/01/2027
55B-11B-03 2026‑52 H517 3.1 3.1 10/01/2026
58-3-180 (b) 2026‑41 S257 32.3(a) 32.3 10/01/2026
58-6-25 2026‑41 S257 44.5(c) 44.5C 01/01/2027
58-6-25 (d) 2026‑41 S257 44.5(a) 44.5 07/01/2026
58-16-5 2026‑48 S857 66(a) 66 07/07/2026
58-16-5 2026‑48 S857 66(b) 66 07/07/2026
58-31-1 2026‑50 H1126 3.1(a) 3.1 07/07/2026
58-31A-1 (2) 2026‑41 S257 7.31(b) 7.99992 07/01/2026
58-31A-20 (a) 2026‑50 H1126 3.1(b) 3.1 07/07/2026
58-31A-25 2026‑41 S257 32A.4 32A.4 07/01/2026
58-47-140 2026‑41 S257 44.5(d) 44.5D 01/01/2027
58-58-97 (d) 2026‑48 S857 56 56 10/01/2026
58-71-75 (a), (b) 2026‑48 S857 67 67 10/01/2026
58-78A-1 2026‑41 S257 13.4(a) 13.90 01/01/2027
58-86-2 2026‑41 S257 41.29(f) 41.999 01/01/2027
58-86-20 2026‑50 H1126 3.1(c) 3.1 07/07/2026
58-86-35 2026‑41 S257 41.29(c) 41.9M 01/01/2027
58-86-40 2026‑41 S257 41.29(d) 41.9N 01/01/2027
58-86-41 2026‑50 H1126 1.5 1.5 07/07/2026
58-86-41 2026‑41 S257 41.29(b) 41.9L 01/01/2027
58-86-45 2026‑41 S257 41.29(e) 41.9O 01/01/2027
58-86-55 2026‑41 S257 41.29(a) 41.9K 01/01/2027
58-87-1 2026‑41 S257 32A.3(b) 32A.3 07/01/2026
58-87-1 (a1)(1) 2026‑41 S257 32A.3(a) 32A.3 07/01/2026
58-87-5 (a) 2026‑50 H1126 3.1(d) 3.1 07/07/2026
58-87-10 (f) 2026‑41 S257 32A.2 32A.2 07/01/2026
58-89A-5 2026‑48 S857 68(a) 68 07/07/2026
58-89A-50 2026‑48 S857 68(b) 68 07/07/2026
58-89A-60 2026‑48 S857 68(c) 68 07/07/2026
58-441 Art. 26 2026‑45 H920 1 1 01/01/2027
62-10 (h1) 2026‑41 S257 11.12 11.90 07/01/2026
62-12 2026‑40 S1041 4.10 4.9 10/01/2026
62-14 2026‑40 S1041 4.11 4.9 10/01/2026
62-14 (b) 2026‑40 S1041 5.9(h) 5.9 10/01/2026
62-14 (b) 2026‑41 S257 11.13(b) 11.91 07/01/2026
62-14 (b) 2026‑42 H56 4.8(a) 4.8B 07/01/2026
62-14 (b) 2026‑42 H56 4.8(b) 4.8F 07/01/2026
62-15 (c) 2026‑40 S1041 4.12 4.9 10/01/2026
62-48 2026‑41 S257 11.15 11.93 07/01/2026
62-71 (c) 2026‑41 S257 11.14(a) 11.92 07/01/2026
62-78 (e) 2026‑41 S257 11.14(b) 11.92 07/01/2026
62-81 (a) 2026‑41 S257 11.14(c) 11.92 07/01/2026
62-82 (a) 2026‑41 S257 11.14(d) 11.92 07/01/2026
62-133.1B (e) 2026‑32 H376 1 1 07/02/2026
62-133.15 2026‑41 S257 11.6 11.6 07/01/2026
63A-3 (b) 2026‑50 H1126 6.4 6.4 07/07/2026
63A-19 2026‑41 S257 22.5(x) 22.5T 07/01/2026
63A-19.1 2026‑41 S257 22.5(d) 22.5A 07/01/2026
63A-24 (b) 2026‑40 S1041 4.13 4.9 10/01/2026
64-60 Art. 4 2026‑54 H133 1 1 04/01/2027
64-61 2026‑54 H133 1 1 04/01/2027
64-62 2026‑54 H133 1 1 04/01/2027
64-63 2026‑54 H133 1 1 04/01/2027
64-64 2026‑54 H133 1 1 04/01/2027
65-25 (4) 2026‑40 S1041 5.7(a) 5.7 10/01/2026
65-45 2026‑41 S257 35.1(a) 35.1 07/01/2026
65-45.1 2026‑41 S257 35.1(a) 35.1 07/01/2026
65-48 (4), (7) 2026‑48 S857 57 57 10/01/2026
65-111 (3) 2026‑41 S257 37.2(a) 37.2 07/01/2026
66-58 (b)(8b) 2026‑41 S257 7.43(c) 7.9C2 07/01/2026
66-58 (c)(23) 2026‑41 S257 12.14(b) 12.93 07/01/2026
66-511 Art. 52 2026‑14 H315 1 1 06/22/2026
66-512 2026‑14 H315 1 1 06/22/2026
66-513 2026‑14 H315 1 1 06/22/2026
66-514 2026‑14 H315 1 1 06/22/2026
66-515 2026‑14 H315 1 1 06/22/2026
66-515 Art. 52 2026‑31 S595 14(a) 14 07/02/2026
72-1 2026‑41 S257 5A.17 5A.17 07/01/2026
74-24.19 (a) 2026‑40 S1041 4.14 4.9 10/01/2026
74C-8.1 (a) 2026‑41 S257 20.2(b) 20.2 07/07/2026
74C-30 (d) 2026‑50 H1126 3.1(e) 3.1 07/07/2026
74D-30 (d) 2026‑50 H1126 3.1(f) 3.1 07/07/2026
75-44 (a) 2026‑41 S257 5.8(b) 5.8 10/01/2026
75-44 (b) 2026‑41 S257 5.8(b) 5.8 10/01/2026
75-44 (c) 2026‑41 S257 5.8(b) 5.8 10/01/2026
75-45 2026‑31 S595 14(h) 14 07/02/2026
75-151 Art. 9 1 2026‑41 S257 5.8(a) 5.8 10/01/2026
75-151 2 2026‑41 S257 5.8(b) 5.8 10/01/2026
75-151 3 2026‑41 S257 5.8(c) 5.8 10/01/2026
75-152 2026‑41 S257 5.8(b) 5.8 10/01/2026
75-152 2026‑41 S257 5.8(c) 5.8 10/01/2026
75-153 2026‑41 S257 5.8(c) 5.8 10/01/2026
75-154 2026‑41 S257 5.8(c) 5.8 10/01/2026
75-155 2026‑41 S257 5.8(c) 5.8 10/01/2026
75-156 2026‑41 S257 5.8(c) 5.8 10/01/2026
75-157 2026‑41 S257 5.8(b) 5.8 10/01/2026
75-157 2026‑41 S257 5.8(c) 5.8 10/01/2026
75A-3 (c) 2026‑41 S257 15.1(f) 15.1 10/01/2026
75A-5 2026‑41 S257 15.1(g) 15.1 10/01/2026
75A-5 (b) 2026‑43 H747 3(a) 3 10/01/2026
75A-6.1 (a) 2026‑43 H747 3(c) 3 10/01/2026
75A-7 (a)(1) 2026‑43 H747 3(b) 3 10/01/2026
75A-13.3 (d), (e) 2026‑43 H747 3(d) 3 10/01/2026
78A-36 (b) 2026‑41 S257 37.1(b) 37.1B 07/01/2026
78A-37 (b) 2026‑41 S257 37.1(a) 37.1 07/01/2026
81A-32 2026‑31 S595 14(i) 14 07/02/2026
81A-52 2026‑11 S401 13(a) 13 06/22/2026
81A-54 2026‑11 S401 13(b) 13 06/22/2026
84-22.1 2026‑41 S257 16.25(b) 16.9992 07/01/2026
84-24 2026‑41 S257 20.2(c) 20.2 07/07/2026
87-96 2026‑32 H376 8(a) 8 07/02/2026
87-97 (a) 2026‑32 H376 8(b) 8 07/02/2026
88B-25 2026‑48 S857 58 58 10/01/2026
89C-3 2026‑41 S257 38A.1(a) 38A.1 07/01/2022
89C-3 2026‑41 S257 38A.1(c) 38A.1B 10/01/2026
89C-10 2026‑41 S257 38A.1(d) 38A.1C 10/01/2026
89C-12 2026‑41 S257 38A.1(e) 38A.1D 10/01/2026
89C-13 2026‑41 S257 38A.1(f) 38A.1E 10/01/2026
89C-13 (b)(1) 2026‑41 S257 38A.1(b) 38A.1A 07/01/2022
89C-14 2026‑41 S257 38A.1(g) 38A.1F 10/01/2026
89C-16 2026‑41 S257 38A.1(h) 38A.1G 10/01/2026
89C-17 2026‑41 S257 38A.1(i) 38A.1H 10/01/2026
89C-23 2026‑41 S257 38A.1(j) 38A.1I 10/01/2026
89C-25 (12) 2026‑41 S257 38A.1(k) 38A.1J 10/01/2026
89C-25.2 2026‑41 S257 38A.1(l) 38A.1K 10/01/2026
90-11 (b) 2026‑41 S257 20.2(e) 20.2A 07/07/2026
90-13.1 2026‑41 S257 9L.1(a) 9L.1 10/01/2026
90-13.2 2026‑41 S257 9L.1(b) 9L.1 10/01/2026
90-30 (b) 2026‑41 S257 20.2(f) 20.2B 07/07/2026
90-95 (e) 2026‑ H437 1(b) 1 12/01/2026 Vetoed
90-102.1 (d) 2026‑41 S257 20.2(g) 20.2C 07/07/2026
90-210.18A 2026‑48 S857 3 3 10/012026
90-210.18A 2026‑48 S857 5 5 10/01/2026
90-210.19 2026‑48 S857 2 2 10/01/2026
90-210.20 2026‑48 S857 6 6 10/01/2026
90-210.20 2026‑48 S857 7 7 10/01/2026
90-210.22 catch line 1 2026‑48 S857 1 1 10/01/2026
90-210.22 2 2026‑48 S857 3 3 10/01/2026
90-210.22 3 2026‑48 S857 4 4 10/01/2026
90-210.22 4 2026‑48 S857 8 8 10/01/2026
90-210.22 (b) 5 2026‑48 S857 2 2 10/01/2026
90-210.23 2026‑48 S857 4 4 10/01/2026
90-210.23 2026‑48 S857 9 9 10/01/2026
90-210.23 2026‑48 S857 18 18 10/01/2026
90-210.23 (g) 2026‑48 S857 18 18 10/01/2026
90-210.24 2026‑48 S857 10 10 10/01/2026
90-210.25 catch line 1 2026‑48 S857 11 11 10/01/2026
90-210.25 2 2026‑48 S857 6 6 10/01/2026
90-210.25 2 2026‑48 S857 20 20 10/01/2026
90-210.25 2 2026‑48 S857 23 23 10/01/2026
90-210.25 2 2026‑48 S857 32 32 10/01/2026
90-210.25 2 2026‑48 S857 45 45 10/01/2026
90-210.25 2 2026‑48 S857 12 12 10/01/2026
90-210.25 2 2026‑48 S857 39 39 10/01/2026
90-210.25 (a)(1), (a)(3a) 3 2026‑48 S857 14 14 10/01/2026
90-210.25 (a)(2), (d1) 3.5 2026‑48 S857 16 16 10/01/2026
90-210.25 (a)(3) 6 2026‑48 S857 13 13 10/01/2026
90-210.25 (a)(4) 7 2026‑48 S857 21 21 10/01/2026
90-210.25 (a)(5)b. 7.4 2026‑48 S857 37 37 10/01/2026
90-210.25 (a)(5)h. 7.45 2026‑41 S257 20.2(h) 20.2C 07/07/2026
90-210.25 (a)(5)h. 7.5 2026‑48 S857 43 43 10/01/2026
90-210.25 (a1) 7.55 2026‑48 S857 22 22 10/01/2026
90-210.25 (a2) 7.56 2026‑48 S857 15 15 10/01/2026
90-210.25 (b)(1), (b)(3) 7.7 2026‑48 S857 19 19 10/01/2026
90-210.25 (c)(5) 7.8 2026‑48 S857 34 34 10/01/2026
90-210.25 (c)(6), (c)(9) 7.9 2026‑48 S857 35 35 10/01/2026
90-210.25 (d)(1) 8 2026‑48 S857 24 24 10/01/2026
90-210.25 (d)(4) 8.1 2026‑48 S857 42 42 10/01/2026
90-210.25 (e) 8.2 2026‑48 S857 26 26 10/01/2026
90-210.25 (e) 8.2 2026‑48 S857 28 28 10/01/2026
90-210.25 (e) 8.2 2026‑48 S857 30 30 10/01/2026
90-210.25 (e)(1) 8.3 2026‑48 S857 40 40 10/01/2026
90-210.25 (e)(2) 8.4 2026‑48 S857 41 41 10/01/2026
90-210.25 (e1) 9 2026‑48 S857 31 31 10/01/2026
90-210.25B (d) 2026‑48 S857 59 59 10/01/2026
90-210.25C 2026‑48 S857 29 29 10/01/2026
90-210.25D 2026‑48 S857 13 13 10/01/2026
90-210.25E 2026‑48 S857 14 14 10/01/2026
90-210.25F 2026‑48 S857 15 15 10/01/2026
90-210.25G 2026‑48 S857 16 16 10/01/2026
90-210.25H 2026‑48 S857 17 17 10/01/2026
90-210.25I 2026‑48 S857 18 18 10/01/2026
90-210.25J (a), (b) 2026‑48 S857 19 19 10/01/2026
90-210.25K 2026‑48 S857 20 20 10/01/2026
90-210.25L 2026‑48 S857 21 21 10/01/2026
90-210.25M 2026‑48 S857 22 22 10/01/2026
90-210.25N 2026‑48 S857 23 23 10/01/2026
90-210.25O 2026‑48 S857 24 24 10/01/2026
90-210.27A 2026‑48 S857 24 24 10/01/2026
90-210.27A 2026‑48 S857 25 25 10/01/2026
90-210.27B 2026‑48 S857 26 26 10/01/2026
90-210.27C 2026‑48 S857 27 27 10/01/2026
90-210.27D 2026‑48 S857 28 28 10/01/2026
90-210.27E 2026‑48 S857 29 29 10/01/2026
90-210.27F 2026‑48 S857 30 30 10/01/2026
90-210.27G 2026‑48 S857 31 31 10/01/2026
90-210.27H 2026‑48 S857 32 32 10/01/2026
90-210.27I 2026‑48 S857 33 33 10/01/2026
90-210.27J 2026‑48 S857 34 34 10/01/2026
90-210.27K (a), (b) 2026‑48 S857 35 35 10/01/2026
90-210.27L 2026‑48 S857 36 36 10/01/2026
90-210.27M 2026‑48 S857 37 37 10/01/2026
90-210.28 2026‑48 S857 38 38 10/01/2026
90-210.28A 2026‑48 S857 39 39 10/01/2026
90-210.28B 2026‑48 S857 40 40 10/01/2026
90-210.28C 2026‑48 S857 41 41 10/01/2026
90-210.28D 2026‑48 S857 42 42 10/01/2026
90-210.28E 2026‑48 S857 43 43 10/01/2026
90-210.29 (a) 2026‑48 S857 18 18 10/01/2026
90-210.29A 2026‑48 S857 27 27 10/01/2026
90-210.29C 2026‑48 S857 44 44 10/01/2026
90-210.60 2026‑48 S857 46 46 10/01/2026
90-210.61 2026‑48 S857 46 46 10/01/2026
90-210.67 2026‑48 S857 46 46 10/01/2026
90-210.68 2026‑48 S857 46 46 10/01/2026
90-210.69 (c), (d) 2026‑48 S857 60 60 10/01/2026
90-210.80 2026‑48 S857 61 61 10/01/2026
90-210.81 2026‑48 S857 62 62 10/01/2026
90-210.85 2026‑48 S857 47 47 10/01/2026
90-210.107 (i) 2026‑48 S857 48 48 10/01/2026
90-210.120 2026‑48 S857 51 51 10/01/2026
90-210.121 2026‑48 S857 49 49 10/01/2026
90-210.121 2026‑48 S857 51 51 10/01/2026
90-210.123 2026‑48 S857 51 51 10/01/2026
90-210.124A 2026‑48 S857 51 51 10/01/2026
90-210.125 2026‑48 S857 51 51 10/01/2026
90-210.126 2026‑48 S857 51 51 10/01/2026
90-210.127 2026‑48 S857 51 51 10/01/2026
90-210.128 2026‑48 S857 51 51 10/01/2026
90-210.129 2026‑48 S857 51 51 10/01/2026
90-210.129 (d1) 2026‑48 S857 50 50 10/01/2026
90-210.130 2026‑48 S857 51 51 10/01/2026
90-210.131 2026‑48 S857 51 51 10/01/2026
90-210.132 2026‑48 S857 51 51 10/01/2026
90-210.133 2026‑48 S857 51 51 10/01/2026
90-210.134 2026‑48 S857 51 51 10/01/2026
90-210.135 2026‑48 S857 51 51 10/01/2026
90-210.136 2026‑48 S857 51 51 10/01/2026
90-210.136 (g) 2026‑48 S857 50 50 10/01/2026
90-224 (c) 2026‑41 S257 20.2(i) 20.2D 07/07/2026
90-270.51 (f) 2026‑40 S1041 4.15 4.9 10/01/2026
90-270.90 (4) 2026‑16 H536 1 1 10/01/2026
90-270.91 2026‑16 H536 2 2 10/01/2026
90-270.92 2026‑16 H536 3 3 10/01/2026
90-270.93 2026‑16 H536 4 4 10/01/2026
90-270.95 2026‑16 H536 5 5 10/01/2026
90-270.96 (a) 2026‑16 H536 6 6 10/01/2026
90-270.97 2026‑16 H536 7 7 10/01/2026
90-270.98 2026‑16 H536 8 8 10/01/2026
90-270.99 2026‑16 H536 9 9 10/01/2026
90-270.100 2026‑16 H536 10 10 10/01/2026
90-270.101 2026‑16 H536 11 11 10/01/2026
90-270.102 2026‑16 H536 12 12 10/01/2026
90-270.103 2026‑16 H536 13 13 10/01/2026
90-333 (h) 2026‑40 S1041 4.16 4.9 10/01/2026
90-414.4 2026‑38 H1104 12(a) 12 07/06/2026
90-414.8 (a) 2026‑38 H1104 12(b) 12 07/06/2026
90-689 2026‑41 S257 9L.1(c) 9L.1 10/01/2026
90A-72 (a) 2026‑32 H376 6(a) 6 01/01/2027
90A-77 (a)(3b)d. 2026‑32 H376 6(b) 6 01/01/2027
90A-78 (a)(4) 2026‑32 H376 6(c) 6 01/01/2027
90B-5 (e) 2026‑40 S1041 4.17 4.9 10/01/2026
90D-7 (c) 2026‑41 S257 20.2(d) 20.2 07/07/2026
93A-3 2026‑41 S257 5.10(n) 5.91.991 07/07/2026
93A-4 (b1) 2026‑41 S257 20.2(j) 20.2E 07/07/2026
93B-15.3 2026‑48 S857 69(a) 69 See Bill
95-14.2 2026‑41 S257 13.2(a) 13.2 07/07/2026
95-25.1 2026‑41 S257 39.7(b) 39.7A 10/01/2026
95-25.5 (o) 2026‑49 S648 1(b) 1 10/01/2026
95-47.2 (d)(2a) 2026‑41 S257 20.2(k) 20.2F 07/07/2026
95-79 2026‑41 S257 39.7(a) 39.7 10/01/2026
95-127 (3) 2026‑40 S1041 4.18 4.9 10/01/2026
95-242 2026‑13 H258 1 1 06/22/2026
95-246 2026‑13 H258 2 2 06/22/2026
95-280 Art. 24 2026‑41 S257 13.3(a) 13.3 01/01/2027
95-281 2026‑41 S257 13.3(a) 13.4 01/01/2027
95-282 2026‑41 S257 13.3(a) 13.5 01/01/2027
95-283 2026‑41 S257 13.3(a) 13.6 01/01/2027
95-284 2026‑41 S257 13.3(a) 13.7 01/01/2027
95-285 2026‑41 S257 13.3(a) 13.8 01/01/2027
95-286 2026‑41 S257 13.3(a) 13.9 01/01/2027
97-29 (a) 2026‑14 H315 2(a) 2 07/01/2027
97-31 2026‑14 H315 2(b) 2 07/01/2027
97-77 2026‑41 S257 5.10(p) 5.91.993 07/07/2026
97-77 (b) 2026‑40 S1041 4.19 4.9 10/01/2026
99A-2 (e) 2026‑40 S1041 4.20 4.9 10/01/2026
99C-1 2026‑49 S648 1(a) 1 10/01/2026
99C-2 2026‑49 S648 1(a) 1 10/01/2026
99C-3 2026‑49 S648 1(a) 1 10/01/2026
99C-4 2026‑49 S648 1(a) 1 10/01/2026
99C-5 2026‑49 S648 1(a) 1 10/01/2026
99C-6 2026‑49 S648 1(a) 1 10/01/2026
99C-7 2026‑49 S648 1(a) 1 10/01/2026
99C-8 2026‑49 S648 1(a) 1 10/01/2026
99C-9 2026‑49 S648 1(a) 1 10/01/2026
99C-10 2026‑49 S648 1(a) 1 10/01/2026
99C-11 2026‑49 S648 1(a) 1 10/01/2026
99C-12 2026‑49 S648 1(a) 1 10/01/2026
99C-13 2026‑49 S648 1(a) 1 10/01/2026
99C-14 2026‑49 S648 1(a) 1 10/01/2026
105-113.4 2026‑41 S257 44.6(a1) 44.6 07/01/2027
105-113.4 (10b) 2026‑31 S595 4.11(a) 4.11 07/01/2026
105-113.4B (a2) 2026‑41 S257 44.6(d5) 44.6I 07/07/2026
105-113.4I 2026‑41 S257 44.6(a2) 44.6A 07/01/2027
105-113.36A (a)(2a) 2026‑31 S595 4.11(b) 4.11 07/01/2026
105-113.39A 2026‑31 S595 4.12 4.12 07/02/2026
105-113.39A 2026‑41 S257 44.6(a3) 44.6B 07/01/2027
105-113.39A (a2) 2026‑31 S595 4.1 4.1 07/02/2026
105-113.83 (a1) 2026‑31 S595 4.13 4.13 07/02/2026
105-113.83A (a) 2026‑31 S595 4.14 4.14 07/02/2026
105-113.83A (a)(12) 2026‑31 S595 4.2 4.2 07/02/2026
105-113.84 catch line, (a) 2026‑31 S595 4.15(a) 4.15 07/01/2026
105-113.126 (a) 2026‑41 S257 44.7(a) 44.7 07/07/2026
105-113.128 2026‑41 S257 44.7(b) 44.7B 07/01/2026
105-113.128 (5) 2026‑41 S257 44.7(c) 44.7C 07/01/2027
105-113.130 Art. 2F 2026‑41 S257 44.9(a) 44.9 01/01/2027
105-113.131 2026‑41 S257 44.9(a) 44.9A 01/01/2027
105-114.1 (d) 2026‑31 S595 8.1 8.1 07/02/2026
105-120.2 (b) 2026‑31 S595 8.2(b) 8.2 07/02/2026
105-122 (b) 2026‑31 S595 8.4(a) 8.4 01/01/2019
105-122 (b)(2a) 2026‑31 S595 8.7(a) 8.7 01/01/2021
105-122 (d2) 2026‑31 S595 8.2(a) 8.2 07/02/2026
105-129.71 (a2) 2026‑31 S595 8.5(a) 8.5 01/01/2026
105-130.5 2026‑31 S595 2(d) 2 01/01/2026
105-130.5 2026‑31 S595 12(c) 12 07/02/2026
105-130.5 (b)(31a) 2026‑31 S595 8.6(a) 8.6 01/01/2026
105-130.5C 2026‑31 S595 12(b) 12 07/02/2026
105-130.9 (4) 2026‑11 S401 24(b) 24 06/22/2026
105-130.34A 2026‑11 S401 24(b) 24 06/22/2026
105-130.34A 2026‑31 S595 1.5(a) 1.5 07/02/2026
105-131.1 (b) 2026‑31 S595 8.3 8.3 07/02/2026
105-153.5 2026‑31 S595 1.8(a) 1.8 01/01/2026
105-153.5 2026‑31 S595 12(e) 12 07/02/2026
105-153.5 (a) 2026‑41 S257 44.2(a) 44.2 01/01/2025
105-153.5 (a)(2)a. 2026‑11 S401 24(b) 24 06/22/2026
105-153.5 (b)(17) 2026‑31 S595 1.6 1.6 07/02/2026
105-153.5 (c1) 2026‑31 S595 1.1(a) 1.1 01/01/2026
105-153.5 (c2) 2026‑31 S595 2(c) 2 01/01/2026
105-153.5A (a) 2026‑31 S595 1.2(b) 1.2 01/01/2026
105-153.5A (g) 2026‑31 S595 1.2(a) 1.2 07/02/2026
105-153.6A 2026‑31 S595 12(d) 12 07/02/2026
105-153.7 2026‑41 S257 44.1(a) 44.1 07/07/2026
105-153.11 2026‑11 S401 24(a) 24 06/22/2026
105-153.11 2026‑11 S401 24(b) 24 06/22/2026
105-153.11 2026‑31 S595 1.5(b) 1.5 07/02/2026
105-154.1 (c) 2026‑31 S595 1.9(a) 1.9 01/01/2026
105-154.2 2026‑31 S595 2(a) 2 01/01/2026
105-157 (a) 2026‑31 S595 1.10 1.10 07/02/2026
105-160.2 2026‑31 S595 1.3(a) 1.3 01/01/2026
105-163.2C 2026‑31 S595 16(a) 16 01/01/2027
105-163.6 2026‑31 S595 1.4 1.4 07/02/2026
105-163.15 (f) 2026‑31 S595 1.11 1.11 07/02/2026
105-164.3 (218) 2026‑31 S595 3.4(a) 3.4 07/02/2026
105-164.3 (259) 2026‑31 S595 3.2 3.2 07/02/2026
105-164.8 (b) 2026‑31 S595 3.1(a) 3.1 07/02/2026
105-164.10 2026‑31 S595 14(f) 14 07/02/2026
105-164.11 2026‑31 S595 14(g) 14 07/02/2026
105-164.13 2026‑41 S257 44.4(a) 44.4 07/07/2026
105-164.13 2026‑42 H56 11.3(c) 9.1H 07/07/2026
105-164.13 (5m) 2026‑31 S595 3.4(b) 3.4 07/02/2026
105-164.13B (a)(4)b. 2026‑31 S595 3.4(c) 3.4 07/02/2026
105-164.14 (b) 2026‑41 S257 44.3(a) 44.3 07/07/2026
105-164.14 (b) 2026‑42 H56 11.2(a) 9.1D 07/07/2026
105-164.16 (b2) 2026‑31 S595 3.5 3.5 07/02/2026
105-164.44K (a) 2026‑42 H56 11.3(b) 9.1F 07/07/2026
105-187.1 (a) 2026‑31 S595 7.1(a) 7.1 10/01/2026
105-187.1 (a)(6) 2026‑46 H1094 32.5(a) 32.5 10/01/2026
105-187.3 (a) 2026‑31 S595 7.1(b) 7.1 10/01/2026
105-187.4 (a) 2026‑31 S595 7.1(c) 7.1 10/01/2026
105-187.5 2026‑31 S595 7.1(d) 7.1 10/01/2026
105-187.19 (a) 2026‑41 S257 36.2 36.2 07/01/2026
105-187.19 (b) 2026‑41 S257 12.15(a) 12.94 07/01/2026
105-187.24 2026‑41 S257 36.1 36.1 07/01/2026
105-187.90 (9) 2026‑31 S595 3.3(a) 3.3 07/02/2026
105-187.95 2026‑31 S595 3.3(b) 3.3 07/02/2026
105-228.4A (a), (b) 2026‑41 S257 44.5(e) 44.5E 01/01/2027
105-228.5 2026‑41 S257 44.5(b) 44.5B 01/01/2027
105-228.8 (e) 2026‑41 S257 44.5(f) 44.5F 01/01/2027
105-228.90 2026‑31 S595 5.1 5.1 07/02/2026
105-228.90 (b) 2026‑31 S595 2(b) 2 01/01/2026
105-228.90 (b)(7) 2026‑31 S595 12(a) 12 07/02/2026
105-236 (a) 2026‑31 S595 5.2 5.2 07/02/2026
105-241.6 (b)(7) 2026‑31 S595 2(e) 2 01/01/2026
105-241.8 (b)(6) 2026‑31 S595 2(f) 2 01/01/2026
105-249.2 catch line, (b) 2026‑31 S595 5.3 5.3 07/02/2026
105-251.2 (c1) 2026‑31 S595 5.4 5.4 07/02/2026
105-251.2 (c1) 2026‑42 H56 11.3(a) 9.1E 07/07/2026
105-259 2026‑31 S595 5.5 5.5 07/02/2026
105-259 (b)(39a) 2026‑50 H1126 4.1(h) 4.1 01/01/2027
105-274.1 2026‑31 S595 6.3 6.3 07/02/2026
105-277.02 (e) 2026‑12 S695 2 2 07/01/2027
105-277.03 2026‑12 S695 1 1 07/01/2027
105-277.2 (4)c. 2026‑41 S257 44.10(a) 44.9B 01/01/2026
105-278.2 2026‑31 S595 6.1 6.1 07/02/2026
105-282.1 (a)(2)c. 2026‑12 S695 3 3 07/01/2027
105-294 2026‑8 S889 2 2 10/01/2026
105-330.4 (a) 2026‑41 S257 43.10(ii) 43.96 10/01/2026
105-357 2026‑31 S595 14(j) 14 07/02/2026
105-449.37 (a)(1) 2026‑31 S595 4.16 4.16 07/02/2026
105-449.42 2026‑31 S595 4.3(a) 4.3 07/02/2026
105-449.60 (12) 1 2026‑31 S595 4.4(b) 4.4 07/02/2026
105-449.60 (43a) 2 2026‑31 S595 4.4(a) 4.4 07/02/2026
105-449.60 (46)e. 3 2026‑31 S595 4.5(a) 4.5 07/02/2026
105-449.69 (e) 2026‑31 S595 4.6(a) 4.6 07/02/2026
105-449.72 (a)(1)f. 2026‑31 S595 4.5(c) 4.5 07/02/2026
105-449.76 (a) 2026‑31 S595 4.6(b) 4.6 07/02/2026
105-449.87 (a)(3) 2026‑31 S595 4.7 4.7 07/02/2026
105-449.97 (e) 2026‑31 S595 4.5(b) 4.5 07/02/2026
105-449.139 (d) 2026‑31 S595 4.8 4.8 07/02/2026
105-506.3 Local Modification 2026‑41 S257 44.11(c) 44.9G 07/07/2026
105-513.1 Art. 43A Local Modification 2026‑41 S257 44.11(b) 44.9C 07/07/2026
105-513.2 Local Modification 2026‑41 S257 44.11(b) 44.9D 07/07/2026
105-513.3 Local Modification 2026‑41 S257 44.11(b) 44.9E 07/07/2026
105-513.4 Local Modification 2026‑41 S257 44.11(b) 44.9F 07/07/2026
105-537 Local Modification 2026‑26 S1074 3(b) 3 07/02/2026
105-538 Local Modification 2026‑26 S1074 3(c) 3 07/02/2026
105-550 2026‑31 S595 7.2(c) 7.2 10/01/2026
105-551 (a) 2026‑31 S595 7.2(d) 7.2 10/01/2026
105-552 2026‑31 S595 7.2(e) 7.2 10/01/2026
106-2 2026‑41 S257 5.10(m) 5.91.99 07/07/2026
106-581.1 (8) 2026‑11 S401 17 17 06/22/2026
106-758 2026‑11 S401 20(a) 20 06/22/2026
106-761 (b) 2026‑11 S401 20(b) 20 06/22/2026
106-803 (a2) 2026‑11 S401 5(a) 5 06/22/2026
106-942 2026‑11 S401 10 10 06/22/2026
106-1055 Art. 86 2026‑11 S401 22 22 06/22/2026
106-1056 2026‑11 S401 22 22 06/22/2026
106-1057 2026‑11 S401 22 22 06/22/2026
106-1058 2026‑11 S401 22 22 06/22/2026
106-1059 2026‑11 S401 22 22 06/22/2026
108A-15.25 Art. 1, Part 2C 2026‑41 S257 9J.15(b) 9J.15 10/01/2026
108A-15.26 2026‑41 S257 9J.15(b) 9J.15 10/01/2026
108A-15.27 2026‑41 S257 9J.15(b) 9J.15 10/01/2026
108A-15.28 2026‑41 S257 9J.15(b) 9J.15 10/01/2026
108A-52.2 2026‑41 S257 9J.14(a) 9J.14 10/01/2027
108A-54.3A (a)(25) 2026‑41 S257 9E.18(a) 9E.95 10/01/2026
108A-54.3A (c) 2026‑41 S257 9E.18(b) 9E.95 10/01/2026
108A-55.5 2026‑41 S257 9E.20(a) 9E.97 10/01/2026
108A-58.3 2026‑41 S257 9E.19(a) 9E.96 07/01/2027
108A-58.3 2026‑42 H56 3.1(a) 3.1 07/07/2026
108A-58.3 2026‑42 H56 3.1(b) 3.1B 07/01/2027
108A-77.1 (7), (10) 2026‑41 S257 9J.10(a) 9J.10 07/07/2026
108A-77.4 (c) 2026‑41 S257 9J.10(b) 9J.10 07/07/2026
108A-112 2026‑31 S595 13.1(a) 13.1 07/02/2026
108A-113 2026‑31 S595 13.1(b) 13.1 07/02/2026
108A-115 2026‑31 S595 13.1(c) 13.1 07/02/2026
108A-117.1 2026‑31 S595 13.1(d) 13.1 07/02/2026
108A-117.1 (k) 2026‑42 H56 3.3 3.3 07/01/2026
108A-117.2 2026‑31 S595 13.1(d) 13.1 07/02/2026
108A-145.3 (6d) 1 2026‑41 S257 44.5(g) 44.5G 01/01/2027
108A-145.3 (19) 2 2026‑41 S257 9E.8(a) 9E.8 07/01/2026
108A-145.3 (21) 3 2026‑41 S257 9E.8(b) 9E.8 07/01/2026
108A-147.7A 2026‑41 S257 9E.9(d) 9E.90 See Bill
108A-147.7A (b) 2026‑41 S257 9E.9(a) 9E.9 01/01/2027
108A-147.7A (b), (c) 2026‑41 S257 9E.9(c) 9E.90 See Bill
108D-22 2026‑41 S257 9E.22(b) 9E.99 07/07/2026
108D-24 2026‑41 S257 9E.22(c) 9E.990 07/07/2026
108D-65 2026‑41 S257 9E.24(a) 9E.992 07/07/2026
108D-65 (a) 2026‑41 S257 9E.17(a) 9E.94 07/07/2026
110-90.2 (c) 2026‑41 S257 20.2(l) 20.2G 07/07/2026
110-91 (8) 2026‑41 S257 9D.10(a) 9D.50 07/01/2026
113-129 (7c) 2026‑43 H747 5 5 10/01/2026
113-173.1 (a) 2026‑50 H1126 3.1(g) 3.1 07/07/2026
113-175.1 (b) 2026‑50 H1126 3.1(h) 3.1 07/07/2026
113-175.5 (b) 2026‑50 H1126 3.1(i) 3.1 07/07/2026
113-187 (f) 2026‑11 S401 15(a) 15 12/01/2026
113-202 (g) 2026‑11 S401 21(b) 21 06/22/2026
113-218 2026‑11 S401 16(b) 16 12/01/2026
113-269 2026‑11 S401 16(c) 16 12/01/2026
113-291.8 2026‑43 H747 6 6 10/01/2026
113-315.36 2026‑41 S257 22.5(c) 22.5 07/01/2026
113A-129.2 2026‑41 S257 12.21 12.21 07/01/2026
114-2.2 2026‑41 S257 16.20(r) 16.999Q 07/01/2027
114-2.4 2026‑41 S257 16.20(s) 16.999R 07/01/2027
114-4 2026‑40 S1041 4.21 4.9 10/01/2026
114-4.2B 2026‑40 S1041 4.22 4.9 10/01/2026
114-4.2C 2026‑40 S1041 4.23 4.9 10/01/2026
115-218.110 (b) 2026‑41 S257 7.7(n) 7.795 07/01/2026
115B-1 2026‑44 S355 1.1(a) 1.1 07/07/2026
115B-2 (a) 2026‑44 S355 1.1(b) 1.1 07/07/2026
115B-2 (a)(6) 2026‑41 S257 7.31(c) 7.99993 07/01/2026
115B-5 (b) 2026‑44 S355 1.1(c) 1.1 07/07/2026
115C-5 (3a), (7a) 2026‑41 S257 7.31(d) 7.99994 07/01/2026
115C-10.1 2026‑41 S257 7.61(a) 7.9N 07/07/2026
115C-11 (d) 2026‑41 S257 7.4(c) 7.42 07/01/2026
115C-11 (e) 2026‑41 S257 7.4(d) 7.43 07/01/2026
115C-12 (9)b. 1 2026‑41 S257 7.4(e) 7.44 07/01/2026
115C-12 (9c)c. 2 2026‑41 S257 7.4(f) 7.45 07/01/2026
115C-12 (9c)d. 3 2026‑20 S227 1 1 06/24/2026
115C-12 (18)d. 4 2026‑41 S257 7.4(g) 7.46 07/01/2026
115C-12 (22) 5 2026‑41 S257 7.7(i) 7.79 07/01/2026
115C-12 (25) 6 2026‑41 S257 7.7(a) 7.7 07/01/2026
115C-12 (28) 7 2026‑46 H1094 9(b) 9 10/01/2026
115C-12 (48) 8 2026‑41 S257 7.7(e) 7.75 07/01/2026
115C-21 (a) 2026‑41 S257 7.7(a1) 7.71 07/01/2026
115C-21 (a)(1) 2026‑40 S1041 4.24 4.9 10/01/2026
115C-31 (f) 2026‑41 S257 6.2(e) 6.23 07/01/2026
115C-37.1 (d) Local Modification 2026‑25 S876 6(d) 6 12/04/2028
115C-47 2026‑41 S257 7.4(h) 7.47 07/01/2026
115C-47 (18) 2026‑20 S227 2.5(a) 2.5 06/24/2026
115C-47 (33d) 2026‑41 S257 7.54(c) 7.9I2 07/07/2026
115C-47 (73) 2026‑41 S257 7.33(a) 7.999998 07/07/2026
115C-47 (73) 2026‑41 S257 7.38(b) 7.9999999 07/07/2026
115C-47 (73) 2026‑41 S257 7.39(f) 7.99999996 07/01/2026
115C-64.25 Art. 6D 2026‑41 S257 7.55(a) 7.9J 07/07/2026
115C-64.26 2026‑41 S257 7.55(a) 7.9J 07/07/2026
115C-64.27 2026‑41 S257 7.55(a) 7.9J 07/07/2025
115C-64.28 2026‑41 S257 7.55(a) 7.9J 07/07/2025
115C-64.28 (b) 2026‑40 S1041 4.25 4.9 10/01/2026
115C-76.25 (a) 2026‑41 S257 7.4(i) 7.48 07/01/2026
115C-76.30 (a) 2026‑41 S257 7.4(j) 7.49 07/01/2026
115C-76.35 (b) 2026‑41 S257 7.4(k) 7.491 07/01/2026
115C-76.55 2026‑41 S257 7.4(l) 7.492 07/01/2026
115C-76.200 2026‑20 S227 2 2 06/24/2026
115C-76.205 2026‑20 S227 2 2 06/24/2026
115C-76.210 2026‑20 S227 2 2 06/24/2026
115C-81.5 (b)(3) 2026‑41 S257 7.4(m) 7.493 07/01/2026
115C-81.20 (g) 2026‑41 S257 7.52(b) 7.9G1 07/01/2026
115C-81.25 (b)(3) 2026‑41 S257 7.4(n) 7.494 07/01/2026
115C-81.25 (c) 2026‑41 S257 7.52(a) 7.9G 07/01/2026
115C-81.25 (d) 2026‑41 S257 7.4(o) 7.495 07/01/2026
115C-81.36 2026‑41 S257 7.9(a) 7.9 07/07/2026
115C-81.45 (d)(4) 2026‑41 S257 7.7(b) 7.72 07/01/2026
115C-81.90 (a1) 2026‑41 S257 7.39(a) 7.99999994 07/01/2026
115C-83.4B (b) 2026‑41 S257 7.27(a) 7.9998 07/01/2026
115C-83.6 2026‑41 S257 7.8(a) 7.8 07/01/2026
115C-83.6B (a) 2026‑41 S257 7.8(b) 7.81 07/01/2026
115C-83.9 (a) 2026‑41 S257 7.8(c) 7.82 07/01/2026
115C-83.10 (b) 2026‑41 S257 7.8(d) 7.83 07/01/2026
115C-83.15 2026‑41 S257 7.31(e) 7.99995 07/01/2026
115C-85 Art. 8, Part 3, title 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-85.1 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-86 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-87 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-88 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-89 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-90 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-91 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-92 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-93 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-94 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-95 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-96 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-97 2026‑41 S257 7.4(a) 7.4 07/01/2026
115C-98 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-98.1 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-98.5 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-99 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-100 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-101 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-102 2026‑41 S257 7.4(b) 7.41 07/01/2026
115C-102.6D (b) 2026‑41 S257 5.5(f) 5.5 07/01/2026
115C-102.13 2026‑41 S257 7.39(e) 7.99999995 07/01/2026
115C-102.14 2026‑41 S257 7.39(l) 7.9A 07/01/2026
115C-105.25 (b)(12) 2026‑41 S257 7.4(p) 7.496 07/01/2026
115C-105.42A Art. 8B, Part 4 2026‑41 S257 7.36(a) 7.9999995 07/01/2026
115C-105.42D 2026‑41 S257 7.36(a) 7.9999995 07/01/2026
115C-105.42F 2026‑41 S257 7.36(a) 7.9999995 07/01/2026
115C-105-42H 2026‑41 S257 7.36(a) 7.9999995 07/01/2026
115C-105.53 (a) 2026‑41 S257 20.10.(a) 20.8C 07/01/2026
115C-105.54 (a) 2026‑41 S257 20.10(b) 20.8D 07/01/2026
115C-107.3 (a) 2026‑41 S257 7.7(p) 7.797 07/01/2026
115C-107.5 2026‑41 S257 7.7(o) 7.796 07/01/2026
115C-111.05 2026‑41 S257 7.57(a) 7.9K 07/01/2026
115C-150.11 2026‑41 S257 7.62(a) 7.9O 07/01/2026
115C-150.12A (f) 2026‑41 S257 7.62(e) 7.9O 07/01/2026
115C-150.12B (a) 2026‑41 S257 7.62(f) 7.9O 07/01/2026
115C-150.12C 1 2026‑46 H1094 9(c) 9 10/01/2026
115C-150.12C (3b) 2 2026‑41 S257 7.36(e) 7.9999996 07/01/2026
115C-150.12C (10), (20) 3 2026‑41 S257 7.4(q) 7.495 07/01/2026
115C-150.12C (15) 4 2026‑41 S257 7.32(b) 7.999995 07/01/2026
115C-150.12C (39) 5 2026‑41 S257 7.33(b) 7.999999 07/07/2026
115C-150.12C (39) 7 2026‑41 S257 7.38(c) 7.99999990 07/07/2026
115C-150.12C (39) 8 2026‑41 S257 7.39(g) 7.99999997 07/01/2026
115C-150.18 2026‑41 S257 7.63(a) 7.9P 07/01/2026
115C-173.20 Art. 10, Part 6 2026‑41 S257 7.28(a) 7.9999 07/01/2026
115C-173.21 2026‑41 S257 7.28(a) 7.9999 07/01/2026
115C-173.24 2026‑41 S257 7.28(a) 7.9999 07/01/2026
115C-174.11 (a) 2026‑41 S257 7.8(e) 7.84 07/01/2026
115C-218.30 (a), (a1) 2026‑41 S257 7.58 7.9L 07/01/2026
115C-218.33 (c) 2026‑41 S257 7.39(h) 7.99999998 07/01/2026
115C-218.42 (e) 2026‑41 S257 7.7(m) 7.794 07/01/2026
115C-218.70 2026‑46 H1094 9(b) 9 10/01/2026
115C-218.75 (l), (n)(3) 2026‑41 S257 7.20(c) 7.992 07/01/2026
115C-218.75 (n) 2026‑41 S257 7.20(b) 7.991 07/01/2026
115C-218.75 (p) 2026‑41 S257 7.33(c) 7.9999990 07/07/2026
115C-218.75 (p) 2026‑41 S257 7.38(d) 7.99999991 07/07/2026
115C-218.75 (p) 2026‑41 S257 7.54(d) 7.9I3 07/07/2026
115C-218.85 (b1) 2026‑41 S257 7.36(c) 7.9999996 07/01/2026
115C-218.90 (a)(6) 2026‑40 S1041 4.26 4.9 10/01/2026
115C-218.105 (a) 2026‑41 S257 7.59(a) 7.9M 07/07/2026
115C-218.105 (a)(3) 2026‑41 S257 7.57(b) 7.9K 07/01/2026
115C-229.5 Art. 15A 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.10 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.15 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.20 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.25 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.30 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.35 1 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.35 (1)h. 2 2026‑41 S257 7.36(d) 7.9999996 07/01/2026
115C-229.35 (6) 3 2026‑41 S257 7.32(c) 7.999996 07/01/2026
115C-229.35 (25) 4 2026‑41 S257 7.33(d) 7.9999991 07/07/2026
115C-229.35 (25) 5 2026‑41 S257 7.38(e) 7.99999992 07/07/2026
115C-229.35 (25) 6 2026‑41 S257 7.39(i) 7.99999999 07/01/2026
115C-229.35 (25) 7 2026‑41 S257 7.54(e) 7.9I4 07/07/2026
115C-229.40 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.45 2026‑40 S1041 5.9(d) 5.9 10/01/2026
115C-229.45 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.45 (7) 2026‑40 S1041 5.9(b) 5.9 10/01/2026
115C-229.45 (7) 2026‑40 S1041 5.9(c) 5.9 10/01/2026
115C-229.50 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.55 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.55 (b)(2) 2026‑41 S257 7.57(c) 7.9K 07/01/2026
115C-229.60 2026‑41 S257 7.31(a) 7.99991 07/01/2026
115C-229.60 (e) 2026‑41 S257 7.20(d) 7.993 07/01/2026
115C-238.35 Art. 16, Part 7A 2026‑41 S257 7.23(a) 7.996 07/01/2027
115C-238.36 2026‑41 S257 7.23(a) 7.996 07/01/2027
115C-238.37 2026‑41 S257 7.23(a) 7.996 07/01/2027
115C-238.50A (1a), (3a) 2026‑41 S257 7.31(f) 7.99996 07/01/2026
115C-238.60 Art. 16, Part 10 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.61 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.62 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.63 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.64 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.65 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.66 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.66 (8) 2026‑46 H1094 9(b) 9 10/01/2026
115C-238.67 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.68 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.68 (7), (8) 2026‑40 S1041 4.27 4.9 10/01/2026
115C-238.69 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-238.90 Art. 16, Part 12 2026‑41 S257 7.15 7.94 07/01/2026
115C-238.90 Art. 16, Part 12 2026‑41 S257 7.22 7.996 07/01/2026
115C-238.95 2026‑41 S257 7.16 7.95 07/01/2026
115C-239.70 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-239.71 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-239.72 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-239.73 2026‑41 S257 7.31(j) 7.999990 07/01/2026
115C-242 (3) 2026‑41 S257 7.4(r) 7.497 07/01/2026
115C-264 (e) 2026‑41 S257 7.20(a) 7.99 07/01/2026
115C-264.6 2026‑41 S257 7.21 7.995 07/01/2026
115C-268.1 (g) 2026‑40 S1041 4.28 4.9 10/01/2026
115C-269.1 Art. 17D title 2026‑41 S257 7.24(a) 7.997 07/01/2026
115C-269.1 Art. 17D, Part 1 2026‑41 S257 7.24(b) 7.998 07/01/2026
115C-269.5 2026‑41 S257 7.24(c) 7.999 07/01/2026
115C-269.15 (a) 2026‑41 S257 7.10(a) 7.91 07/01/2026
115C-269.31 Art. 17D, Part 2 2026‑41 S257 7.24(b) 7.998 07/01/2026
115C-269.32 2026‑41 S257 7.24(i) 7.9996 07/01/2026
115C-269.35 (b) 2026‑41 S257 7.24(h) 7.9995 07/01/2026
115C-269.45 (a)(3) 2026‑41 S257 7.24(e) 7.9992 07/01/2026
115C-269.50 2026‑41 S257 7.7(k) 7.792 07/01/2026
115C-269.55 (a) 2026‑41 S257 7.24(f) 7.9993 07/01/2026
115C-269.65 2026‑41 S257 7.24(g) 7.9994 07/01/2026
115C-269.67 2026‑41 S257 7.24(g) 7.9994 07/01/2026
115C-269.69 2026‑41 S257 7.24(g) 7.9994 07/01/2026
115C-269.75 2026‑41 S257 7.24(b) 7.998 07/01/2026
115C-270.1 2026‑41 S257 7.6(b) 7.61 07/07/2026
115C-270.15 2026‑41 S257 7.10(b) 7.92 07/01/2026
115C-270.20 (b) 2026‑41 S257 7.6(a) 7.6 07/07/2026
115C-270.25 2026‑41 S257 7.10(c) 7.93 07/07/2026
115C-270.30 (b2) 2026‑20 S227 3 3 06/24/2026
115C-271 (d)(2) 2026‑41 S257 7.4(s) 7.498 07/01/2026
115C-284 (e), (e1) 2026‑41 S257 7.6(c) 7.62 07/07/2026
115C-284.1 2026‑41 S257 7.6(d) 7.63 07/07/2026
115C-284.2 2026‑41 S257 7.25 7.9997 07/01/2026
115C-285.1 2026‑41 S257 7A.9(a) 7A.9 07/01/2026
115C-285.5 2026‑41 S257 7A.8 7A.8 07/01/2026
115C-288 (k) 2026‑46 H1094 9(b) 9 10/01/2026
115C-289.2 (d) 2026‑41 S257 7.7(j) 7.791 07/01/2026
115C-296.2 2026‑41 S257 7A.3 7A.3 07/01/2026
115C-296.5 2026‑41 S257 7.43(a) 7.9C 07/01/2026
115C-296.6 2026‑41 S257 7.43(b) 7.9C1 07/01/2026
115C-296.10 (b) 2026‑41 S257 7.24(d) 7.9991 07/01/2026
115C-299.5 catch line, (b) 2026‑41 S257 7.7(h) 7.78 07/01/2026
115C-302.1 (j) 2026‑40 S1041 4.29 4.9 10/01/2026
115C-302.6 2026‑41 S257 7A.6(a) 7A.6 07/01/2026
115C-302.9 2026‑41 S257 7A.4(a) 7A.4 07/01/2026
115C-310.3 2026‑41 S257 7.19(a) 7.98 07/07/2026
115C-310.5 2026‑41 S257 7.19(a) 7.98 07/07/2026
115C-310.9 2026‑41 S257 7.19(a) 7.98 07/07/2026
115C-310.11 2026‑41 S257 7.19(a) 7.98 07/07/2026
115C-310.13 2026‑41 S257 7.19(a) 7.98 07/07/2026
115C-310.15 2026‑41 S257 7.19(a) 7.98 07/07/2026
115C-316.2 2026‑41 S257 7.7(f) 7.76 07/01/2026
115C-316.5 (a) 2026‑41 S257 7.7(g) 7.77 07/01/2026
115C-336.1 2026‑40 S1041 4.30 4.9 10/01/2026
115C-375.3 2026‑41 S257 7.32(a) 7.999994 07/01/2026
115C-375.6 2026‑41 S257 7.38(a) 7.9999998 07/07/2026
115C-375.20 (c) 2026‑41 S257 7.31(g) 7.99997 07/01/2026
115C-377 2026‑41 S257 7.18 7.97 07/01/2026
115C-379 2026‑11 S401 9 9 06/22/2026
115C-379 2026‑41 S257 7.54(a) 7.9I 07/07/2026
115C-384 (c) 2026‑41 S257 7.4(t) 7.499 07/01/2026
115C-390.2 (b) 2026‑20 S227 2.5(b) 2.5 06/24/2026
115C-390.2 (l)(1) 2026‑41 S257 7.4(u) 7.4991 07/01/2026
115C-390.5 (c)(1) 2026‑41 S257 7.4(v) 7.4992 07/01/2026
115C-398 2026‑41 S257 7.4(w) 7.4993 07/01/2026
115C-401.2 (a)(5) 2026‑41 S257 7.31(h) 7.99998 07/01/2026
115C-407.45 2026‑41 S257 7.54(b) 7.9I1 07/07/2026
115C-407.61 (a)(6) 2026‑40 S1041 4.31 4.9 10/01/2026
115C-431 (b1)(1) 2026‑41 S257 7.31(i) 7.99999 07/01/2026
115C-438.1 2026‑41 S257 7.49 7.9D 07/01/2026
115C-450 (d) 2026‑41 S257 7.7(l) 7.793 07/01/2026
115C-472.22 Art. 32F title 1 2026‑41 S257 7.3(a) 7.3 07/01/2026
115C-472.22 2 2026‑41 S257 7.5(a) 7.5 07/07/2026
115C-472.22 (a) 3 2026‑41 S257 7.4(x) 7.4994 07/01/2026
115C-472.30 2026‑41 S257 7.3(b) 7.3 07/01/2026
115C-546.10 2026‑41 S257 4.3(a) 4.3 07/01/2026
115C-546.10 2026‑41 S257 5.5(b) 5.5 07/01/2026
115C-546.10 2026‑50 H1126 3.1(j) 3.1 07/07/2026
115C-550.2 2026‑41 S257 7.33(f) 7.9999993 07/07/2026
115C-558.2 2026‑41 S257 7.33(g) 7.9999994 07/07/2026
115C-562.2 (a) 2026‑41 S257 8A.3(a) 8A.3 07/01/2026
115C-562.2 (b5) 2026‑41 S257 8A.4 8A.4 07/01/2026
115C-562.2A 2026‑41 S257 8A.5(a) 8A.5 07/07/2026
115C-562.3 2026‑41 S257 8A.2(a) 8A.2 07/01/2026
115C-562.5 2026‑41 S257 8A.12(a) 8A.92 07/01/2026
115C-562.5 2026‑42 H56 2.8(a) 2.8 07/01/2026
115C-562.5 (b2) 2026‑41 S257 8A.7(b) 8A.7 07/01/2026
115C-566 2026‑46 H1094 9(b) 9 10/01/2026
115C-591 2026‑41 S257 8A.16(a) 8A.95 07/07/2026
115C-592 (a) 2026‑41 S257 8A.3(b) 8A.3 07/01/2026
115C-592 (c1) 2026‑41 S257 8A.7(a) 8A.7 07/01/2026
115C-594 (b) 2026‑41 S257 8A.2(b) 8A.2 07/01/2026
115C-595 2026‑41 S257 8A.16(b) 8A.95 07/07/2026
115C-600 (a) 2026‑41 S257 8A.15 8A.94 07/01/2026
115C-600 (b) 2026‑41 S257 8A.11(a) 8A.91 07/01/2026
115D-2.2 (b) 2026‑41 S257 5.10(o) 5.91.992 07/01/2027
115D-3 (a3) 2026‑40 S1041 4.32 4.9 10/01/2026
115D-5 2026‑21 S558 1(b) 1 06/24/2026
115D-5 (aa) 2026‑41 S257 5.9(d2) 5.9 07/07/2026
115D-5 (bb) 2026‑41 S257 5.9(d2) 5.9 07/07/2026
115D-6.3 2026‑41 S257 5.9(d2) 5.9 07/07/2026
115D-9 2026‑41 S257 42.7(b) 42.7 07/01/2026
115D-9 (g) 2026‑41 S257 22.5(e) 22.5B 07/01/2026
115D-9.45 2026‑41 S257 6.10(a) 6.8 07/07/2026
115D-10.21 (a) 2026‑41 S257 6.3(a) 6.3 07/01/2026
115D-10.55 2026‑41 S257 6.2(c) 6.22 07/01/2026
115D-10.70 2026‑46 H1094 9(b) 9 10/01/2026
115D-10.85 2026‑41 S257 6.7(a) 6.7 12/01/2026
115D-31 (e) 2026‑41 S257 6.2(d) 6.22 07/01/2026
115D-31.4 2026‑41 S257 6.2(f) 6.24 07/01/2026
115D-58.17 (a) 2026‑41 S257 6.1 6.1 07/01/2026
115D-78 2026‑41 S257 8.14(c) 8.95 07/07/2026
115D-264 (d) 2026‑41 S257 7.20(e) 7.994 07/01/2026
116-11 (3d) 1 2026‑41 S257 8.19(a) 8.99 07/07/2026
116-11 (7b) 2 2026‑41 S257 8.17(a) 8.96 12/01/2026
116-11 (9c) 3 2026‑21 S558 1(a) 1 06/24/2026
116-11 (15) 4 2026‑41 S257 7.38(f) 7.99999993 07/07/2026
116-14 (b) 2026‑40 S1041 4.33 4.9 10/01/2026
116-15 2026‑41 S257 8.18 8.98 07/01/2026
116-17.4 2026‑41 S257 8.11 8.91 07/01/2026
116-30.4 2026‑40 S1041 4.34 4.9 10/01/2026
116-31.11 2026‑9 H1123 4.1(a) 4.1 06/19/2026
116-31.11 (f) 2026‑41 S257 22.5(f) 22.5C 07/01/2026
116-33.2 2026‑40 S1041 4.35 4.9 10/01/2026
116-36.10 2026‑41 S257 8.20(a) 8.990 06/30/2026
116-37.3 (b) 2026‑40 S1041 4.36 4.9 10/01/2026
116-40.14 2026‑19 S153 6 6 06/24/2026
116-41.30 Art. 1, Part 4B 2026‑41 S257 8.3 8.3 07/01/2026
116-41.31 2026‑41 S257 8.3 8.3 07/01/2026
116-43.17 2026‑41 S257 8.14(b) 8.94 07/07/2026
116-143.2A 2026‑41 S257 8.17(b) 8.96 12/01/2026
116-143.11 (a) 2026‑41 S257 8.12(a) 8.92 07/01/2026
116-143.11 (d) 2026‑41 S257 8.25(b) 8.992 07/01/2026
116-143.13 2026‑41 S257 8.25(a) 8.991 07/01/2026
116-203 (b) 2026‑41 S257 5.10(h) 5.91.95 07/07/2026
116-209 2026‑50 H1126 3.1(k) 3.1 07/07/2026
116-209.18 2026‑41 S257 8.1(b) 8.1 07/01/2026
116-209.19B 2026‑41 S257 8.17(c) 8.97 12/01/2026
116-209.25 2026‑50 H1126 3.1(l) 3.1 07/07/2026
116-209.32 2026‑41 S257 8A.14(a) 8A.93 07/01/2026
116-209.45 (c1) 2026‑41 S257 8A.17(a) 8A.95 07/01/2026
116-209.62 2026‑41 S257 8.5(a) 8.5 07/01/2026
116-209.89 2026‑9 H1123 3.1(a) 3.1 06/19/2026
116-209.90 2026‑9 H1123 3.1(a) 3.1 06/19/2026
116-209.91 2026‑9 H1123 3.1(a) 3.1 06/19/2026
116-209.100 (1)c. 2026‑41 S257 8A.9(c) 8A.90 07/07/2026
116-209.120 Art. 23, Part 9 2026‑41 S257 8A.8(a) 8A.8 07/07/2026
116-209.122 2026‑41 S257 8A.8(a) 8A.8 07/07/2026
116-209.124 2026‑41 S257 8A.8(a) 8A.8 07/07/2026
116-209.126 2026‑41 S257 8A.8(a) 8A.8 07/07/2026
116-209.128 2026‑41 S257 8A.8(a) 8A.8 07/07/2026
116-235 (b)(1) 2026‑9 H1123 2.1(a) 2.1 06/19/2026
116-235 (b)(1) 2026‑42 H56 2.6 2.6 07/01/2026
116-239.8 (b) 1 2026‑41 S257 7.33(e) 7.9999992 07/07/2026
116-239.8 (b) 2 2026‑41 S257 7.39(j) 7.39 07/01/2026
116-239.8 (b) 3 2026‑41 S257 8.4 8.4 07/01/2026
116-239.8 (b)(2) 4 2026‑41 S257 7.36(f) 7.9999996 07/01/2026
116-239.8 (b)(9) 5 2026‑41 S257 7.32(d) 7.999997 07/01/2026
116-239.8 (b)(21c) 6 2026‑41 S257 7.39(j) 7.9A 07/01/2026
116-239.8 (b)(26) 7 2026‑41 S257 7.54(f) 7.9I5 07/07/2026
116-239.10 (8), (9) 2026‑40 S1041 4.37 4.9 10/01/2026
116-239.11 (a)(2) 2026‑41 S257 7.57(d) 7.9K 07/01/2026
116-255 2026‑41 S257 8.9(a) 8.9 07/07/2026
116-257 2026‑41 S257 8.10(a) 8.90 07/07/2026
116-258.1 Art. 31B 2026‑41 S257 8.2(a) 8.2 07/01/2026
116-258.2 2026‑41 S257 8.2(a) 8.2 07/01/2026
116-258.3 2026‑41 S257 8.2(a) 8.2 07/01/2026
116-280 2026‑41 S257 8A.9(a) 8A.9 07/07/2026
116-284 2026‑41 S257 8A.9(b) 8A.9 07/07/2026
116-290 2026‑41 S257 8.8(a) 8.8 07/07/2026
116-292 2026‑41 S257 8.8(a) 8.8 07/07/2026
116-294 2026‑41 S257 8.8(a) 8.8 07/07/2026
116-300 (9) 2026‑21 S558 4 4 06/24/2026
116-350 (3a) 2026‑41 S257 5.7(a) 5.7 07/01/2026
116-350.30 (a) 2026‑40 S1041 4.38 4.9 10/01/2026
116-350.70 2026‑41 S257 5.7(b) 5.7 07/01/2026
116-360.5 (2) 2026‑40 S1041 4.39 4.9 10/01/2026
116-360.15 (b) 2026‑40 S1041 4.40 4.9 10/01/2026
116-415 Art. 39 2026‑21 S558 2 2 06/24/2026
116-416 2026‑21 S558 2 2 06/24/2026
116-417 2026‑21 S558 2 2 06/24/2026
116B-7 2026‑41 S257 8.1(a) 8.1 07/01/2026
116B-8 2026‑50 H1126 5.1 5.1 07/07/2026
116B-52 (11a) 2026‑50 H1126 5.2 5.2 07/07/2026
116B-59 (a1) 2026‑50 H1126 5.3(a) 5.3 12/01/2026
116B-60 2026‑50 H1126 5.4(a) 5.4 12/01/2026
116B-67 (b) 2026‑50 H1126 5.4(b) 5.4 12/01/2026
116B-77 (b) 2026‑50 H1126 5.4(c) 5.4 07/07/2026
116B-78 (b) 2026‑50 H1126 4.6 4.6 07/07/2026
116D-4 2026‑41 S257 22.5(x) 22.5U 07/01/2026
119-57 2026‑11 S401 12 12 06/22/2026
119-63.4 2026‑11 S401 18(a) 18 01/01/2027
119-63.6 (a) 2026‑11 S401 18(b) 18 06/22/2026
120-4.10 (c) 2026‑50 H1126 1.8(d) 1.8 07/07/2026
120-4.11 2026‑50 H1126 4.4(a) 4.4 07/07/2026
120-4.11 (2) 2026‑50 H1126 4.1(n) 4.1 01/01/2027
120-4.12 (c)(2) 2026‑50 H1126 4.1(n) 4.1 01/01/2027
120-4.13 (a) 2026‑50 H1126 4.1(n) 4.1 01/01/2027
120-4.15 (a), (b) 2026‑50 H1126 4.1(n) 4.1 01/01/2027
120-4.18 2026‑50 H1126 3.1(m) 3.1 07/07/2026
120-4.21 (b2)(3) 2026‑50 H1126 4.9(e) 4.9 07/07/2026
120-4.21 (c) 2026‑50 H1126 1.4(d) 1.4 07/01/2026
120-4.21 (d) 2026‑50 H1126 1.4(c) 1.4 07/01/2026
120-4.22A (ff) 2026‑41 S257 41.26(c) 41.9G 07/01/2026
120-4.23 2026‑50 H1126 4.1(p) 4.1 01/01/2027
120-4.23 (b) 2026‑50 H1126 4.1(o) 4.1 01/01/2027
120-4.25 2026‑50 H1126 4.9(d) 4.9 07/07/2026
120-4.29 2026‑50 H1126 1.2(c) 1.2 07/07/2026
120-12.1 2026‑41 S257 20.4 20.4 07/01/2026
120-32 2026‑40 S1041 2(a) 2 10/01/2026
120-32 (11) 2026‑41 S257 29.1(a) 29.1 07/01/2026
120-32.5 2026‑40 S1041 2(b) 2 10/01/2026
120-36.30 Art. 7E, Part 1 2026‑40 S1041 2(c) 2 10/01/2026
120-36.31 2026‑40 S1041 2(c) 2 10/01/2026
120-36.32 2026‑40 S1041 2(c) 2 10/01/2026
120-36.40 Art. 7E, Part 2 2026‑40 S1041 2(c) 2 10/01/2026
120-36.41 2026‑40 S1041 2(c) 2 10/01/2026
120-36.42 2026‑40 S1041 2(c) 2 10/01/2026
120-36.43 2026‑40 S1041 2(c) 2 10/01/2026
120-36.44 2026‑40 S1041 2(c) 2 10/01/2026
120-36.45 2026‑40 S1041 2(c) 2 10/01/2026
120-37 (b) 2026‑41 S257 41.12 41.9B 07/01/2026
120-37 (c) 2026‑41 S257 41.11 41.9A 07/01/2026
120-76.1 (1), (4) 2026‑41 S257 5.6(a) 5.6 07/01/2026
120-86.1 2026‑40 S1041 4.41 4.9 10/01/2026
120-114 2026‑50 H1126 6.6 6.6 07/07/2026
120-129 2026‑41 S257 8.9(b) 8.9 07/07/2026
120-167 2026‑50 H1126 4.8(a) 4.8 07/07/2026
120-170 2026‑50 H1126 4.8(b) 4.8 07/07/2026
120-171 2026‑50 H1126 4.8(c) 4.8 07/07/2026
120-172 2026‑50 H1126 4.8(d) 4.8 07/07/2026
120-173 2026‑50 H1126 4.8(e) 4.8 07/07/2026
120-174 2026‑50 H1126 4.8(f) 4.8 07/07/2026
120-208.4 (b) 2026‑41 S257 9B.5(a) 9B.5 07/01/2026
121-9 (h) 2026‑41 S257 42.8(b) 42.8A 07/01/2026
122C-3 2026‑41 S257 9G.3(b) 9G.3 07/01/2026
122C-3 (14)j. 2026‑44 S355 2.3(a) 2.3 07/07/2026
122C-54 (b) 2026‑38 H1104 13(j) 13 12/01/2026
122C-54 (d) 2026‑38 H1104 11(j) 11 12/01/2026
122C-112.1 (b)(6) 2026‑40 S1041 4.42 4.9 10/01/2026
122C-121 (a1) 2026‑40 S1041 4.43 4.9 10/01/2026
122C-142.1 2026‑44 S355 2.3(b) 2.3 07/07/2026
122C-154 2026‑40 S1041 4.44 4.9 10/01/2026
122C-156 (a) 2026‑40 S1041 4.45 4.9 10/01/2026
122C-191 (b) 2026‑40 S1041 4.46 4.9 10/01/2026
122C-256 2026‑38 H1104 13(k) 13 12/01/2026
122C-261 (d)(3) 2026‑38 H1104 11(a) 11 12/01/2026
122C-263 2026‑38 H1104 11(b) 11 12/01/2026
122C-265 2026‑38 H1104 11(c) 11 12/01/2026
122C-266 2026‑38 H1104 14(b) 14 07/06/2026
122C-267 2026‑38 H1104 11(d) 11 12/01/2026
122C-270 (f) 2026‑40 S1041 4.47 4.9 10/01/2026
122C-271 2026‑38 H1104 11(e) 11 12/01/2026
122C-273 2026‑38 H1104 11(f) 11 12/01/2026
122C-273 (a) 2026‑38 H1104 13(m) 13 12/01/2026
122C-274 2026‑38 H1104 11(g) 11 12/01/2026
122C-275 2026‑38 H1104 11(h) 11 12/01/2026
122C-276 2026‑38 H1104 11(i) 11 12/01/2026
122C-314 2026‑41 S257 9G.3(c) 9G.3 07/01/2026
122E-3 (c) 2026‑50 H1126 3.1(n) 3.1 07/07/2026
124-3 (a) 2026‑41 S257 43.18(a) 43.18 07/01/2026
124-17 2026‑41 S257 43.18(b) 43.18B 07/01/2026
126-1 Chapter 2026‑40 S1041 4.90 4.91 10/01/2026
126-1.1 2026‑40 S1041 4.90 4.91 10/01/2026
126-2 2026‑40 S1041 4.90 4.91 10/01/2026
126-3 2026‑40 S1041 4.90 4.91 10/01/2026
126-3.1 2026‑40 S1041 4.90 4.91 10/01/2026
126-4 2026‑40 S1041 4.90 4.91 10/01/2026
126-5 2026‑40 S1041 4.90 4.91 10/01/2026
126-5 2026‑41 S257 11.13(a) 11.91 07/01/2026
126-5 2026‑42 H56 4.8(a) 4.8A 07/01/2026
126-5 (c1) 2026‑41 S257 13.3(b) 13.9 01/01/2027
126-5 (c1)(8) 2026‑42 H56 8.3(a) 8.3 07/01/2026
126-5 (c1)(8a) 2026‑41 S257 7.31(k) 7.999991 07/01/2026
126-5 (c13) 2026‑50 H1126 1.7(c) 1.7 07/07/2026
126-5 (c14) 2026‑41 S257 41.20 41.9C 07/01/2026
126-5 (c22) 2026‑41 S257 5.9(a2) 5.9 See Bill
126-6.2 2026‑40 S1041 4.90 4.91 10/01/2026
126-6.3 2026‑40 S1041 4.90 4.91 10/01/2026
126-6.3 (a) 2026‑41 S257 14.2 14.2 07/01/2026
126-6.4 2026‑40 S1041 4.90 4.91 10/01/2026
126-7.1 2026‑40 S1041 4.90 4.91 10/01/2026
126-7.1 (i) 2026‑40 S1041 5.7(b) 5.7 10/01/2026
126-7.3 2026‑40 S1041 4.90 4.91 10/01/2026
126-8 2026‑40 S1041 4.90 4.91 10/01/2026
126-8.1 2026‑40 S1041 4.90 4.91 10/01/2026
126-8.2 2026‑40 S1041 4.90 4.91 10/01/2026
126-8.3 2026‑40 S1041 4.90 4.91 10/01/2026
126-8.4 2026‑40 S1041 4.90 4.91 10/01/2026
126-8.5 2026‑40 S1041 4.90 4.91 10/01/2026
126-8.6 2026‑40 S1041 4.90 4.91 10/01/2026
126-8.7 2026‑40 S1041 4.90 4.91 10/01/2026
126-9 2026‑40 S1041 4.90 4.91 10/01/2026
126-10 2026‑40 S1041 4.90 4.91 10/01/2026
126-11 2026‑40 S1041 4.90 4.91 10/01/2026
126-11.1 2026‑40 S1041 4.90 4.91 10/01/2026
126-11.2 2026‑40 S1041 4.90 4.91 10/01/2026
126-12 2026‑40 S1041 4.90 4.91 10/01/2026
126-13 2026‑40 S1041 4.90 4.91 10/01/2026
126-14 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.1 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.2 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.3 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.3A 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.3B 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.5 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.6 2026‑40 S1041 4.90 4.91 10/01/2026
126-14.7 2026‑40 S1041 5.8(a) 5.8 10/01/2026
126-14.7 2026‑41 S257 5.9(a2) 5.9 See Bill
126-15 2026‑40 S1041 4.90 4.91 10/01/2026
126-16 2026‑40 S1041 4.90 4.91 10/01/2026
126-16.1 2026‑40 S1041 4.90 4.91 10/01/2026
126-17 2026‑40 S1041 4.90 4.91 10/01/2026
126-18 2026‑40 S1041 4.90 4.91 10/01/2026
126-19 2026‑40 S1041 4.90 4.91 10/01/2026
126-22 2026‑40 S1041 4.90 4.91 10/01/2026
126-22 (c) 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027
126-23 2026‑40 S1041 4.90 4.91 10/01/2026
126-24 2026‑40 S1041 4.90 4.91 10/01/2026
126-25 2026‑40 S1041 4.90 4.91 10/01/2026
126-26 2026‑40 S1041 4.90 4.91 10/01/2026
126-27 2026‑40 S1041 4.90 4.91 10/01/2026
126-28 2026‑40 S1041 4.90 4.91 10/01/2026
126-29 2026‑40 S1041 4.90 4.91 10/01/2026
126-30 2026‑40 S1041 4.90 4.91 10/01/2026
126-34.01 2026‑40 S1041 4.90 4.91 10/01/2026
126-34.02 2026‑40 S1041 4.90 4.91 10/01/2026
126-34.2 2026‑40 S1041 4.90 4.91 10/01/2026
126-34.3 2026‑40 S1041 4.90 4.91 10/01/2026
126-35 2026‑40 S1041 4.90 4.91 10/01/2026
126-51 2026‑40 S1041 4.90 4.91 10/01/2026
126-52 2026‑40 S1041 4.90 4.91 10/01/2026
126-53 2026‑40 S1041 4.90 4.91 10/01/2026
126-54 2026‑40 S1041 4.90 4.91 10/01/2026
126-55 2026‑40 S1041 4.90 4.91 10/01/2026
126-56 2026‑40 S1041 4.90 4.91 10/01/2026
126-57 2026‑40 S1041 4.90 4.91 10/01/2026
126-58 2026‑40 S1041 4.90 4.91 10/01/2026
126-74 2026‑40 S1041 4.90 4.91 10/01/2026
126-75 2026‑40 S1041 4.90 4.91 10/01/2026
126-76 2026‑40 S1041 4.90 4.91 10/01/2026
126-77 2026‑40 S1041 4.90 4.91 10/01/2026
126-78 2026‑40 S1041 4.90 4.91 10/01/2026
126-80 2026‑40 S1041 4.90 4.91 10/01/2026
126-80.5 2026‑40 S1041 4.90 4.91 10/01/2026
126-81 2026‑40 S1041 4.90 4.91 10/01/2026
126-82 2026‑40 S1041 4.90 4.91 10/01/2026
126-83 2026‑40 S1041 4.90 4.91 10/01/2026
126-84 2026‑40 S1041 4.90 4.91 10/01/2026
126-85 2026‑40 S1041 4.90 4.91 10/01/2026
126-86 2026‑40 S1041 4.90 4.91 10/01/2026
126-87 2026‑40 S1041 4.90 4.91 10/01/2026
126-88 2026‑40 S1041 4.90 4.91 10/01/2026
126-90 2026‑40 S1041 4.90 4.91 10/01/2026
126-95 2026‑40 S1041 4.90 4.91 10/01/2026
126A-1 Chapter, Art. 1, Part 1 2026‑40 S1041 1 1 10/01/2026
126A-2 2026‑40 S1041 1 1 10/01/2026
126A-10 Art. 1, Part 2 2026‑40 S1041 1 1 10/01/2026
126A-10.1 2026‑40 S1041 1 1 10/01/2026
126A-15 Art. 1, Part 3 1 2026‑40 S1041 1 1 10/01/2026
126A-15 (5)d. 2 2026‑42 H56 4.8(b) 4.8E 07/01/2026
126A-15 (5)d. 3 2026‑40 S1041 5.9(g) 5.9 10/01/2026
126A-15 (6)c. 4 2026‑42 H56 6.1(a) 6.1 10/01/2026
126A-15 (8)h. 4 2026‑40 S1041 5.9(e) 5.9 10/01/2026
126A-15 (8)g. 6 2026‑42 H56 8.3(b) 8.3A 10/01/2026
126A-15 (8)hh. 7 2026‑40 S1041 5.9(j) 5.9 10/01/2026
126A-15 (8)gg. 8 2026‑42 H56 4.8(b) 4.8D 07/01/2026
126A-15 (8)gg. 9 2026‑40 S1041 5.9(f) 5.9 10/01/2026
126A-15.1 2026‑40 S1041 1 1 10/01/2026
126A-15.2 2026‑40 S1041 1 1 10/01/2026
126A-15.2 (p), (q) 2026‑40 S1041 5.8(b) 5.8 10/01/2026
126A-15.3 2026‑40 S1041 1 1 10/01/2026
126A-15.4 2026‑40 S1041 1 1 10/01/2026
126A-15.4 (d)(7) 2026‑40 S1041 5.7(e) 5.7 10/01/2026
126A-15.5 2026‑40 S1041 1 1 10/01/2026
126A-15.6 2026‑40 S1041 1 1 10/01/2026
126A-20 Art. 2 2026‑40 S1041 1 1 10/01/2026
126A-21 2026‑40 S1041 1 1 10/01/2026
126A-22 2026‑40 S1041 1 1 10/01/2026
126A-23 2026‑40 S1041 1 1 10/01/2026
126A-24 2026‑40 S1041 1 1 10/01/2026
126A-30 Art. 3 2026‑40 S1041 1 1 10/01/2026
126A-31 2026‑40 S1041 1 1 10/01/2026
126A-32 2026‑40 S1041 1 1 10/01/2026
126A-40 Art. 4 2026‑40 S1041 1 1 10/01/2026
126A-41 2026‑40 S1041 1 1 10/01/2026
126A-41 (b) 2026‑40 S1041 5.9(l) 5.9 10/01/2026
126A-42 2026‑40 S1041 1 1 10/01/2026
126A-50 Art. 5, Part 1 2026‑40 S1041 1 1 10/01/2026
126A-51 2026‑40 S1041 1 1 10/01/2026
126A-52 2026‑40 S1041 1 1 10/01/2026
126A-53 2026‑40 S1041 1 1 10/01/2026
126A-54 2026‑40 S1041 1 1 10/01/2026
126A-55 2026‑40 S1041 1 1 10/01/2026
126A-56 2026‑40 S1041 1 1 10/01/2026
126A-56.1 2026‑40 S1041 1 1 10/01/2026
126A-56.2 2026‑40 S1041 1 1 10/01/2026
126A-56.3 2026‑40 S1041 1 1 10/01/2026
126A-57 2026‑40 S1041 1 1 10/01/2026
126A-57.1 2026‑40 S1041 1 1 10/01/2026
126A-57.2 2026‑40 S1041 1 1 10/01/2026
126A-57.3 2026‑40 S1041 1 1 10/01/2026
126A-58 Art. 5, Part 2 2026‑40 S1041 1 1 10/01/2026
126A-60 Art. 6, Part 1 2026‑40 S1041 1 1 10/01/2026
126A-61 2026‑40 S1041 1 1 10/01/2026
126A-61 (a) 2026‑40 S1041 5.7(c) 5.7 10/01/2026
126A-62 2026‑40 S1041 1 1 10/01/2026
126A-63 Art. 6, Part 2 2026‑40 S1041 1 1 10/01/2026
126A-70 Art. 7, Part 1 2026‑40 S1041 1 1 10/01/2026
126A-71 2026‑40 S1041 1 1 10/01/2026
126A-72 Art. 7, Part 2 2026‑40 S1041 1 1 10/01/2026
126A-73 2026‑40 S1041 1 1 10/01/2026
126A-74 2026‑40 S1041 1 1 10/01/2026
126A-74.1 2026‑40 S1041 1 1 10/01/2026
126A-75 Art. 7, Part 3 2026‑40 S1041 1 1 10/01/2026
126A-76 Art. 7, Part 4 2026‑40 S1041 1 1 10/01/2026
126A-80 Art. 8 2026‑40 S1041 1 1 10/01/2026
126A-81 2026‑40 S1041 1 1 10/01/2026
126A-82 2026‑40 S1041 1 1 10/01/2026
126A-83 2026‑40 S1041 1 1 10/01/2026
126A-84 2026‑40 S1041 1 1 10/01/2026
126A-85 2026‑40 S1041 1 1 10/01/2026
126A-86 2026‑40 S1041 1 1 10/01/2026
126A-90 Art. 9 2026‑40 S1041 1 1 10/01/2026
126A-91 2026‑40 S1041 1 1 10/01/2026
126A-92 2026‑40 S1041 1 1 10/01/2026
126A-93 2026‑40 S1041 1 1 10/01/2026
126A-94 2026‑40 S1041 1 1 10/01/2026
126A-100 Art. 10 2026‑40 S1041 1 1 10/01/2026
126A-101 2026‑40 S1041 1 1 10/01/2026
126A-102 2026‑40 S1041 1 1 10/01/2026
126A-103 2026‑40 S1041 1 1 10/01/2026
126A-104 2026‑40 S1041 1 1 10/01/2026
126A-104.5 2026‑40 S1041 5.8(a) 5.8 10/01/2026
126A-105 2026‑40 S1041 1 1 10/01/2026
126A-110 Art. 11 2026‑40 S1041 1 1 10/01/2026
126A-111 2026‑40 S1041 1 1 10/01/2026
126A-111 (e) 2026‑40 S1041 5.9(k) 5.9 10/01/2026
126A-112 2026‑40 S1041 1 1 10/01/2026
126A-120 Art. 12 2026‑40 S1041 1 1 10/01/2026
126A-121 2026‑40 S1041 1 1 10/01/2026
126A-122 2026‑40 S1041 1 1 10/01/2026
126A-123 2026‑40 S1041 1 1 10/01/2026
126A-131 Art. 13 2026‑40 S1041 1 1 10/01/2026
126A-132 2026‑40 S1041 1 1 10/01/2026
126A-133 2026‑40 S1041 1 1 10/01/2026
126A-134 2026‑40 S1041 1 1 10/01/2026
126A-140 Art. 14 2026‑40 S1041 1 1 10/01/2026
126A-141 2026‑40 S1041 1 1 10/01/2026
126A-142 2026‑40 S1041 1 1 10/01/2026
126A-143 2026‑40 S1041 1 1 10/01/2026
126A-144 2026‑40 S1041 1 1 10/01/2026
126A-145 2026‑40 S1041 1 1 10/01/2026
126A-150 Art. 15 2026‑40 S1041 1 1 10/01/2026
126A-151 2026‑40 S1041 1 1 10/01/2026
126A-152 2026‑40 S1041 1 1 10/01/2026
126A-153 2026‑40 S1041 1 1 10/01/2026
126A-160 Art. 16 2026‑40 S1041 1 1 10/01/2026
126A-161 2026‑40 S1041 1 1 10/01/2026
126A-161 2026‑40 S1041 5.9(a) 5.9 10/01/2026
126A-162 2026‑40 S1041 1 1 10/01/2026
126A-162.1 2026‑40 S1041 1 1 10/01/2026
126A-163 2026‑40 S1041 1 1 10/01/2026
126A-164 2026‑40 S1041 1 1 10/01/2026
126A-165 2026‑40 S1041 1 1 10/01/2026
126A-166 2026‑40 S1041 1 1 10/01/2026
127A-19 2026‑41 S257 19.8(a) 19.8 07/07/2026
127A-19 (a), (a1) 2026‑53 H206 8(a) 8 07/07/2026
127A-40 2026‑41 S257 41.28(a) 41.9J 01/01/2027
127A-40.1 2026‑50 H1126 3.1(o) 3.1 07/07/2026
128-15 (d) 2026‑40 S1041 4.48 4.9 10/01/2026
128-21 (7a) 2026‑50 H1126 3.3(b) 3.3 07/01/2025
128-24 (6) 2026‑40 S1041 4.49 4.9 10/01/2026
128-26 (a2) 2026‑50 H1126 1.1(c) 1.1 01/01/2027
128-26 (e) 2026‑50 H1126 4.1(k) 4.1 01/01/2027
128-27 (a3) 2026‑50 H1126 1.3(b) 1.3 07/07/2026
128-27 (c) 2026‑50 H1126 4.1(i) 4.1 01/01/2027
128-27 (f) 2026‑50 H1126 4.9(c) 4.9 07/07/2026
128-27 (g) 2026‑50 H1126 4.5(a) 4.5 07/07/2026
128-27 (m)(2) 2026‑50 H1126 1.10(b) 1.10 07/07/2026
128-28 2026‑50 H1126 1.7(b) 1.7 07/07/2026
128-28 (c) 2026‑41 S257 5.10(c1) 5.91.4 07/01/2027
128-28 (d) 2026‑50 H1126 1.9(b) 1.9 07/07/2026
128-28 (d), (e), (f) 2026‑41 S257 5.10(c2) 5.91.5 07/01/2027
128-28 (h1)(1) 2026‑42 H56 6.1(b) 6.1C 10/01/2026
128-28 (k) 2026‑50 H1126 1.8(c) 1.8 07/07/2026
128-28.1 2026‑41 S257 5.10(c) 5.91.3 07/01/2027
128-29 (g) 2026‑50 H1126 1.11(b) 1.11 07/01/2026
128-31 (b) 2026‑50 H1126 1.2(b) 1.2 07/07/2026
128-32.1 (a) 2026‑50 H1126 4.5(c) 4.5 07/07/2026
128-33.1 (a) 2026‑40 S1041 4.50 4.9 10/01/2026
128-38.40 (a) 2026‑50 H1126 4.9(g) 4.9 07/07/2026
130A-4 (d) 2026‑32 H376 11 11 07/02/2026
130A-33.65 2026‑41 S257 9H.8(a) 9H.8 07/01/2026
130A-33.66 2026‑41 S257 9H.8(a) 9H.8 07/01/2026
130A-39 (b) 2026‑32 H376 8(c) 8 07/02/2026
130A-41 (b)(12) 2026‑40 S1041 4.51 4.9 10/01/2026
130A-45.12 2026‑40 S1041 4.52 4.9 10/01/2026
130A-131.7 (7) 2026‑41 S257 9H.9(a) 9H.9 01/01/2027
130A-131.9C (i) 2026‑41 S257 9H.9(b) 9H.9 01/01/2027
130A-290 (a)(9) 2026‑41 S257 12.17 12.990 07/01/2026
130A-309.05 2026‑41 S257 12.18(a) 12.991 01/01/2027
130A-309.06 (c)(8) 2026‑41 S257 12.15(e) 12.97 07/01/2026
130A-309.09C (g) 2026‑41 S257 12.15(d) 12.96 07/01/2026
130A-309.63 (b)(2) 2026‑41 S257 12.15(c) 12.95 07/01/2026
130A-309.63 (b)(4) 2026‑41 S257 12.15(b) 12.94 07/01/2026
130A-334 2026‑32 H376 9(a) 9 07/02/2026
130A-335 2026‑32 H376 7(a) 7 07/02/2026
130A-335 (f) 2026‑32 H376 9(b) 9 07/02/2026
130A-336 (b) 2026‑32 H376 7(b) 7 07/02/2026
130A-336.1 (e)(1) 2026‑32 H376 9(c) 9 07/02/2026
130A-337 2026‑32 H376 7(c) 7 07/02/2026
130A-343 (g) 2026‑32 H376 10(a) 10 07/02/2026
130A-387 2026‑41 S257 9H.4(a) 9H.4 07/01/2026
130A-412.16 (h) 2026‑48 S857 63 63 10/01/2026
130A-420 (a) 2026‑48 S857 64 64 10/01/2026
130A-485 (f)(3) 2026‑41 S257 5A.20 5A.20 07/01/2026
130A-511 (b)(1) 2026‑34 H83 3(c) 3 07/02/2026
131A-32 2026‑50 H1126 3.1(p) 3.1 07/07/2026
131A-32 2026‑41 S257 25.1(d) 25.1 07/01/2026
131D-2.11 (d) 2026‑41 S257 9F.3(a) 9F.3 10/01/2026
131D-4.2 2026‑41 S257 9F.2(a) 9F.2 07/01/2026
131E-78.4 2026‑41 S257 9F.1(a) 9F.1 07/07/2026
131E-147.2 2026‑41 S257 9F.1(b) 9F.10 07/07/2026
131E-176 2026‑41 S257 9F.4(a) 9F.4 10/01/2026
131F-9 (b)(4) 2026‑52 H517 7 7 07/07/2026
132-1.3B 2026‑41 S257 8.14(a) 8.93 07/07/2026
132-1.4 (a) 2026‑41 S257 16.10(f) 16.95 07/01/2026
132-1.4 (g) 2026‑41 S257 16.20(t) 16.999S 07/01/2027
132-1.4A (b) 2026‑40 S1041 4.53 4.9 10/01/2026
133-1.1 2026‑9 H1123 5.1(b) 5.1 06/19/2026
135-1 (7a) 1 2026‑50 H1126 3.3(a) 3.3 07/01/2025
135-1 (17a) 2 2026‑44 S355 3.1(a) 3.1 07/07/2026
135-3 (a)(7)a. 2026‑50 H1126 4.1(d) 4.1 01/01/2027
135-3 (a)(7)b. 2026‑50 H1126 4.1(e) 4.1 01/01/2027
135-3 (a)(8)a. 2026‑50 H1126 4.1(f) 4.1 01/01/2027
135-3 (a)(8)b. 2026‑50 H1126 4.1(g) 4.1 01/01/2027
135-3 (a)(8)c. 2026‑50 H1126 1.4(a) 1.4 07/01/2026
135-3 (a)(8)d. 2026‑50 H1126 1.4(b) 1.4 07/01/2026
135-3 (c) 2026‑40 S1041 4.54 4.9 10/01/2026
135-3 (d)(2) 2026‑50 H1126 4.3 4.3 07/07/2026
135-4 (e) 2026‑50 H1126 4.1(j) 4.1 01/01/2027
135-4 (g) 2026‑50 H1126 1.1(a) 1.1 01/01/2027
135-5 1 2026‑50 H1126 4.1(c) 4.1 01/01/2027
135-5 (a3) 2 2026‑50 H1126 1.3(a) 1.3 07/07/2026
135-5 (e) 3 2026‑50 H1126 4.1(o) 4.1 01/01/2027
135-5 (e) 4 2026‑50 H1126 4.1(q) 4.1 01/01/2027
135-5 (f) 5 2026‑50 H1126 4.9(b) 4.9 07/07/2026
135-5 (g) 6 2026‑50 H1126 4.5(a) 4.5 07/07/2026
135-5 (m)(2) 7 2026‑50 H1126 1.10(a) 1.10 07/07/2026
135-5 (m1) 8 2026‑50 H1126 4.1(a) 4.1 01/01/2027
135-5 (m2) 9 2026‑50 H1126 4.1(b) 4.1 01/01/2027
135-5 (aaaa) 9.4 2026‑41 S257 41.26(a) 41.9E 07/01/2026
135-5.1 (a)(3) 2026‑40 S1041 4.55 4.9 10/01/2026
135-6 2026‑50 H1126 1.7(a) 1.7 07/07/2026
135-6 (b) 2026‑41 S257 5.10(d1) 5.91.7 07/01/2027
135-6 (c) 2026‑50 H1126 1.9(a) 1.9 07/07/2026
135-6 (c), (d), (e) 2026‑41 S257 5.10(d2) 5.91.75 07/01/2027
135-6 (g1)(1) 2026‑42 H56 6.1(b) 6.1B 10/01/2026
135-6 (j) 2026‑50 H1126 1.8(b) 1.8 07/07/2026
135-6 (k) 2026‑50 H1126 4.1(l) 4.1 01/01/2027
135-6 (u), (j) 2026‑50 H1126 1.8(a) 1.8 07/07/2026
135-6.1 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027
135-6.1 (a) 2026‑40 S1041 4.56 4.9 10/01/2026
135-6.2 2026‑41 S257 5.10(d) 5.91.6 07/01/2027
135-7 (h) 2026‑50 H1126 1.11(a) 1.11 07/01/2026
135-8 (f), (j) 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027
135-9 (b) 2026‑50 H1126 1.2(a) 1.2 07/07/2026
135-10.1 (a) 2026‑50 H1126 4.5(b) 4.5 07/07/2026
135-10.1 (b) 2026‑50 H1126 4.1(c) 4.1 01/01/2027
135-13.1 2026‑41 S257 5.10(d3) 5.91.8 07/01/2027
135-28.1 (e) 2026‑50 H1126 4.1(c) 4.1 01/01/2027
135-48.12 2026‑41 S257 5.10(f) 5.91.91 07/07/2026
135-48.23 (a) 2026‑40 S1041 4.57 4.9 10/01/2026
135-48.38 (a) 2026‑50 H1126 2.2 2.2 07/07/2026
135-48.41 (d) 2026‑50 H1126 4.1(m) 4.1 01/01/2027
135-48.43 (d) 2026‑50 H1126 2.1(a) 2.1 08/06/2026
135-65 (ll) 2026‑41 S257 41.26(b) 41.9F 07/01/2026
135-66 (a) 2026‑50 H1126 3.1(q) 3.1 07/07/2026
135-96 2026‑41 S257 5.10(e) 5.91.9 07/01/2027
135-96 (f) 2026‑50 H1126 1.9(c) 1.9 07/07/2026
135-106 2026‑50 H1126 4.4(b) 4.4 07/07/2026
135-108 2026‑50 H1126 4.4(c) 4.4 07/07/2026
135-109 2026‑50 H1126 4.2 4.2 07/07/2026
135-110 (d) 2026‑50 H1126 3.1(r) 3.1 07/07/2026
136-4 2026‑40 S1041 4.58 4.9 10/01/2026
136-17.3 2026‑41 S257 43.21(a) 43.21 07/01/2026
136-18 (9) 1 2026‑46 H1094 27(a) 27 10/01/2026
136-18 (10) 2 2026‑46 H1094 25 25 07/07/2026
136-18.02 2026‑41 S257 43.21(b) 43.21B 07/01/2026
136-18.05 (b)(1a) 2026‑41 S257 43.23 43.23 07/01/2026
136-18.7 2026‑41 S257 43.20(i) 43.20I 07/01/2026
136-44.2F 2026‑41 S257 43.3 43.3 07/01/2026
136-82 2026‑41 S257 43.15(a) 43.15 07/01/2026
136-82 (b3) 2026‑41 S257 43.15(b) 43.15 07/01/2028
136-89.56 2026‑46 H1094 15 15 07/07/2026
136-89.182 (k) 2026‑46 H1094 14(a) 14 07/07/2026
136-89.183 (b) 2026‑46 H1094 14(b) 14 07/07/2026
136-89.211 2026‑46 H1094 13 13 07/07/2026
136-93 2026‑46 H1094 26(a) 26 07/07/2026
136-93 (b) 2026‑41 S257 43.20(f) 43.20F 07/01/2026
136-93.1 (e) 2026‑41 S257 43.21(c) 43.21C 07/01/2026
136-93.1A (f) 2026‑46 H1094 24(a) 24 10/01/2026
136-131.5 2026‑41 S257 43.20(a) 43.20 07/01/2026
136-133 (d) 2026‑41 S257 43.20(b) 43.20B 07/01/2026
136-133.1 2026‑41 S257 43.20(d) 43.20D 07/01/2026
136-133.2 2026‑41 S257 43.20(e) 43.20E 07/01/2026
136-133.3 2026‑41 S257 43.20(g) 43.20G 07/01/2026
136-133.4 2026‑41 S257 43.20(h) 43.20H 07/01/2026
136-138 2026‑41 S257 43.20(c) 43.20C 07/01/2026
136-140.15 2026‑46 H1094 22(a) 22 07/07/2026
136-140.18 2026‑46 H1094 22(b) 22 07/07/2026
136-140.19 2026‑46 H1094 22(c) 22 07/07/2026
136-189.11 (d3) 2026‑41 S257 43.27(b) 43.27 01/01/2026
138-1 Art. 1 2026‑41 S257 41.27(a) 41.9H 07/01/2026
138-20 Art. 2 2026‑41 S257 41.27(b) 41.9I 07/01/2026
138A-3 (70) 2026‑40 S1041 4.59 4.9 10/01/2026
138A-12 2026‑40 S1041 4.60 4.9 10/01/2026
143-48 2026‑41 S257 22.5(g) 22.5D 07/01/2026
143-48.4 2026‑41 S257 22.5(x) 22.5V 07/01/2026
143-58.5 (b) 2026‑50 H1126 3.1(s) 3.1 07/07/2026
143-64.34 2026‑9 H1123 5.1(e) 5.1 06/19/2026
143-128 2026‑41 S257 22.5(h) 22.5e 07/01/2026
143-128 (g) 2026‑9 H1123 5.1(f) 5.1 06/19/2026
143-128.1 (b), (c) 2026‑41 S257 22.5(i) 22.5F 07/01/2026
143-128.1A (b), (c) 2026‑41 S257 22.5(j) 22.5G 07/01/2026
143-128.1B 2026‑41 S257 22.5(k) 22.5H 07/01/2026
143-128.1C 2026‑41 S257 22.5(l) 22.5I 07/01/2026
143-128.2 2026‑41 S257 22.5(x) 22.5W 07/01/2026
143-128.3 2026‑41 S257 22.5(x) 22.5X 07/01/2026
143-129 2026‑9 H1123 5.1(d) 5.1 06/19/2026
143-129.4 2026‑41 S257 22.5(m) 22.5J 07/01/2026
143-132 (a1) 2026‑41 S257 22.6 22.6 07/07/2026
143-134.1 (b1) 2026‑9 H1123 5.1(c) 5.1 06/19/2026
143-135.5 2026‑41 S257 22.5(n) 22.5K 07/01/2026
143-135.26 2026‑41 S257 5.12 5.93 07/01/2026
143-135.26 (9)b1. 2026‑41 S257 22.5(o) 22.5L 07/01/2026
143-136 (d) 2026‑41 S257 13.4(c) 13.92 01/01/2027
143-136.1 (d) 2026‑41 S257 13.4(d) 13.93 01/01/2027
143-137 2026‑41 S257 13.4(e) 13.94 01/01/2027
143-137.1 2026‑41 S257 13.4(f) 13.95 01/01/2027
143-138 2026‑41 S257 13.4(g) 13.96 01/01/2027
143-138 (b4) 2026‑11 S401 19(b) 19 07/01/2026
143-138.1 2026‑41 S257 13.4(h) 13.97 01/01/2027
143-139 2026‑41 S257 13.4(i) 13.98 01/01/2027
143-140.1 2026‑41 S257 13.4(j) 13.99 01/01/2027
143-141 2026‑41 S257 13.4(l) 13.990 01/01/2027
143-151.8 2026‑41 S257 13.4(m) 13.991 01/01/2027
143-151.9 2026‑41 S257 13.4(n) 13.992 01/01/2027
143-151.19 2026‑41 S257 13.4(o) 13.993 01/01/2027
143-151.63 2026‑41 S257 13.4(p) 13.994 01/01/2027
143-162.8 2026‑41 S257 5.9(a3) 5.9 See Bill
143-162.8 (i) 2026‑41 S257 5.9(a1) 5.9 See Bill
143-166.30 (g1) 2026‑50 H1126 1.6(a) 1.6 07/07/2026
143-166.41 2026‑33 H481 1(a) 1 07/02/2026
143-166.41 (c)(3) 2026‑33 H481 1(c) 1 07/02/2026
143-166.42 2026‑33 H481 1(b) 1 07/02/2026
143-166.50 (e2) 2026‑50 H1126 1.6(b) 1.6 07/07/2026
143-166.60 (d)(4) 2026‑50 H1126 4.9(a) 4.9 07/07/2026
143-166.82 (b) 2026‑50 H1126 3.1(t) 3.1 07/07/2026
143-202.4 2026‑40 S1041 4.61 4.9 10/01/2026
143-214.7 2026‑32 H376 5.5(a) 5.5 07/02/2026
143-214.7 2026‑39 H162 2(a) 2 07/06/2026
143-215.3 (a)(1b) 2026‑41 S257 12.11 12.9 07/01/2026
143-215.6E 2026‑11 S401 4 4 06/22/2026
143-215.22L 2026‑41 S257 12.6(a1) 12.6 07/01/2026
143-215.32A (b) 2026‑41 S257 12.14(a) 12.93 07/01/2026
143-215.73N Art. 21, Part 8E 1 2026‑41 S257 12.19(a) 12.992 07/01/2026
143-215.73N 2 2026‑41 S257 12.19(b) 12.994 07/01/2026
143-215.73O 2026‑41 S257 12.19(a) 12.993 07/01/2026
143-215.73O 2026‑41 S257 12.19(b) 12.994 07/01/2026
143-215.73P 2026‑41 S257 12.19(a) 12.993 07/01/2026
143-215.73P 2026‑41 S257 12.18(b) 12.992 07/01/2026
143-215.94U (a)(7), (a)(8) 2026‑41 S257 12.16(a) 12.98 07/01/2026
143-215.107A 2026‑41 S257 12.13(c) 12.92 07/01/2026
143-215.107A (c) 2026‑41 S257 12.13(a) 12.91 See Bill
143-250.1 (b) 2026‑50 H1126 3.1(u) 3.1 07/07/2026
143-254.5 2026‑43 H747 1 1 07/07/2026
143-254.6 (e)(4) 2026‑41 S257 22.5(p) 22.5M 07/01/2026
143-300.35 (a) 2026‑40 S1041 4.62 4.9 10/01/2026
143-341 (4)b. 1 2026‑41 S257 22.3(b) 22.3 07/01/2026
143-341 (4)g. 2 2026‑41 S257 22.4(a) 22.4 07/07/2026
143-341 (8) 3 2026‑41 S257 22.2 22.2 07/01/2026
143-341 (8) 4 2026‑41 S257 22.4(b) 22.4 07/01/2026
143-442 2026‑11 S401 11 11 06/22/2026
143-554 (a) 2026‑40 S1041 4.63 4.9 10/01/2026
143-580 Art. 63 2026‑40 S1041 4.64 4.9 10/01/2026
143-581 2026‑40 S1041 4.64 4.9 10/01/2026
143-582 2026‑40 S1041 4.64 4.9 10/01/2026
143-583 2026‑40 S1041 4.64 4.9 10/01/2026
143-584 2026‑40 S1041 4.64 4.9 10/01/2026
143-589 2026‑40 S1041 4.64 4.9 10/01/2026
143-652.2 (f) 2026‑40 S1041 4.65 4.9 10/01/2026
143-719 (b) 2026‑50 H1126 3.1(v) 3.1 07/07/2026
143-728 (e) 2026‑40 S1041 4.66 4.9 10/01/2026
143-747 (a1) 2026‑40 S1041 4.67 4.9 10/01/2026
143-755 2026‑41 S257 39.5(g) 39.5F 07/01/2026
143-805 (d) 2026‑44 S355 5.2(a) 5.2 07/07/2026
143-805 (d)(8) 2026‑34 H83 3(a) 3 07/02/2026
143-821 Art. 85 2026‑41 S257 11.17(a) 11.95 10/01/2026
143-822 2026‑41 S257 11.17(a) 11.95 10/01/2026
143-826 Art. 86 2026‑41 S257 11.16(a) 11.94 10/01/2026
143-827 2026‑41 S257 11.16(a) 11.94 10/01/2026
143A-48 2026‑41 S257 7.4(y) 7.4995 07/01/2026
143A-78 2026‑41 S257 13.4(b) 13.91 01/01/2027
143B-53.2 (c) 2026‑40 S1041 4.68 4.9 10/01/2026
143B-63 2026‑41 S257 5.10(l) 5.91.98 07/07/2026
143B-87.1 2026‑41 S257 14.5 14.5 07/01/2026
143B-88 2026‑41 S257 14.4(a) 14.4 06/30/2026
143B-135.59 2026‑46 H1094 27(b) 27 10/01/2026
143B-135.188 2026‑41 S257 14.11(a) 14.6 07/01/2026
143B-135.209 2026‑41 S257 14.11(b) 14.7 07/01/2026
143B-135.214 (f) 2026‑41 S257 22.5(q) 22.5N 07/01/2026
143B-135.236 (a) 2026‑50 H1126 3.1(w) 3.1 07/07/2026
143B-168.12 (a)(2) 2026‑40 S1041 4.69 4.9 10/01/2026
143B-168.14 (a)(2) 2026‑40 S1041 4.70 4.9 10/01/2026
143B-168.15 (h) 2026‑41 S257 9D.9(d) 9D.5 07/01/2026
143B-216.70 (b) 2026‑40 S1041 4.71 4.9 10/01/2026
143B-216.80 (b)(1) 2026‑40 S1041 4.72 4.9 10/01/2026
143B-218 2026‑31 S595 9(f) 9 07/02/2026
143B-219 2026‑31 S595 9(g) 9 07/02/2026
143B-245.10 2026‑31 S595 9(b) 9 07/02/2026
143B-245.10 2026‑41 S257 44.6(d1) 44.6E 07/07/2026
143B-245.11 2026‑41 S257 44.6(d2) 44.6F 07/07/2026
143B-245.12 2026‑41 S257 44.6(d3) 44.6G 12/01/2026
143B-245.13 2026‑41 S257 44.6(d4) 44.6H 07/07/2026
143B-245.15 2026‑31 S595 9(c) 9 07/02/2026
143B-245.15 2026‑41 S257 44.6(d6) 44.6J See Bill
143B-245.16 2026‑31 S595 9(e) 9 07/02/2026
143B-279.13 2026‑41 S257 12.16(b) 12.99 07/01/2026
143B-279.19 (a) 2026‑41 S257 12.12(a) 12.90 07/01/2026
143B-279.22 2026‑41 S257 12.7(a) 12.7 07/07/2026
143B-279.25 2026‑41 S257 12.8 12.8 07/01/2026
143B-283 (b4) 2026‑41 S257 12.22(a) 12.22 07/01/2026
143B-289.57 (f) 2026‑11 S401 21(a) 21 06/22/2026
143B-350 (f) 2026‑41 S257 43.27(c) 43.27C 01/01/2026
143B-393 (a)(9) 2026‑41 S257 19.4(b) 19.4A 07/01/2026
143B-394.2 (a) 2026‑40 S1041 4.73 4.9 10/01/2026
143B-407 2026‑41 S257 22.9(a) 22.9 See Bill
143B-431.01 (d)(2)a. 2026‑41 S257 5.10(g) 5.91.93 07/07/2026
143B-431.01 (j) 2026‑40 S1041 4.74 4.9 10/01/2026
143B-434.01 (e)(2) 2026‑41 S257 22.5(r) 22.5O 07/01/2026
143B-437.02A 2026‑41 S257 11.4(a) 11.4 07/01/2026
143B-437.02C 2026‑41 S257 11.5 11.5 07/01/2026
143B-437.012 2026‑41 S257 11.8 11.8 07/01/2026
143B-437.012 (d)(2c)c. 2026‑42 H56 4.4 4.4 07/01/2026
143B-437.021 2026‑41 S257 11.6 11.6 07/01/2026
143B-437.57 (a)(16) 2026‑41 S257 22.5(s) 22.5P 07/01/2026
143B-803 2026‑41 S257 19.10 19.9 07/01/2026
143B-901 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-902 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-903 2026‑41 S257 19.4(a) 19.4 07/01/2026
143B-904 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-905 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-1001 2026‑41 S257 20.12(d) 20.8H 07/07/2026
143B-1100 2026‑41 S257 21.3(a) 21.3 07/07/2026
143B-1203 Art. 13, Part 8 2026‑41 S257 20.8(b) 20.8 07/01/2026
143B-1204 2026‑41 S257 20.8(b) 20.8 07/01/2026
143B-1205 2026‑41 S257 20.8(b) 20.8 07/01/2026
143B-1206 2026‑41 S257 20.8(b) 20.8 07/01/2026
143B-1207 2026‑41 S257 20.8(b) 20.8 07/01/2026
143B-1208.3 2026‑41 S257 20.13 20.8K 07/01/2026
143B-1208.13 2026‑41 S257 20.3 20.3F 07/01/2026
143B-1208.15A 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-1208.15A 2026‑41 S257 20.2(p) 20.2Y 07/07/2026
143B-1208.16 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-1208.16 2026‑41 S257 20.2(q) 20.2Z 07/07/2026
143B-1208.18 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-1208.18 2026‑41 S257 20.2(s) 20.3 07/07/2026
143B-1208.19 2026‑41 S257 20.2(o) 20.2X 07/07/2026
143B-1208.19 2026‑41 S257 20.2(t) 20.3A 07/07/2026
143B-1208.19 (d) 2026‑41 S257 20.11(a) 20.8F 07/01/2026
143B-1209 2026‑41 S257 20.12(d) 20.8I 07/07/2026
143B-1209.11 (b) 2026‑41 S257 7.31(l) 7.999992 07/01/2026
143B-1209.11 (f) 2026‑40 S1041 4.75 4.9 10/01/2026
143B-1209.103 2026‑41 S257 20.10(c) 20.8E 07/01/2026
143B-1211 (10) 2026‑41 S257 35.2(a) 35.2 07/01/2026
143B-1211 (24) 2026‑41 S257 35.4 35.4 07/01/2026
143B-1212 2026‑40 S1041 4.76 4.9 10/01/2026
143B-1218 2026‑41 S257 35.3(b) 35.3 07/07/2026
143B-1218 2026‑41 S257 35.3(d) 35.3B 07/07/2026
143B-1285 2026‑41 S257 35.2(a) 35.2A 07/01/2026
143B-1291 2026‑41 S257 35.2(a) 35.2B 07/01/2026
143B-1293 2026‑41 S257 35.2(a) 35.2C 07/01/2026
143B-1294 2026‑41 S257 35.2(a) 35.2D 07/01/2026
143B-1295 2026‑41 S257 35.2(a) 35.2E 07/01/2026
143B-1296 2026‑41 S257 35.2(a) 35.2F 07/01/2026
143B-1300 2026‑41 S257 35.2(a) 35.2G 07/01/2026
143B-1301 2026‑41 S257 35.2(a) 35.2H 07/01/2026
143B-1311 2026‑41 S257 35.2(a) 35.2I 07/01/2026
143B-1320 (b) 2026‑41 S257 20.6 20.6 07/01/2026
143B-1322 (b) 2026‑40 S1041 4.77 4.9 10/01/2026
143B-1332 2026‑41 S257 5.5(e) 5.5 07/01/2026
143B-1333 (a) 2026‑41 S257 40.2 40.2 07/01/2026
143B-1345 2026‑41 S257 40.5(a) 40.5 07/01/2026
143B-1361 2026‑41 S257 22.5(t) 22.5Q 07/01/2026
143B-1377 (e) 2026‑41 S257 24.1(b) 24.1A 07/01/2026
143B-1446 2026‑41 S257 17.1(a) 17.1 07/01/2026
143B-1447 2026‑41 S257 17.13(a) 17.9C 07/01/2026
143B-1455 2026‑44 S355 2.3(c) 2.3 07/07/2026
143B-1470 (c) 2026‑41 S257 17.9(a) 17.9 07/07/2026
143B-1484 (b) 2026‑44 S355 4.1 4.1 07/07/2026
143B-1491 (d) 2026‑44 S355 1.3(a) 1.3 07/07/2026
143B-1730 2026‑41 S257 20.5 20.5 07/01/2026
143B-1731 2026‑41 S257 21.4 21.4 07/01/2026
143B-1751 2026‑41 S257 21.1 21.1 07/01/2026
143C-1-1 (d) 2026‑41 S257 5.6(b) 5.6 07/01/2026
143C-1-1 (d)(5) 2026‑9 H1123 5.1(a) 5.1 06/19/2026
143C-1-2 (b) 2026‑41 S257 5.6(c) 5.6 07/01/2026
143C-2-5 (a), (c) 2026‑41 S257 5.6(d) 5.6 07/01/2026
143C-3-5 (b) 2026‑41 S257 5.6(e) 5.6 07/01/2026
143C-4-3.1 (b) 2026‑41 S257 5.5(a) 5.5 07/01/2026
143C-4-3.1 (b) 2026‑41 S257 42.1(m) 42.1A 07/01/2026
143C-4-9 2026‑41 S257 41.24 41.9D 07/01/2026
143C-4-10 (b)(3) 2026‑41 S257 5.10(f1) 5.91.92 07/07/2026
143C-4-11 2026‑41 S257 9E.11 9E.93 07/01/2026
143C-5-4 (b) 2026‑41 S257 5.6(f) 5.6 07/01/2026
143C-5-4.1 2026‑41 S257 5.6(g) 5.6 07/01/2026
143C-6-4 2026‑41 S257 5.6(h) 5.6 07/01/2026
143C-6-5.1 2026‑41 S257 5.6(i) 5.6 07/01/2026
143C-6-9 (b) 2026‑41 S257 16.20(u) 16.999T 07/01/2027
143C-6-10 2026‑40 S1041 4.78 4.9 10/01/2026
143C-6-11 (l), (p) 2026‑41 S257 5.6(j) 5.6 07/01/2026
143C-6-12.1 2026‑41 S257 19.1(a) 19.1 07/01/2026
143C-6-13 2026‑41 S257 5.6(k) 5.6 07/01/2026
143C-8-6 2026‑41 S257 5.13(a) 5.94 07/01/2026
143C-8-7.1 2026‑41 S257 42.7(a) 42.7 07/01/2026
143C-8-7.2 2026‑9 H1123 6.1 6.1 06/19/2026
143C-9-2 (a) 2026‑50 H1126 3.1(x) 3.1 07/07/2026
143C-9-3 2026‑41 S257 5.6(l) 5.6 07/07/2026
143C-10-1 2026‑41 S257 5.9(a4) 5.9 See Bill
143C-10-2 2026‑41 S257 5.9(a4) 5.9 See Bill
143C-10-3 2026‑41 S257 5.9(a4) 5.9 See Bill
143C-215.32B 2026‑41 S257 5A.4 5.95 07/01/2026
145-52 2026‑41 S257 39.1(a) 39.1 07/07/2026
145-53 2026‑41 S257 39.1(b) 39.1 07/07/2026
146-30 (d)(16) 2026‑41 S257 17.11(b) 17.9B 07/01/2026
147-11 (a) 2026‑41 S257 41.4(a) 41.4 07/01/2026
147-34 2026‑41 S257 37.2(d) 37.2C 07/01/2026
147-36 2026‑41 S257 37.2(b) 37.2A 07/01/2026
147-41 2026‑41 S257 37.2(d) 37.2d 07/01/2026
147-43 2026‑41 S257 37.2(d) 37.2e 07/01/2026
147-50 2026‑41 S257 37.2(c) 37.2B 07/01/2026
147-54 2026‑41 S257 37.2(e) 37.2F 07/01/2026
147-54.5 (e) 2026‑50 H1126 3.1(y) 3.1 07/07/2026
147-64.6 2026‑41 S257 24.5(c) 24.5 10/01/2026
147-64.6 (c) 2026‑41 S257 39.3(c) 39.3B 07/07/2026
147-64.6 (d) 2026‑40 S1041 4.79 4.9 10/01/2026
147-64.6E 2026‑41 S257 24.1(a) 24.1 07/01/2026
147-64.7 (b)(2) 2026‑41 S257 24.5(d) 24.5 10/01/2026
147-65.1 (7)i. 2026‑50 H1126 4.9(h) 4.9 07/07/2026
147-65.2 2026‑40 S1041 4.80 4.9 10/01/2026
147-68.7 2026‑41 S257 38.1(a) 38.1 07/07/2026
147-69.2 (a) 2026‑41 S257 35.1(d) 35.1B 07/01/2026
147-69.2 (a)(17m) 2026‑41 S257 5.5(c) 5.5 07/01/2026
147-69.2A (b) 2026‑50 H1126 4.9(f) 4.9 07/07/2026
147-69.6 (a) 2026‑50 H1126 3.1(z) 3.1 07/07/2026
147-72.1 (c) 2026‑40 S1041 4.81 4.9 10/01/2026
147-86.11 (f)(1) 2026‑50 H1126 2.3 2.3 07/07/2026
147-86.57 (4a) 2026‑50 H1126 3.2(a) 3.2 07/07/2026
147-86.58 2026‑50 H1126 3.2(b) 3.2 07/07/2026
147-86.60 (a) 2026‑50 H1126 3.2(c) 3.2 07/07/2026
147-86.61 (b) 2026‑50 H1126 3.2(d) 3.2 07/07/2026
147-86.72 (a1) 2026‑50 H1126 1.9(d) 1.9 07/07/2026
147-86.80 (3a), (4) 2026‑50 H1126 3.2(e) 3.2 07/07/2026
147-86.81 2026‑50 H1126 3.2(f) 3.2 07/07/2026
148-19 (b1) 2026‑41 S257 17.4(b) 17.4A 07/01/2026
148-19.4 2026‑41 S257 17.4(a) 17.4 07/01/2026
148-32.1 (b2)(1) 2026‑41 S257 17.10 17.9A 07/07/2026
148-37.3 (c) 2026‑41 S257 20.2(y) 20.3E 07/07/2026
148-65.7 (a),(c) 2026‑41 S257 17.6(a) 17.6 07/07/2026
148-118.8 (a) 2026‑40 S1041 4.82 4.9 10/01/2026
148-132 2026‑44 S355 2.2 2.2 07/07/2026
150B-1 (d) 2026‑41 S257 43.21(d) 43.21D 07/01/2026
150B-1 (f) 2026‑41 S257 8A.18(a) 8A.95 07/01/2025
150B-1 (f), (g) 2026‑41 S257 8A.18(b) 8A.95 07/01/2026
150B-2 (3) 2026‑31 S595 4.9 4.9 07/02/2026
150B-23 (a) 2026‑40 S1041 4.83 4.9 10/01/2026
150B-25.1 (c) 2026‑40 S1041 4.84 4.9 10/01/2026
150B-33 (b)(11) 2026‑40 S1041 4.85 4.9 10/01/2026
151D-31.3 2026‑41 S257 6.11 6.9 07/01/2026
153A-27.1 (h) 2026‑25 S876 1(a) 1 07/02/2026
153A-92 (b)(5) 2026‑40 S1041 4.86 4.9 10/01/2026
153A-145.5 catch line, (c) 2026‑19 S153 5(a) 5 06/24/2026
153A-149 (c)(34) 2026‑41 S257 5.11(a) 5.92. 07/01/2026
153A-155 2026‑15 S484 2 2 06/22/2026
153A-156 2026‑31 S595 7.2(a) 7.2 10/01/2026
153A-200 (c) 2026‑31 S595 10(c) 10 10/01/2026
153A-205 2026‑46 H1094 21(a) 21 07/07/2026
153A-212.1 2026‑41 S257 16.20(v) 16.999U 07/01/2027
153A-245.1 2026‑46 H1094 19(d) 19 12/01/2026
153A-274 (1) 2026‑41 S257 5.11(b) 5.92 07/01/2026
153A-435.1 2026‑19 S153 5(b) 5 06/24/2026
153A-439 (b) 2026‑40 S1041 4.87 4.9 10/01/2026
159-3 (a) 2026‑41 S257 5.10(b) 5.91.2 07/07/2026
159-7 (d) 2026‑50 H1126 4.7 4.7 07/07/2026
159-13 (b)(21) 2026‑41 S257 39.3(a) 39.3 07/07/2026
159-28 (b1) 2026‑41 S257 39.3(b) 39.3A 07/07/2026
159-30 (c) 2026‑41 S257 39.2 39.2 07/01/2026
159-34 (f) 2026‑50 H1126 6.3 6.3 07/07/2026
159-48 (c)(4a) 2026‑46 H1094 21(b) 21 07/07/2026
159-182 2026‑41 S257 5.9(a4) 5.9 See Bill
159-183 2026‑41 S257 5.9(a4) 5.9 See Bill
159B-39 Local Modification 2026‑27 S1076 1(a) 1 07/02/2026
159B-39 Local Modification 2026‑27 S1076 3(a) 3 07/02/2026
159D-37 2026‑50 H1126 7.1 7.1 07/07/2026
159D-38 2026‑41 S257 5.10(a) 5.91.1 07/07/2026
159D-38 (a) 2026‑50 H1126 7.2 7.2 07/07/2026
159D-45 (f) 2026‑50 H1126 7.3 7.3 07/07/2026
159G-20 2026‑41 S257 12.4(b) 12.4 07/01/2026
159G-20 (21) 2026‑41 S257 12.2(f) 12.2 07/01/2026
159G-22 2026‑41 S257 12.4(c) 12.4 07/01/2026
159G-22 (a) 2026‑41 S257 5.5(d) 5.5 07/01/2026
159G-26 (b) 2026‑41 S257 12.2(g) 12.2 07/01/2026
159G-30 2026‑41 S257 12.4(d) 12.4 07/01/2026
159G-31 2026‑41 S257 12.4(e) 12.4 07/01/2026
159G-32 2026‑41 S257 12.4(f) 12.4 07/01/2026
159G-34.1 2026‑41 S257 12.4(g) 12.4 07/01/2026
159G-35 2026‑41 S257 12.4(h) 12.4 07/01/2026
159G-36 2026‑41 S257 12.4(i) 12.4 07/01/2026
159G-36 (c) 2026‑41 S257 12.2(h) 12.2 07/01/2026
159G-37 2026‑41 S257 12.4(j) 12.4 07/01/2026
159G-39 2026‑41 S257 12.4(k) 12.4 07/01/2026
159G-40 2026‑41 S257 12.4(l) 12.4 07/01/2026
159G-42 2026‑41 S257 12.4(m) 12.4 07/01/2026
159G-43 2026‑41 S257 12.4(n) 12.4 07/01/2026
159G-71 (13) 2026‑41 S257 8.27(m) 8.994 07/01/2026
159G-75 Art. 6 2026‑41 S257 8.27(l) 8.993 07/01/2026
159G-77 2026‑41 S257 8.27(l) 8.993 07/01/2026
159G-79 2026‑41 S257 8.27(l) 8.993 07/01/2026
160A-58.1 (b) 2026‑17 S809 1 1 06/24/2026
160A-58.1 (b)(5) 2026‑22 S811 1 1 06/25/2026
160A-58.54 (d) 2026‑41 S257 39.4(a) 39.4 07/07/2026
160A-205.2 catch line, (c) 2026‑19 S153 5(c) 5 06/24/2026
160A-205.8 2026‑51 H372 1 1 07/07/2026
160A-209 (c)(32) 2026‑41 S257 5.11(c) 5.92 07/01/2026
160A-215 2026‑15 S484 1 1 06/22/2026
160A-215 (g) 2026‑35 H332 1.6 1.6 07/02/2026
160A-215.1 2026‑31 S595 7.2(b) 7.2 10/01/2026
160A-233 (c) 2026‑31 S595 10(b) 10 10/01/2026
160A-288 (b) 2026‑53 H206 7(a) 7 07/07/2026
160A-289.1 2026‑41 S257 16.20(w) 16.999V 07/01/2027
160A-300.2 2026‑46 H1094 19(c) 19 12/01/2026
160A-304 (a) 2026‑41 S257 20.2(m) 20.2H 07/07/2026
160A-311 (2) 2026‑41 S257 5.11(d) 5.92 07/01/2026
160A-314.2 Local Modification 2026‑27 S1076 1(b) 1 07/02/2026
160A-339 Local Modification 2026‑27 S1076 2(a) 2 07/01/2027
160A-341 2026‑48 S857 65 65 10/01/2026
160A-485.1 2026‑19 S153 5(d) 5 06/24/2026
160A-635 (f) 2026‑31 S595 15(a) 15 07/02/2026
160A-700 (d)(5) 2026‑41 S257 7.31(m) 7.999993 07/01/2026
160D-202 (h) Local Modification 2026‑25 S876 2(a) 2 07/02/2026
160D-402 2026‑41 S257 13.4(q) 13.995 01/01/2027
160D-403 (b1) 2026‑41 S257 39.5(e) 39.5D 07/01/2026
160D-405 (b) 2026‑41 S257 39.5(f) 39.5E 07/01/2026
160D-702 (c) 2026‑39 H162 1(a) 1 01/01/2027
160D-903 2026‑11 S401 19(a) 19 07/01/2026
160D-904 Local Modification 2026‑25 S876 11(a) 9.1 07/02/2026
160D-917 2026‑ H437 2(a) 2 06/30/2027 Vetoed
160D-1403.1 2026‑41 S257 39.5(a) 39.5 07/01/2026
160D-1405 2026‑41 S257 39.5(d) 39.5C 07/01/2026
161-14.04 2026‑54 H133 2 2 04/01/2027
161-50.2 (b) 2026‑50 H1126 3.1(aa) 3.1 07/07/2026
162A-19.1 2026‑32 H376 2 2 07/02/2026
162A-19.2 2026‑32 H376 3 3 07/02/2026
164-14 2026‑24 S858 1 1 06/29/2026
164-38 2026‑41 S257 16.16(a) 16.993 12/01/2026
164-51 2026‑41 S257 16.12(b) 16.98 07/07/2026
166A-19.3 (10) 2026‑41 S257 5A.19(a) 5A.19.1 01/01/2025
166A-19.12 (26a) 2026‑41 S257 5A.18 5A.18 07/01/2026
166A-19.15 (f)(2) 2026‑41 S257 5A.19(b) 5A.19.2 01/01/2025
166A-19.60 2026‑41 S257 5A.19(c) 5A.19.3 01/01/2025
168A-10.1 2026‑40 S1041 4.88 4.9 10/01/2026
169-13 (b) 2026‑40 S1041 4.89 4.9 10/01/2026
1143B-1293 (d) 2026‑41 S257 35.3(c) 35.3A 06/30/2026
1876-14 PrivateLaw 2026‑25 S876 5.2(a) 5.2 07/02/2026
1883-103 s. 4 Uncodified 2026‑18 H1035 9.7(b) 9.7 06/24/2026
1883-103 s. 4.1 Uncodified 2026‑18 H1035 9.7(a) 9.7 06/24/2026
1887-154 s. 3.3.6 Uncodified 2026‑18 H1035 10(a) 10 06/24/2026
1893-11 s. 3 Uncodified 2026‑18 H1035 9.3(b) 9.3 06/24/2026
1893-11 s. 3.1 Uncodified 2026‑18 H1035 9.3(a) 9.3 06/24/2026
1893-11 s. 4 Uncodified 2026‑18 H1035 9.3(b) 9.3 06/24/2026
1893-274 s. 3 Uncodified 2026‑18 H1035 9.2(b) 9.2 06/24/2026
1893-274 s. 3.1 Uncodified 2026‑18 H1035 9.2(a) 9.2 06/24/2026
1893-274 s. 4 Uncodified 2026‑18 H1035 9.2(b) 9.2 06/24/2026
1893-321 s. 3.1 Uncodified 2026‑18 H1035 5(a) 5 06/24/2026
1907-230 s. 3 Uncodified 2026‑18 H1035 9.1(a) 9.1 06/24/2026
1907-230 s. 4 Uncodified 2026‑18 H1035 9.1(b) 9.1 06/24/2026
1907-407 PrivateLaw 2026‑25 S876 5.8(a) 5.8 07/02/2026
1907-407 PrivateLaw 2026‑25 S876 5.8(b) 5.8 07/02/2026
1907-407 PrivateLaw 2026‑25 S876 5.8(c) 5.8 07/02/2026
1907-430 s. 3 Uncodified 2026‑18 H1035 9.6(b) 9.6 06/24/2026
1907-430 s. 3.1 3.2 Uncodified 2026‑18 H1035 9.6(a) 9.6 06/24/2026
1911-223 PrivateLaw 2026‑36 H1220 3 3 07/02/2026
1911-271 s. 3 3 Uncodified 2026‑18 H1035 12.2(a) 12.2 06/24/2026
1911-271 s. 5 5 Uncodified 2026‑18 H1035 12.2(c) 12.2 06/24/2026
1911-271 s. 10 6 Uncodified 2026‑18 H1035 12.2(c) 12.2 06/24/2026
1911-271 s. 11 7 Uncodified 2026‑18 H1035 12.2(b) 12.2 06/24/2026
1913-67 s. 8 PrivateLaw 2026‑36 H1220 1 1 07/02/2026
1915-31 s. 3 Uncodified 2026‑18 H1035 1(c) 1 06/24/2026
1915-31 s. 3.1 Uncodified 2026‑18 H1035 1(a) 1 06/24/2026
1915-31 s. 3.2 Uncodified 2026‑18 H1035 1(b) 1 06/24/2026
1935-63 PrivateLaw 2026‑25 S876 5.5(a) 5.5 07/02/2026
1947-793 Uncodified 2026‑18 H1035 12.2(d) 12.2 06/24/2026
1953-389 Uncodified 2026‑18 H1035 12.2(d) 12.2 06/24/2026
1955-760 Uncodified 2026‑18 H1035 1(d) 1 06/24/2026
1955-789 Uncodified 2026‑18 H1035 9.6(c) 9.6 06/24/2026
1961-76 Uncodified 2026‑18 H1035 9.3(c) 9.3 06/24/2026
1961-109 Uncodified 2026‑18 H1035 9.1(c) 9.1 06/24/2026
1961-323 s. 2.01 Uncodified 2026‑18 H1035 9.5(a) 9.5 06/24/2026
1961-323 s. 2.51 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.52 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.53 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.54 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.55 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.56 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.57 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.58 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.71 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.72 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.73 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-323 s. 2.74 Uncodified 2026‑18 H1035 9.5(b) 9.51 06/24/2026
1961-366 s. 2 Uncodified 2026‑18 H1035 2(a) 2 06/24/2026
1967-571 s. 11 Uncodified 2026‑28 H1040 2(b) 2 07/02/2026
1967-571 s. 13 Uncodified 2026‑28 H1040 2(c) 2 07/02/2026
1967-571 s. 16 Uncodified 2026‑28 H1040 2(d) 2 07/02/2026
1967-571 s. 4 Uncodified 2026‑28 H1040 1(a) 1 07/02/2026
1967-571 s. 5 Uncodified 2026‑28 H1040 1(b) 1 07/02/2026
1967-571 s. 6 Uncodified 2026‑28 H1040 2(a) 2 07/02/2026
1971-341 s. 2 Uncodified 2026‑25 S876 9(a) 9 07/01/2026
1971-341 s. 2.1 Uncodified 2026‑25 S876 9(b) 9 07/01/2026
1973-1100 s. 4.1 Uncodified 2026‑18 H1035 8(a) 8 06/24/2026
1973-1100 s. 5 Uncodified 2026‑18 H1035 8(b) 8 06/24/2026
1975-97 Uncodified 2026‑18 H1035 9.3(c) 9.3 06/24/2026
1975-147 s. 1 Uncodified 2026‑25 S876 5.1(a) 5.1 07/02/2026
1975-147 s. 1 Uncodified 2026‑25 S876 5.1(b) 5.1 07/02/2026
1977-55 Uncodified 2026‑22 S811 9(a) 9 06/25/2026
1977-58 s. 2.2 Uncodified 2026‑18 H1035 6(b) 6 06/24/2026
1977-58 s. 3.1 Uncodified 2026‑18 H1035 6(a) 6 06/24/2026
1977-58 s. 3.2 Uncodified 2026‑18 H1035 6(c) 6 06/24/2026
1977-78 s. 4.01 Uncodified 2026‑18 H1035 9.4(a) 9.4 06/24/2026
1977-84 s. 4 Uncodified 2026‑18 H1035 3(a) 3 06/24/2026
1977-84 s. 5 Uncodified 2026‑18 H1035 3(b) 3 06/24/2026
1977-101 s. 2.2 Uncodified 2026‑18 H1035 12.1(b) 12.1 06/24/2026
1977-101 s. 3.1 Uncodified 2026‑18 H1035 12.1(a) 12.1 06/24/2026
1977-101 s. 3.2 Uncodified 2026‑18 H1035 12.1(c) 12.1 06/24/2026
1977-101 s. 3.3 Uncodified 2026‑18 H1035 12.1(c) 12.1 06/24/2026
1977-237 s. 1 Uncodified 2026‑25 S876 5.9(a) 5.9 07/02/2026
1977-333 s. 1 Uncodified 2026‑29 H1215 1 1 07/02/2026
1979-82 s. 1 Uncodified 2026‑18 H1035 5(b) 5 06/24/2026
1979-82 s. 2 Uncodified 2026‑18 H1035 5(b) 5 06/24/2026
1979-82 s. 3 Uncodified 2026‑18 H1035 5(b) 5 06/24/2026
1979-243 s. 1 Uncodified 2026‑25 S876 5.4(a) 5.4 07/02/2026
1979-259 s. 1 Uncodified 2026‑25 S876 4(a) 4 See Bill
1979-259 s. 1 Uncodified 2026‑25 S876 4(b) 4 07/02/2026
1979-259 s. 1 Uncodified 2026‑25 S876 4(c) 4 07/02/2026
1979-259 s. 1 Uncodified 2026‑25 S876 4(d) 4 07/02/2026
1981-352 s. 1 Uncodified 2026‑25 S876 5.6(a) 5.6 07/02/2026
1981-352 s. 1 Uncodified 2026‑25 S876 5.6(b) 5.6 07/02/2026
1985-46 s. 2.3 Uncodified 2026‑18 H1035 7(a) 7 06/24/2026
1987-32 ss. 1, 2 Uncodified 2026‑35 H332 1.1(a) 1.1 10/01/2026
1987-209 s. 1 Uncodified 2026‑7 H240 1(a) 1 06/18/2026
1987-601 s. 2 Uncodified 2026‑25 S876 5.7(a) 5.7 07/02/2026
1989-1042 s. 3.3 Uncodified 2026‑18 H1035 9.8(a) 9.8 06/24/2026
1989-1042 s. 3.4 Uncodified 2026‑18 H1035 9.8(a) 9.8 06/24/2026
1989-1042 s. 4.1 Uncodified 2026‑18 H1035 9.8(b) 9.8 06/24/2026
1991-371 s. 2 Uncodified 2026‑25 S876 9(c) 9 07/01/2026
1993-35 Uncodified 2026‑18 H1035 12.2(d) 12.2 06/24/2026
1999-239 s. 1 Uncodified 2026‑25 S876 5.3(a) 5.3 07/02/2026
1999-239 s. 1 Uncodified 2026‑25 S876 5.3(b) 5.3 07/02/2026
1999-323 s. 1 2026‑41 S257 44.12(a) 44.9H 07/07/2026
1999-323 s. 1 2026‑41 S257 44.12(b) 44.9I 07/01/2027
2002-138 s. 1(d) Uncodified 2026‑7 H240 2(a) 2 06/18/2026
2005-54 s. 2 Uncodified 2026‑18 H1035 9.3(c) 9.3 06/24/2026
2007-323 s. 7.9(a) Uncodified 2026‑41 S257 7.3(d) 7.3 07/01/2026
2008-105 s. 1 Uncodified 2026‑25 S876 5.11(a) 5.92 07/02/2026
2010-64 2026‑25 S876 7(a) 7 01/01/2027
2011-145 s. 8.3(b) Uncodified 2026‑41 S257 6.2(a) 6.21 07/01/2026
2013-360 18A.4 2026‑41 S257 16.27 16.9994 07/01/2026
2013-360 s. 10.4(a) Uncodified 2026‑41 S257 6.2(a) 6.21 07/01/2026
2014-100 s. 7.14 2026‑46 H1094 12 12 07/07/2026
2015-35 s. 3.5(a) Uncodified 2026‑18 H1035 11(a) 11 06/24/2026
2015-241 s. 12H.29 Uncodified 2026‑41 S257 9E.10(a) 9E.92 07/01/2026
2015-241 s. 16A.4 Uncodified 2026‑41 S257 20.12(c) 20.8G 07/07/2026
2015-244 s. 2(a) Uncodified 2026‑25 S876 6(a) 6 12/04/2028
2015-244 s. 2(d) Uncodified 2026‑25 S876 6(b) 6 12/04/2028
2016-41 s. 3.1 Uncodified 2026‑18 H1035 4.1(a) 4.1 06/24/2026
2016-41 s. 3.6 Uncodified 2026‑18 H1035 4.2(a) 4.2 06/24/2026
2016-45 s. 3 Uncodified 2026‑50 H1126 6.2 6.2 07/07/2026
2016-118 s. 3 Uncodified 2026‑41 S257 11.6 11.6 07/01/2026
2017-10 s. 4.9 Uncodified 2026‑41 S257 12.19(a) 12.992 07/01/2026
2017-57 s. 7.23 Uncodified 2026‑41 S257 7.17 7.96 07/01/2026
2017-57 s. 7.23K(b) Uncodified 2026‑41 S257 7.2(a) 7.2 07/01/2026
2017-57 s. 7.23K(c) Uncodified 2026‑41 S257 7.2(b) 7.21 07/01/2026
2017-57 s. 7.32(d) Uncodified 2026‑41 S257 7.7(d) 7.74 07/01/2026
2017-202 s. 3.1(c) Uncodified 2026‑7 H240 3(a) 3 06/18/2026
2018-5 s. 7.17(b) 1 Uncodified 2026‑41 S257 7.7(c) 7.73 07/01/2026
2018-5 s. 34.13(b) 2 Uncodified 2026‑46 H1094 18 18 07/07/2026
2018-32 s. 6 Uncodified 2026‑41 S257 7.51(c) 7.9F2 07/07/2026
2018-32 s. 6(d) Uncodified 2026‑41 S257 7.36(b) 7.9999996 07/01/2026
2018-32 s. 6(p) Uncodified 2026‑41 S257 7.51(a) 7.9F 07/07/2026
2018-32 s. 6(q) Uncodified 2026‑41 S257 7.51(b) 7.9F1 07/07/2026
2019-37 s. 7 Uncodified 2026‑41 S257 12.20(a) 12.995 06/30/2026
2019-99 Uncodified 2026‑30 H1222 1 1 07/02/2026
2019-230 s. 7(b) Uncodified 2026‑41 S257 42.1(g) 42.1 07/01/2026
2020-4 s. 4.3 Uncodified 2026‑3 H433 4 4 05/12/2026
2020-78 s. 17.4 Uncodified 2026‑41 S257 35.1(b) 35.1A 07/01/2026
2020-88 s. 11 Uncodified 2026‑1 H696 3C.17(a) 3 07/01/2025
2020-88 s. 11 Uncodified 2026‑41 S257 9E.23 9E.991 07/01/2026
2021-46 s. 2(b) Uncodified 2026‑23 H117 1 1 06/25/2026
2021-103 Uncodified 2026‑27 S1076 3(b) 3 07/02/2026
2021-180 s. 7.18 1 Uncodified 2026‑41 S257 7.37 7.9999997 07/01/2026
2021-180 s. 7.20 2 Uncodified 2026‑41 S257 7.1(a) 7.1 07/01/2027
2021-180 s. 9D.22 3 Uncodified 2026‑41 S257 9E.26(a) 9E.994 07/01/2026
2021-180 s. 12.13(f)(65) 4 Uncodified 2026‑41 S257 12.3(a) 12.3 07/01/2026
2021-180 s. 19A.7B 5 Uncodified 2026‑41 S257 20.8(c) 20.8A 07/01/2026
2021-180 s. 19A.10 6 Uncodified 2026‑41 S257 9G.3(e) 9G.3 07/01/2026
2021-180 s. 19C.10 7 Uncodified 2026‑41 S257 17.8(a) 17.8 10/01/2026
2021-180 s. 40.1 8 Uncodified 2026‑41 S257 42.8(a) 42.8 07/01/2026
2021-180 s. 40.1(c1)(7) 9 Uncodified 2026‑41 S257 20.12(e) 20.8J 07/07/2026
2021-180 s. 40.8(3) 9.1 Uncodified 2026‑41 S257 42.9(a) 42.9 07/01/2026
2021-180 s. 40.17(a) 9.2 Uncodified 2026‑41 S257 42.5(e) 42.5C 07/01/2026
2021-189 s. 7.4 Uncodified 2026‑41 S257 43.19(a) 43.19 07/07/2026
2022-13 s. 5.6(e) Uncodified 2026‑31 S595 5.6 5.6 07/02/2026
2022-74 s. 9F.2 Uncodified 2026‑41 S257 9G.4(b) 9G.4 07/01/2026
2023-132 s. 2(c) Uncodified 2026‑41 S257 7.53(a) 7.9H 07/07/2026
2023-134 s. 5.3 1 Uncodified 2026‑1 H696 1.1(a) 1.1 06/30/2026
2023-134 s. 7.19 2 Uncodified 2026‑41 S257 7.28(b) 7.99990 07/01/2026
2023-134 s. 7.36(h) 3 Uncodified 2026‑41 S257 7.50 7.9E 07/01/2026
2023-134 s. 10.4(e) 4 Uncodified 2026‑11 S401 6 6 06/22/2026
2023-134 s. 9E.28 5 Uncodified 2026‑41 S257 9E.25(a) 9E.993 07/01/2023
2023-134 s. 11.12(e) 6 Uncodified 2026‑41 S257 11.9(a) 11.9 07/01/2026
2023-134 s. 12.7(d) 7 Uncodified 2026‑41 S257 12.13(c) 12.91 07/01/2026
2023-134 s. 16.9(a) 8 Uncodified 2026‑41 S257 16.13(a) 16.99 07/07/2026
2023-134 s. 19F.7 9 Uncodified 2026‑41 S257 20.8(d) 20.8B 07/01/2026
2023-134 s. 38.4(a) 9.1 Uncodified 2026‑41 S257 20.2(w) 20.3C 07/07/2026
2023-134 s. 40.1 9.2 Uncodified 2026‑41 S257 42.5(a) 42.5 07/01/2026
2023-134 s. 40.7(3) 9.3 Uncodified 2026‑41 S257 42.9(b) 42.9A 07/01/2026
2023-134 s. 40.8(a) 9.4 Uncodified 2026‑41 S257 42.5(d) 42.5B 07/01/2026
2023-134 s. 41.1(b), (c) 9.5 Uncodified 2026‑41 S257 43.1(a) 43.1 07/01/2026
2024-1 s. 4.2(g) Uncodified 2026‑41 S257 12.3(b) 12.3 07/01/2026
2024-32 s. 15(c) Uncodified 2026‑11 S401 24(a) 24 06/22/2026
2024-51 s. 13.1(a) Uncodified 2026‑31 S595 1.7(a) 1.7 07/02/2026
2024-51 s. 13.1(c) Uncodified 2026‑31 S595 1.7(b) 1.7 07/02/2026
2024-53 s. 4C.3(d) Uncodified 2026‑41 S257 5A.23 5A.23 07/01/2026
2024-57 s. 2A.8 Uncodified 2026‑41 S257 8.10(b) 8.90 07/07/2026
2024-57 s. 2H.6 Uncodified 2026‑41 S257 42.5(g) 42.5A 07/01/2026
2025-4 s. 1.1(b) Uncodified 2026‑1 H696 1.1(b) 1.1 06/30/2026
2025-4 s. 9.1(e) Uncodified 2026‑11 S401 24(b) 24 06/22/2026
2025-32 s. 2.3 Uncodified 2026‑26 S1074 2(a) 2 07/02/2026
2025-52 s. 2 Uncodified 2026‑41 S257 37.1(b) 37.1A 07/01/2026
2025-70 s. 24 Uncodified 2026‑41 S257 16.9(a) 16.9 07/07/2026
2025-70 s. 25 Uncodified 2026‑41 S257 16.25(a) 16.9991 07/01/2026
2025-72 s. 6 Uncodified 2026‑1 H696 2.5 2.5 4/30/2026
2025-72 s. 6 Uncodified 2026‑41 S257 8A.6 8A.6 06/30/2025
2025-74 s. 2 Uncodified 2026‑41 S257 12.5(a) 12.5 07/01/2026
2025-74 s. 3 Uncodified 2026‑41 S257 12.5(b) 12.5 07/01/2026
2025-80 s. 11 Uncodified 2026‑41 S257 7.42 7.9B 07/01/2026
2025-89 s. 2A.1(a) Uncodified 2026‑41 S257 4.2(a) 4.2 07/01/2026
2025-89 s. 2A.2(a) Uncodified 2026‑41 S257 4.4 4.4 07/01/2026
2025-89 s. 2A.3(a) Uncodified 2026‑41 S257 4.5 4.5 07/01/2026
2025-89 s. 2B.13(b) Uncodified 2026‑41 S257 9E.5 9E.5 07/01/2026
2025-89 s. 2C.2 Uncodified 2026‑1 H696 4.1 4 4/30/2026
2025-89 s. 2C.2 Uncodified 2026‑41 S257 11.7 11.7 07/01/2026
2025-89 s. 2F.2 Uncodified 2026‑41 S257 43.9 43.9 07/01/2026
2025-97 s. 6.9 Uncodified 2026‑3 H433 1(a) 1 05/12/2026
2025-97 s. 7.1(a), 7.1(c) Uncodified 2026‑41 S257 40.3 40.3 07/01/2026
2026-1 s. 3C.18(a) Uncodified 2026‑41 S257 9E.22(a) 9E.98 07/07/2026
2026-1 s. 3D.7(e) Uncodified 2026‑41 S257 9E.9(b) 9E.9 07/07/2026
2026-1 s. 3D.7(g) Uncodified 2026‑41 S257 9E.9(e) 9E.91 07/07/2026
2026-1 s. 6.2(5) Uncodified 2026‑3 H433 1.1 1.1 05/12/2026
2026-1 s. 6.2(3) Uncodified 2026‑41 S257 26.9 26.9 07/01/2026
2026-8 Uncodified 2026‑47 S474 1 1 07/07/2026
2026-9 s. 2.1(b) Uncodified 2026‑42 H56 2.6 2.6 07/01/2026
2026-19 s. 1(a)(4) Uncodified 2026‑41 S257 5.9(b1) 5.9 07/07/2026
2026-19 s. 1(b)(4) Uncodified 2026‑41 S257 5.9(b2) 5.9 07/07/2026
2026-19 s. 1(c)(4) Uncodified 2026‑41 S257 5.9(b3) 5.9 07/07/2026
2026-19 s. 1(e) Uncodified 2026‑41 S257 5.9(b4) 5.9 07/07/2026
2026-19 s. 2(c) Uncodified 2026‑41 S257 5.9(b5) 5.9 07/07/2026
2026-19 s. 3(c) Uncodified 2026‑41 S257 5.9(b6) 5.9 07/07/2026
2026-19 s. 4 Uncodified 2026‑41 S257 5.9(b7) 5.9 07/07/2026
2026-20 s. 4 Uncodified 2026‑41 S257 5.9(c1) 5.9 07/07/2026
2026-21 s. 3 Uncodified 2026‑41 S257 5.9(d1) 5.9 07/07/2026
2026-40 s. 5.9(f)-(h) Uncodified 2026‑42 H56 4.8(b) 4.8C 07/01/2026
2026-41 s. 5A.2(a)(2)a. 1 Uncodified 2026‑42 H56 1.1(a) 1.1 07/01/2026
2026-41 s. 5A.11(a) 2 Uncodified 2026‑42 H56 1.2 1.2 07/01/2026
2026-41 s. 7.60(a) 3 Uncodified 2026‑42 H56 2.1 2.1 07/01/2026
2026-41 s. 7A.7 4 Uncodified 2026‑42 H56 2.4 2.4 07/01/2026
2026-41 s. 9D.4 5 Uncodified 2026‑42 H56 3.2 3.2 07/01/2026
2026-41 s. 9E.19 6 Uncodified 2026‑42 H56 3.1(a) 3.1 07/07/2026
2026-41 s. 9G.6 7 Uncodified 2026‑42 H56 3.4 3.4 07/01/2026
2026-41 s. 11.13 8 Uncodified 2026‑42 H56 4.8(a) 4.8 07/01/2026
2026-41 s. 12.3(a) 9 Uncodified 2026‑42 H56 4.2 4.2 07/01/2026
2026-41 s. 16.24(b) 9.1 Uncodified 2026‑42 H56 5.1(b) 5.1B 07/01/2026
2026-41 s. 17.12 9.2 Uncodified 2026‑42 H56 5.2 5.2 07/01/2026
2026-41 s. 41.2(a) 9.3 Uncodified 2026‑42 H56 8.1 8.1 07/01/2026
2026-41 s. 41.17 9.4 Uncodified 2026‑42 H56 8.2 8.2 07/01/2026
2026-41 s. 42.1(b) 9.5 Uncodified 2026‑42 H56 9.1(a) 9.1 07/01/2026
2026-41 s. 42.2 9.6 Uncodified 2026‑42 H56 9.1(b) 9.1B 07/01/2026
2026-41 s. 44.3(b) 9.7 Uncodified 2026‑42 H56 11.2(a) 9.1C 07/07/2026
2026-41 s. 44.4(b) 9.8 Uncodified 2026‑42 H56 11.3(c) 9.1G 07/07/2026
2026-41 Part 2 9.9 Uncodified 2026‑42 H56 12.1 9.1I 07/01/2026
2026-41 Part 16, s. 26.10 9.9A Uncodified 2026‑42 H56 6.2 6.2 07/01/2026